溢出位置 的英文怎麼說

中文拼音 [chūwèizhì]
溢出位置 英文
overflow position
  • : Ⅰ動詞(充滿而流出來) overflow; spill Ⅱ形容詞(過分) excessive
  • : Ⅰ名詞1 (所在或所佔的地方) place; location 2 (職位; 地位) position; post; status 3 (特指皇帝...
  • : 動詞1. (擱; 放) place; put; lay 2. (設立; 布置) set up; establish; arrange; fix up 3. (購置) buy; purchase
  • 溢出 : overflow; spill over; runoff; runout; transfluence; spilth; superfusion
  1. According to differences of construction process, boundary condition, temperature and stress of two schemes extending 3m deep short seam on upstream face in the middle of rcc overflow section and no short seam are calculated, what " s more, in this paper the equivalent line drawing of stable temperature field and unstable temperature field during construction and operation period and the duration curve drawing of typical points " s temperature and stress are plotted, and the results of peak and minimum on temperature in every month and maximum on tensile stress are attained

    根據施工過程和邊界條件,對流壩段中間上游面增設3m深短縫和不設短縫兩個方案進行了溫度和應力計算,並繪制穩定溫度場等值線圖及施工期、運行期非穩定溫度場等值線圖,典型點溫度和應力歷時曲線圖,逐月最高、最低溫度和最大拉應力及相應等成果。
  2. In the paper the initial iocation and dimension of step are studied from which we get the conclusion tha the energy dissipation is highcr if the initial location is at the curve section of l / 2 height of the spillway top and the dimension gap of neighbor step is bigger, the energy dissipation is higher

    通過對階梯流壩的過渡階梯的起始和具體尺寸的試驗研究。得過渡階梯的最佳起始約在壩頂曲線段1 2高度處且相鄰階梯的尺寸相差較大時,所得的消能率較高。
  3. In harsh climate region, mere exists obvious local stress concentration near the upstream and downstream of the exposed - in - winter horizontal surface of the rcc dam, and the surface of spillway bucket though heat insulation is applied on the surfaces, tensile stress still exceeds the allowable one of concrete. this paper puts forward to adopt preset crack to avoid occurring more cracks. the special crack model is applied to simulate the dam preset crack, and the joint model of fracture mechanics is induced into strain - soften model

    在結構措施方面,針對嚴寒地區高碾壓混凝土重力壩壩體越冬層面的上、下游面附近及流壩堰面反弧段表面有明顯的局部應力集中象現,在已採取一定的表面保溫防護的條件下,拉應力仍然超過混凝土容許拉應力,開裂難以避免,進而提碾壓混凝土壩表面預留縫結構措施並對該措施進行深入研究,包括預留縫的擴展穩定和壩體沿預留縫的穩定性,以避免大壩在無措施部開裂,解決大壩越冬層面水平施工縫的開裂問題。
分享友人