測點站 的英文怎麼說

中文拼音 [diǎnzhàn]
測點站 英文
observation point
  • : 動詞1. (測量) survey; fathom; measure 2. (測度; 推測) conjecture; infer
  • : Ⅰ名詞1 (液體的小滴) drop (of liquid) 2 (細小的痕跡) spot; dot; speck 3 (漢字的筆畫「、」)...
  • : Ⅰ動詞1 (站立) stand; be on one s feet 2 (停下來; 停留) stop; halt; pause Ⅱ名詞1 (停車點) st...
  1. Fourth, the paper treats two kinds of hoisting projects of high alititude construction in bulk and member assembly, hositing machine and plan layout, setting up scaffold and joints, and installing trunks, branches and joints etc. then in detail discusses the method which applys total station to measure three - dimensional coordinate of dendriform structure, including selecting survey sign points, creating survey system and converting survey coordinate system etc. the paper also deep research on the welding performance, welding method, welding process, welding stress and control, welding strain and rectification, weld defects analysis and weld quality inspection, and so on complicated heterogeneity steel weld proplems

    接著系統的論述了高空散裝法和分單元安裝法兩種樹狀結構吊裝方案,樹狀結構吊裝機械及平面布置,樹狀結構胎架及節的搭設,以及樹狀結構樹干、樹枝和節的吊裝工藝等諸多工藝問題。詳細的論述了採用全儀對樹狀結構進行空間三維坐標量的方法,包括量標志的選取、量系統的建立及量坐標的轉換等問題。深入地研究了樹狀結構可焊性、焊接方法、焊接工藝、焊接應力及控制、焊接變形及矯正、焊接缺陷分析及焊接質量檢查等復雜的異種鋼焊接問題。
  2. Z coordinate and direction angle of the instrument can be calculated and reset by measuring z coordinate of known points ( max. 10 points ) displayed

    通過觀已知的高程(最多10個)來計算並重新設置的高程與方位角。
  3. Based on the demand of power department, a full distributed multifuncitional monitoring device is studied. this instrument not only can measure the data of hydroelectric plant, but also integrate the funcition of control the dynamotor, by cooperate with the program of epigynous system, it can realization the auto generate electricity on the hydroelectric plant and ordinal startup - stop of the dynamotor. 2 furthermore, performance of integrated dft arithmetic enhances the acturacy and reliability of measure. by communication several devices can run online to be controlled dispersedly and managed centrally

    本文分析了國內外水電自動控制裝置的研究和發展狀況,尤其是國內小型水電的自動化現狀,針對現有電力部門的需求,設計並實現了一種單元式的微機自動監控裝置,該裝置不僅實現了對水電內各種模擬參數和數字信號的實時監功能,還對水輪發電機組進行了調控,通過與上位機處理程序的配合,可以實現水電的自動發電控制、機組順序啟停;在量發電機組機端電壓和電流參數的時候,採用32離散傅立葉演算法( dft ) ,增加了量的準確性和可靠性;通過通訊可以實現裝置的聯網運行,做到「分散控制、集中管理」 。
  4. On 4 february 1975, the commune or brigade leading cadres would have obtained information directly or indirectly from six different sources : ( 1 ) the general provincial warning relayed to them through city and county committees, ( 2 ) in the case of yingkou county, an evacuation order from the county committee, ( 3 ) nearby earthquake observatories, particularly the shipengyu observatory, ( 4 ) local amateur precursory monitoring groups such as the team of the haicheng observatory, ( 5 ) neighboring villages and industrial units, and ( 6 ) the foreshocks and the damage they were already causing

    1975年2月4日,公社或大隊領導幹部直接或間接從六個不同的來源獲得信息: ( 1 )通過市級與縣級革委會傳達給他們的總的省一級的警告; ( 2 )在營口的例子中,撤離的命令由縣革委會下達; ( 3 )附近的地震觀,特別如石硼峪地震觀的情況; ( 4 )地方的業余前兆檢工作組,如海城地震觀( 「群」 ) ; ( 5 )附近的村莊與企業,與( 6 )前震以及已經造成的損失。
  5. After this method is putted into practice, the number that total diagnosis nodes is thirty percent of the total grounding grid nodes. 110kv dianfa, 220 kv youting and 220 kv renhe substation grounding grid erosion optimized diagnosis experiments are done in practice

    採用優化的初步量方法后,整個診斷所需的量節對數約為30 % .進行了典發110kv 、郵亭220kv 、人和220kv變電現場實
  6. Because of adopting fixed groundwork, position of every observation station is immovability, agility of instrument is poor, singular fixed stand can not meet the need of modern equipment

    由於採用固定地基的方式,各觀的位置不動,儀器設備的機動性差,單一的固定已不能滿足現代化的裝備要求。
  7. Locations of anemometers and tide gauge stations mentioned in this publication

    本年報內提及的及潮汐之分佈地
  8. And has already registered in his or her preferences that english is the only acceptable language, infopal would guess from the ". fr " extension that the requested site is in french, and automatically redirect the request through babelfish. for example

    ,而且已經在參數選擇中事先登記只接受英語,那麼infopal從擴展名「 . fr 」里猜是一個法語,它就會自動把用戶的請求重定向到babelfish (例如:
  9. To overcome this problem, not only the meteorological observation network has to be equipped with automated, higher precision, and more economical devices and instruments, but also a synthetic mobile observation system is required for filling in the data gaps between the surface and upper air sounding stations

