溝水 的英文怎麼說

中文拼音 [gōushuǐ]
溝水 英文
ditch-water
  • : 名詞1 (挖掘的水道或工事) channel; ditch; gutter; trench 2 (淺槽;似溝的窪處) groove; rut; furr...
  • : 名詞1 (由兩個氫原子和一個氧原子結合而成的液體) water 2 (河流) river 3 (指江、河、湖、海、洋...
  1. Based on the data, infiltration parameters k, ai and bi were obtained according to the flow advance and recession course of the stream in the furrow, on the base of which, the model of surge furrow irrigation was set up

    基於田間實測的田間入滲及灌試驗資料,利用灌溝水流推進、消退過程,求得波涌灌入滲參數k , a , a _ i和b _ i ,並由此得出波涌灌的入滲模型。
  2. It elucidates the grade and layout of the construction diversion structures, testifies the technical rationality and economic advisability that the alternative of the cofferdam uses to dam up the discharge ( p = 10 %, q = 275. 2m3 / s ) during the post - flood period, was made by hydraulic calculation, structural design, investment comparison, progress analysis and investment risk analysis

    文中說明了施工導流建築物的等級、工布置。通過力學計算、結構設計、導流方案投資比較、進度分析和投資風險分析,說明了四湖溝水利樞紐工程採用圍堰擋汛后時段洪導流方案的合理性和經濟性,為施工決策提供理論依據。
  3. Filling construction design of uockfill dam with face slab in shuanggou water power station

    溝水電站面板堆石壩填築施工設計
  4. Feasibility analysis of xiaojinxhou navigation and power complex construction

    藤子溝水電站廠房設計
  5. The hakka treasure their own historical legacy and there are many fascinating historic landmarks, amongst them the famous matsu temple and changli shrine in neipu, the hsiao residence in chiatung the current restoration is due to be finished in early 2003, and the liu family ancestral hall in wukoushui

    客家族群慎終追遠,留有許多古跡,其中內埔鄉有著名的天後宮與昌黎祠,佳冬的蕭家古宅九十二年初整修完畢與五溝水劉氏宗祠也頗有可觀。
  6. In positive analyse, under the discussion of jinshao and shuangling water pivot engineerings and shiliugou power station, an index system including four indice on investment, economic return, environmental benefit and social benefit is established and a comprehensive assessment is made in use of the qualitative and quantitative method and the fuzzy multi - level and multi - objective assessment

    在實證分析方面,針對遼寧省的金哨利樞紐工程、雙嶺利樞紐工程和石榴溝水電站三個典型電站,建立了投資指標、經濟效益指標、環境效益指標和社會效益指標等四個功能塊指標體系,並採用加性加權法及其模糊多目標多層次綜合評價方法進行了綜合評價決策。
  7. In order to eliminate the hidden trouble caused by storm runoff erosion, the mechanism of the storm runoff erosion on the slope surface of the yellow river dykes has been studied in this thesis. through the simulation rainfall experiments and field observations, the formation mechanism of storm runoff scouring, rills and sockets have been opened up. meanwhile the possible control measures have been suggested

    為了防治黃河大堤由於暴雨徑流沖刷造成的不安全隱患,本文針對黃河大堤上的暴雨徑流侵蝕進行了實地設站觀測及室內模擬降雨侵蝕試驗,通過揭示大堤暴雨沖刷過程機理,查清穴(浪窩)等的成因,提出相應的防治對策。
  8. Nowadays, 66 markets have got its initial scale, among which the guzhuang wood market, sagou fresh water produces wholesale market and chushui supermarket are trading with the businessmen from the middle part of jiangsu well - known native products

    目前全市已形成規模市場66個,其中,顧莊木材市場,沙溝水產品批發市場,楚招商城輻射蘇中地區。
  9. Design of hydrogenerator house in tengxigou water power station

    四湖溝水利樞紐壩型比較施工導流設計
  10. Clogged pipes backed up drain water

    阻塞的管堵塞了溝水
  11. What little grass there was in the yard was plastered sparsely down on the ground, the way the drainage water had left it.

    院子里那一點點青草現在稀稀拉拉緊貼在地面上,就象是陰溝水流過以後那樣。
  12. Calculation of concrete temperature control for dam in tengzigou water power station

    藤子溝水電站大壩混凝土溫度控制設計
  13. Some primary researches are given in this paper, combined with the project - stability evaluation of concrete high arch dam of tengzigou, which is cooperated between hydraulic structure center of hohai university and dongbei hydroelectric investigation & design ltd. considering actual research work and specification, either concrete strength limit analysis of dam or shear failure of seams in rock abutments are taken singly into account for safety evaluation of high arch dam

    本文就這個問題,結合河海大學工結構所和利部東北勘測設計研究有限責任公司的合作項目?藤子溝水電站雙曲拱壩整體穩定性分析,在這方面做了一些初步研究。現行規范將壩體混凝土強度校核和壩肩穩定安全度評價分開進行,沒有考慮兩者的關聯性,然而這兩類破壞常常是相互聯系,伴隨發生的。
  14. This article expounds the construction diversion scheme and countermeasure of sihugou key hydroproject in a cold region

    本文論述了四湖溝水利樞紐工程施工導流方案和對策。
  15. Trough the analysis of stabilization safety on tengzigou arch dam, some conclusions are obtained in the following : ( 1 ) tengzigou arch dam is safe under normal poll level ; ( 2 ) stabilization safety factor of tengzigou arch dam is about 4 - 5 ; ( 3 ) it is proved that combinatorial reinforcement measures are effective and feasible

    對藤子拱壩的數值計算和模型試驗分析表明: ( 1 )藤子溝水電站在正常蓄位作用下,壩體和兩岸壩肩是穩定的; ( 2 )藤子拱壩的整體安全度大概為4 5左右; ( 3 )東北院提出的對左岸泥巖層挖除處理並用混凝土置換的加固除險措施經研究表明該加固措施是有效、可行的。
  16. This article first introduces physical geography general situation, clarifies the rank of this hydroproject, the grade and layout of its hydraulic structures, and expounds the necessity and feasibility of this project. then, this paper further gave a clear explanation of the developing summarize of construction diversion for embankment dams. this study made a theoretical preparation for its construction diversion

    本文首先介紹了四湖溝水利樞紐工程的天然地理概況,闡明了工建築物的等級及工程布置,說明了四湖工程建設的必要性和可行性,文中進一步闡明了土石壩施工導流發展的概況,為四湖溝水利樞紐工程施工導流作出了理論上的準備。
  17. According to the analysis of the data of field observation and the simulated rainfall erosion experiment in lab, the results showed that there were many differences in the formation mechanism and development processes between the rills and sockets

    3 、穴(浪窩)的成因穴(浪窩)都是降雨徑流侵蝕的產物。野外實地觀測和室內降雨侵蝕試驗研究表明,兩者在成因和發展過程上存在著差異。
  18. Technical condition to rotor aerator with horizontal shaft used in oxidation ditch

    氧化溝水平軸轉刷曝氣機技術條件
  19. Treatment of crack in concrete plate of channel lining at xinyigou reservoir

    信邑溝水庫過壩渠道襯砌砼板裂縫的處理
  20. A long narrow trench or furrow dug in the ground, as for irrigation, drainage, or a boundary line

    渠,排道在地面上狹長的渠或細,用於灌溉、排或用作分界線
分享友人