溝堤 的英文怎麼說

中文拼音 [gōu]
溝堤 英文
furrow dam
  • : 名詞1 (挖掘的水道或工事) channel; ditch; gutter; trench 2 (淺槽;似溝的窪處) groove; rut; furr...
  • : 堤形容詞[書面語] (水清見底的樣子) (of water) clear
  1. Facilities include the land of plenty guangdong style restaurants, a beautifully - designed restaurant is renowned for authentic cantonese cuisine ; home western restaurant and japanese restaurant offer a distinctive and global dining experience ; the butterfly ; flower lobby bar in the atrium serving light snacks and beverages ; karaoke rooms are eponymous with fun and laughter ; sauna club for leisure and rejuvenation ; multi - shops, cigar bar, well - equipped recreation facilities and large - sized parking lot will ensure the satisfaction of your demands

    歡樂豪華的ktv ,帝王級享受的翠灣桑拿,是您商務休閑會議娛樂最佳之選餐飲設施180個餐位的雅谷西餐廳,開放式製作,美味無國界,國際大廚與您互動通,充分享受海陸空自助大餐之樂趣。
  2. The author presume the original physiognomy of jiuzhai valley, and acknowledged changhai valley was a surface - water with uniform waterpower, the rize valley was a branch of it but the inequality rise of lithosphere, the deposit of earthquake landslides debris flows and falling or glacier blocked the river - way, furthermore, the flow water with high content of ca ( hco3 ) 2, so tufa dyke formed and evolvement the present dyke of lakes the present physiognomy formed on the base of those 2

    由於地震、滑坡、泥石流引起的堆積物和冰川作用形成的冰磧物堵塞河道,再加上構造運動造成地殼的不均勻抬升,九寨的這種獨特的地質環境以及高含ca ( hco _ 3 ) _ 2的巖溶水流作用下,為caco _ 3沉積創造條件,沉積的caco _ 3加高、連接最終形成灰華壩,使湖泊的形成成為可能。
  3. The company anton berkenheger gmbh & co. kg offers services from the ranges road, rail and canal construction, embankment mower in addition to pit cleaning devices

    Kg是一家生產不同尺寸邊割草機,清器,街道、軌道和渠道建築的企業。
  4. In order to eliminate the hidden trouble caused by storm runoff erosion, the mechanism of the storm runoff erosion on the slope surface of the yellow river dykes has been studied in this thesis. through the simulation rainfall experiments and field observations, the formation mechanism of storm runoff scouring, rills and sockets have been opened up. meanwhile the possible control measures have been suggested

    為了防治黃河大由於暴雨徑流沖刷造成的不安全隱患,本文針對黃河大上的暴雨徑流侵蝕進行了實地設站觀測及室內模擬降雨侵蝕試驗,通過揭示大暴雨沖刷過程機理,查清水、水穴(浪窩)等的成因,提出相應的防治對策。
  5. Through discussion of numerical solution, the author get the effect of height of filled soil, size of culvert, width of valley, property of filled soil, construction procedure and techniques on soil stress of the culvert top ; 3. through the centrifuge test, the paper validates the reliability of numerical calculating on high - stack soil ; 4. the paper puts forward the simplified calculating method of soil stress of the culvert top on the foundation of numerical simulating and centrifuge modeling

    通過對數值解的討論,得到填土高度,涵洞截面尺寸,谷底部寬度,壁坡角,填築體性狀,施工速度,地下水對豎向位移場及涵洞頂部土壓力的影響情況; 3通過離心機的模擬試驗,驗證了數值計算對高路的計算結果的可靠性; 4在數值模擬和室內離心機模型試驗的基礎上,提出了高填方涵洞頂部土壓力簡化計算方法。
  6. Culvert under high - stack soil is a ubiquitous phenomena in road constructions in mountain, self - compression of high - stack soil can not be ignored, soil pressure at the top of culvert is affected by many factors, including the height of high - stack soil, section size of culvert, width of the bottom of valley, grade of valley, property of filled soil, construction procedure and techniques

    高路下埋設涵洞是山區公路建設的一種較為普遍的現象,高路自身壓縮較大,不可忽視,涵洞頂部土壓力的大小又受很多因素的影響,包括填土高度,涵洞截面尺寸,谷底部寬度,壁坡角,填築體性狀,施工工序與工藝等。
  7. 3, logging curve comparison results show that in the west part of south region there is a grade 4 normal fault, and the separation is 4 - 6 meters. five microstructure types and 8 top and bottom composition patterns have been proposed. the relationship between microstructure and deposition facies was studied and the genesis relationship was confirmed, that is, top microstructure is mainly corresponding to nature levee, contrasting to that of the bottom microstructure

    提出了五種微構造類型及八種頂底微構造組合模式;並研究了微構造與沉積相的關系,發現它們之間存在一定的成因聯系,即頂面微構造中高點、鼻狀和斷鼻構造主要對應于邊灘微相,低點與槽微構造則主要對應于天然微相,而底面微構造正好與之相反。
  8. If it is really necessary to stuff or block up or demolish them, consent should be obtained from the water conservancy administrative department and the case be reported to the people ' s government of the city for approval

    城市建設不得擅自填堵原有河道叉、貯水湖塘窪淀和廢除原有防洪圍;確需填堵或者廢除的,應當經水行政主管部門審查同意,並報城市人民政府批準。
  9. The model was used to analyze the stability of reinforced high embankment in beizhang gully area, and the result accorded with the facts, which verified that the effecting factors of the stability of reinforced high embankment can be described more comprehensively by the fuzzy information optimization method and the result is reasonable

    通過對北張加筋高填路進行的穩定性分析,表明該模型能較全面地考慮加筋高路邊坡穩定性的影響因素,評價結果合理。
  10. The solidity dykes is the basic guarantee. with the heightening of the dykes of the yellow river every year, it became higher and steeper. there are many rills and puddles on the dyke slopes

    由於黃河大逐年加高,大形成了高且陡的土坡,每逢暴雨後,在黃河大坡和戧坡區常有條條水以及戧臺區的、水穴(浪窩) 。
  11. Engineers then typically dig out shallow trenches or pits along the path to obtain earth for the levee

    工程師通常會沿預定路線挖出淺淺的壕或土坑,取得海用的泥土。
  12. So, from the great cliff ' s base, jut spokes of rock crossing from bank to bank, intersecting ditches until the pit ' s hub cuts them off from meeting

    就像這樣從巖石的基礎有危巖通出去而跨越岸和壕,降到那把它們截斷和集合起來的井。
  13. A raised bank or path, such as one along a canal

    岸,小路高出的岸或小路,如沿著一條渠的岸或小路
  14. Analyses on seepage control efficiencies of cut - off walls an d relief ditch in the levee engineering of niutun river

    牛屯河防工程防滲墻及減壓滲控效果分析
分享友人