溝試驗 的英文怎麼說
中文拼音 [gōushìyàn]
溝試驗
英文
channel test-
At the same time 7794m3 affusion test were processed, and roadbed settlement observation conducted for two more year, physical mechanism and chemical index experiment were analyzed in the laboratory, section experiment of earth sample was proceed, changement of compacted soil body micromechanism along with depth were analysed by polariscope and scan electricscope. drain ditch, barrel - drain and little bridge were treated by composite geotextile
在室內進行了物理力學、化學指標實驗分析,並對土樣結構進行了切片試驗,用偏光顯微鏡和掃描電鏡分析了土壤碾壓后沿深度分佈的土體微觀結構變化情況,對邊坡、邊溝、排水溝、小橋涵及護坡封水採用復合土工布進行處理。Application of bubbler irrigation to spring maize and winter wheat planted in furrow with film mulching on ridge
冬小麥湧泉灌溉與壟膜溝種的組合應用試驗In the third part, a comprehensive check experiment was made on percolation irrigation and furrow irrigation : the percolation irrigation is superior to the furrow irrigation for such advantages as saving water, saving energy, increasing production, raising air temperature and ground temperature inside the shelf, lowering air humidity inside the shelf and reducing plights, and ect
第三部分對棚室番茄滲灌和溝灌進行了全面的對比試驗,通過試驗可以得出滲灌較溝灌省水、節能、增產、提高棚室空氣溫度和地溫、降低棚室空氣濕度、減少病蟲害等一系列優點。In vitro studies have demonstrated florfenicol activity against enterobacter cloacae, escherichia coli, klebsiella pneumoniae, salmonella typhi, and shigella dysenteriae
試驗表明,氟苯尼考還能夠抑制陰溝腸桿菌、大腸埃希菌、克雷白氏肺炎菌、傷寒沙門氏菌和志賀氏痢疾桿菌。Brackets for eaves gutters - requirements and testing
檐溝撐架.要求和試驗Based on the data, infiltration parameters k, ai and bi were obtained according to the flow advance and recession course of the stream in the furrow, on the base of which, the model of surge furrow irrigation was set up
基於田間實測的田間入滲及灌水試驗資料,利用灌水溝水流推進、消退過程,求得波涌灌入滲參數k , a , a _ i和b _ i ,並由此得出波涌灌的入滲模型。Dynamic sediment yield of rill erosion
細溝侵蝕動力過程極限溝長試驗研究The results indicated that the ree tracer technology has high precision to quantify the spatial - temporal process of soil erosion ; in earlier rainfall course, the development degree of sheet and nil erosion was general equation ; otherwise in the following course, the rill erosion was dominant in the total erosion, its average erosion acceleration and the average erosion rate was 15 and 9 times of sheet erosion, respectively ; in the end of experiment, the rill erosion took up 90 % of total erosion amount ; the section of slope bottom occupying about 1 / 3 slope area was active erosion segment in this experiment
結果表明: ree示蹤技術對定量研究土壤侵蝕具有較高的精度;降雨前期,片蝕與細溝侵蝕發育程度基本相當;後期細溝侵蝕占據坡面侵蝕的主導地位,其侵蝕平均加速度和平均侵蝕率分別是片蝕的15倍、 9倍;試驗結束,細溝侵蝕占據坡面總侵蝕的90 % ;本試驗條件下,坡面下1 / 3區域為侵蝕活躍帶。The applied experiment of soft tube surge irrigation in the form of planting wheat and cotton in the field ditch
軟管涌流灌在大田壟膜溝種作物的應用試驗研究Experimental study on upslope runoff effects on ephemeral gully erosion processes at loessial hillslope
黃土坡面匯流匯沙對淺溝侵蝕影響的試驗研究Gully erosion, which is universal on original lands, but also the special forms, for example, hole erosion gravel erosion debris slide and debris flow, which is unusual in loess area, ( 2 ) based on a long - term fixed point experiments in proving ground of the south stackpile, the soil erosion factors have been researched quantitatively, the runoff and erosion affected factors have been made sure and the experiential models of producing water and soil have been taken in newly - constructed stage, early stage and later stage of reclamation