    為了克服這一問題,除了研製自動化程度高、量精度高和性能價格比高的儀器設備來裝備現有的定大氣觀網外,還應建設一些流動的大氣監系統,以獲得常規大氣觀空檔間(如大洋、山區和荒漠等無人區)的天氣現象和大氣環境變化的信息。
  10. Among these tide gauge stations, the station at north point measured the sea level of victoria harbour from 1954 to 1985. the station continued collecting sea level data after relocation to quarry bay in 1986. to date, more than 50 years of data have been collected which is the longest and most complete tidal record in hong kong

    香港天文臺在全港多處地設有量海面高度,其中在北角的提供了一九五四至一九八五年維多利亞港的水位資料,在一九八六年移至?魚涌繼續運作,至今所收集的數據長達五十年,是香港最長及最完整的水位記錄。
  11. As to the tunnels of jinping hydroelectric power station in sicuan province, the thesis discusses how to reasonably consider the initial stress field when designing a large - scale tunnel with high initial stress and deep buried. first, by analyzing of the rock lab tests and discusses the feature of regional geomorphology. explains the production of initial stress field, analyze the initial stress of jinping hydroelectric power station ; second, using the fem, the paper creates the real model of region. according to the results of stress measurement point, by combining of ann and fem to decide the boundary condition, the paper calculates the initial stress field ; at last, the paper analyzes the influence of the initial stress field formed from different condition on the deformation and stress of the surrounding rock, and the main factor to influence the initial stress. on the basis of the former work, the author proposes some proposals, which will be helpful for studying and designing of the similar undergroun d engineering

    首先從巖體的應力?變形的特性入手,並結合工程區域的地形地貌特徵,對巖體初始地應力場的形成做出解釋,結合錦屏水電初始地應力的現狀提出了將地應力場進行分帶;然後建立整個工程區的實體模型,在地質分析的基礎上,以工程區右半部分為代表,參照實的初始地應力值,採用了神經網路與有限元相結合的方法反演了該區域的初始地應力場;最後模擬隧洞的開挖,通過計算比較分析了初始地應力場對處于不同應力帶內的隧洞圍巖穩定性的影響,在此基礎上提出了作者的建議,力圖為該類工程的研究設計工作提供有益的幫助。
  12. Mr yeung said, " regional climate change study is a key area of work of the hong kong observatory. " besides, as crustal movement would affect sea level measurement, the hong kong observatory in co - operation with the lands department and hong kong polytechnic university has started to make measurement of the vertical ground movement at tide gauge stations, using satellite - based global positioning system techniques, since 2004. the data will support long term sea level change studies in future

    楊繼興表示:研究本地區氣候變化是香港天文臺工作重之一。此外,由於地殼移動可能對海面水位定有影響,香港天文臺與地政總署及香港理工大學合作由二四年起利用全球定位系統衛星技術,定期所在地殼的升降情況,支援日後本港長期海平面變化的研究。
  13. In order to develop mostly effects of repeaters, all project executions have been measured on fields before installation, and then, effect and area of coverage is evaluated according to the results of the measuring

    為了最大限度發揮cdma直放工作效果,在工程實施安裝前均進行了實地,並按照的結果對覆蓋效果及覆蓋面積進行初步估算。
  14. The paper has made detailed observation by the existing apparatus and the field observation stations. based on the image and the vector database of the yutian oasis, the study has obtained the precise coordinates of investigation points by gps technique, and overlapped them with the images. after classifying the images with the maximum likelihood supervised classification method, we import the result into cis software, and analyze the yutian oasis changes about land cover " s quantity, quality and spatial position from 1976 to 2001

    本文利用現有儀器設備和野外觀進行詳細觀,在建立於田綠洲圖像庫和矢量數據庫的基礎上,運用gps技術取得野外考察樣的精確坐標並與研究區各時期影像疊加,對影像進行了最大似然法監督分類,並將分類結果轉入gis軟體處理,全面分析了1976年至2001年該綠洲的土地覆蓋類型數量、質量與空間上的變化。
  15. Figure 1. 1 locations of anemometers and tide gauge stations mentioned in this publication

    圖1 . 1本年報內提及的及潮汐之分佈地
  16. In the newly revised system, why only 8 anemometer stations but not all are chosen as the reference stations

    在新修訂系統下,為什麼只選取8個作為參考?為什麼不選用所有的
  17. The locations of anemometers and tide gauges mentioned in this report are shown in

    是本年報內提及的各個風速表及潮汐的分佈地
  18. There are five survey stations in the south and north main trench of xiaoxiang reservoir. the system watches real time the change of water level and the quantity of flow in the five survey stations. so the water resource can be managed systematically and scientifically, some unrational and unscientific management for human subjectivity as before will be avoided

    瀟湘水庫的南乾渠上布置了瀟湘水庫、層板廠、南乾渠管理所、湯家山村和大觀音山村五個,系統實時監這五個的水位和流量的變化,使灌區對水資源的管理達到系統化、科學化的高度水平,避免灌區的人為主觀管理的不合理性和不科學性。
  19. The monitoring station set up three atmospheric sampling sub - stations, three river water monitoring sub - stations and 27 traffic noise monitoring sub - stations in downtown lhasa and the upper, middle and lower reaches of the lhasa river

    在拉薩城區及拉薩河的上、中、下游設立了3個大氣采樣、 3個河水監和27個交通噪聲監
  20. Testing site map binding

    地圖綁定
分享友人