湖泊級 的英文怎麼說

中文拼音 []
湖泊級 英文
lake
  • : 名詞1 (被陸地圍著的大片積水) lake 2 (指湖州) short for huzhou3 (指湖南、湖北) a name referr...
  • : 泊名詞(湖) lake
  • : Ⅰ名詞1 (等級) level; rank; grade 2 (年級) any of the yearly divisions of a school course; gra...
  • 湖泊 : lakes
  1. The yanchang formation is divided, for the first time, into six third - order sequences, each with an average time duration of about 4. 5 ma. the single sequence is composed of deltaic and lacustrine sandstones, siltstones and mudstones. the subaerial and subaqueous distributary channel and channel - mouth bar sandstone reservoirs are well developed mainly in the lowstand and highland systems tracts

    論文在富縣探區首次應用陸相層序地層學的觀點和方法,把延長組劃分為6個三層序,平均時限4 . 5ma ,各層序由三角洲與相砂、泥巖沉積組成,主要在低位體系域和高位體系域發育水下(上)分流河道和河口砂壩砂巖儲層
  2. The main conclusions are as follows ; firstly, under the influence of three phases of episodic activities, three two - order sequences is composed of three depositional cycles and three regional unconformities ; secondly, under the control of structure activities such as fault - block activities and the influence of three - order climate cycles and source recharge, lower cretaceous can be divided into six three - order sequence ; thirdly, because fault activities is weak and fault slope is gently, fan deltas exist in steep slopes in early and later stages and subaqueous fans exist and turbidite fans exist in troughs in middle stage

    主要的結論為:其一,受三期幕式活動影響,斷陷形成了3個大的沉積旋迴和3個區域不整合面,構成了下白堊統3個二層序;其二,受斷陷內翹傾和塊斷等構造活動的控制,以及三氣候旋迴和物源供給因素的影響,下白堊統劃分出6個三層序;其三,在單斷斷陷盆中,階段的早、晚期由於凹陷邊界斷層活動較弱,斷面較緩,陡坡可以發育扇三角洲,在階段的中期主要為水下扇砂礫巖體,並在窪槽區發育濁積扇。
  3. Article 7 people ' s governments at all levels should intensify the unified leadership over the work for flood control, organize departments and units concerned, mobilize social forces, depend on scientific and technological progress, harness rivers and lakes in a planned way and take measures to enforce the construction of flood control works in order to consolidate and enhance flood control capacity

    第七條各人民政府應當加強對防洪工作的統一領導,組織有關部門、單位,動員社會力量,依靠科技進步,有計劃地進行江河、治理,採取措施加強防洪工程設施建設,鞏固、提高防洪能力。
  4. When the water situation of any river or lake approaches the guaranteed water level or the safety flow capacity, or when the water level of any reservoir approaches the level of design flood, or when a great danger occurs to flood control works, the flood control headquarters under the relevant people ' s government at or above the county level may declare an emergency flood season

    當江河、的水情接近保證水位或者安全流量,水庫水位接近設計洪水位,或者防洪工程設施發生重大險情時,有關縣以上人民政府防汛指揮機構可以宣布進入緊急防汛期。
  5. Preliminary treatment covers removal of larger suspended solids and heavier inorganic particulates through mechanical bar screening, gravitational sedimentation and flotation to keep the subsequent unit operations and processes from clogging and abrasion and to maintain the designed functions of the equipment. commonly used preliminary treatment equipment includes bar screen, fine particle sieving, grit chamber, pre - aeration, grease well and scraping chamber, etc. domestic companies have the capability of manufacturing all equipment except fine sieves

    兩大類,其他還有地下水污染處理、海洋港口污染處理、水庫污染處理等,所需之處理設施大致有攔污設備、沉砂設備、除油設備、沉澱設備、過濾設備、生物處理相關設備、污泥脫水設備、加藥設備、高處理相關設備等。
  6. Article 9 relevant departments under the state council and local people ' s governments at various levels shall, when developing, utilizing, regulating and allocating water resources, make integrated plans for maintaining proper river flows, proper water levels of lakes, reservoirs and proper ground water tables, in order to retain the natural purification capacity of water bodies

    第九條國務院有關部門和地方各人民政府在開發、利用和調節、調度水資源的時候,應當統籌兼顧,維護江河的合理流量和、水庫以及地下水體的合理水位,維護水體的自然凈化能力。
  7. Article 21 the control of rivers and lakes shall follow the principle of unified control in line with water systems combined with control at different levels in order to strength the protect ion and ensure the smooth passage

    第二十一條河道、管理實行按水系統一管理和分管理相結合的原則,加強防護,確保暢通。
  8. In general, three developing phases of models of lake eutrophication have been arisen : ( 1 ) single limited factor models, such as the phosphorus model. ( 2 ) models of multiple limited factors, such as models for predicting the primary production of phytoplankton. ( 3 ) eco - dynamic models, which are the main developing trend of lake models at present and for the future

    總的來說,富營養化模型大概經歷了以下三個發展階段: ( 1 )單限制因子模型,如磷模型; ( 2 )多限制因子模型,如浮游植物初生產力估測模型; ( 3 )生態動力學模型,它是目前也是以後發展的主流。
  9. Other river courses and lakes shall, according to the designation of the water conservancy administrative department under the state council or its authorized agencies, be under the control of water conservancy administrative departments under local people ' s governments at or above the county level

    其他河道、,由縣以上地方人民政府水行政主管部門按照國務院水行政主管部門或者國務院水行政主管部門授權的機構的劃定依法實施管理。
  10. Lake kawaguchi is one of the five lakes and is the most popular, where you can enjoy spectacular views of mount fuji and indulge in superb onsen hot springs

    河口是這五之一也是當中最著名的在此您可盡享富士山的迷人景色以及沉浸在超的溫泉中。
分享友人