確定南排土場原地貌的水蝕模數為3700 4400t km ~ 2 ? a ;在排土場新造地貌上,擊濺、面蝕、細溝侵蝕、淺溝侵蝕、沉陷侵蝕、砂礫化面蝕、土砂瀉溜和坡面泥石流等水土流失形式出現頻率和發生程度都明顯強于原地貌。 ( 2 )以南排土場徑流試驗場長期的定位觀測為基礎,對排土場未復墾時期、復墾初期、復墾後期的土壤水蝕影響因子進行定量研究,確定了徑流和土壤水蝕的主要影響因子及其臨界值,建立了產流產沙的經驗模型。Trench lining systems - part 2 : assessment by calculation or test
溝道內襯系統.第2部分:計算試驗評估法Trenchless construction and testing of drains and sewers
排水管和污水管的非挖溝施工和試驗In order to eliminate the hidden trouble caused by storm runoff erosion, the mechanism of the storm runoff erosion on the slope surface of the yellow river dykes has been studied in this thesis. through the simulation rainfall experiments and field observations, the formation mechanism of storm runoff scouring, rills and sockets have been opened up. meanwhile the possible control measures have been suggested
為了防治黃河大堤由於暴雨徑流沖刷造成的不安全隱患,本文針對黃河大堤上的暴雨徑流侵蝕進行了實地設站觀測及室內模擬降雨侵蝕試驗,通過揭示大堤暴雨沖刷過程機理,查清水溝、水穴(浪窩)等的成因,提出相應的防治對策。Eaves gutters and fittings made of pvc - u - definitions, requirements and testing
Pvc - u檐溝和配件.定義要求和試驗Through discussion of numerical solution, the author get the effect of height of filled soil, size of culvert, width of valley, property of filled soil, construction procedure and techniques on soil stress of the culvert top ; 3. through the centrifuge test, the paper validates the reliability of numerical calculating on high - stack soil ; 4. the paper puts forward the simplified calculating method of soil stress of the culvert top on the foundation of numerical simulating and centrifuge modeling
通過對數值解的討論,得到填土高度,涵洞截面尺寸,溝谷底部寬度,溝壁坡角,填築體性狀,施工速度,地下水對豎向位移場及涵洞頂部土壓力的影響情況; 3通過離心機的模擬試驗,驗證了數值計算對高路堤的計算結果的可靠性; 4在數值模擬和室內離心機模型試驗的基礎上,提出了高填方涵洞頂部土壓力簡化計算方法。In the paper, we firstly acknowledge the characteristic of rainfall kinetic energy and runoff energy, current state and the development of erosion dynamic process by consulting a large number of domestic and foreign literature datum. on the basic, we systemically coordinated the eroded datum of runoff plots of soil and water conservation stations at xifeng, tianshui, suide, and chunhua et al
本文首先在查閱了大量國內外文獻資料,全面了解降雨動能與徑流能量的特性及侵蝕動力過程等方面的研究現狀及最新進展的基礎上,系統整理了西峰、天水、綏德及淳化泥河溝等水土保持試驗站的徑流場侵蝕資料。The collapsible loess is often met during the construction of the high - grade highway in the loess area, and the main failure is the uneven subsidence of the roadbed and the culvert, which affects the safe usage of the roadbed and the culvert, etc. directed against this, based on the chankou - lanzhou freeway construction, the paper analyzes the application of the composite ground formed by lime - soil pile under the bridge and designs the project, discusses the rules of the contact pressure, the stress ratio of the pile and the soil, compares the p - s curves of one pile, the composite ground formed by one pile and the composite ground formed by two piles based on the in - situ plate loading test, evaluates the bearing capacity of the composite ground of the project
黃土地區的高等級公路建設中經常遇到濕陷性黃土問題,其病害類型主要是地基土受水浸濕后引起路基、橋臺、涵洞等的不均勻沉降,直接影響路基、構造物等的正常使用。針對此問題,本文依託甘肅讒口至蘭州柳溝河高速公路建設工程,對橋基灰土樁復合地基應用的可行性進行了深入分析,根據具體工程進行了合理的設計與計算,並配合現場靜載荷試驗及壓力盒實測數據,探討了基底應力分佈規律,樁土應力比,變形模量的變化關系,對比分析了單樁、單樁復合和雙樁復合的p ? s關系,對橋基灰土樁復合地基承載力進行了整體評價。Gullies for buildings - test methods
建築物集水溝.試驗方法Study on the main problems and measures of conversion of cropland to forest project at sijiagou of pingshan country
從平山縣寺家溝試驗示範區建設看退耕還林工作中存在的問題及對策分享友人