溢水堰 的英文怎麼說
中文拼音 [yìshuǐyàn]
溢水堰
英文
flush weir-
Research on the automatic weir of water level stabilized by waterpower
水力自動恆定水位溢流堰的研究The ancient project consists of three major projects, namely the yuzui water - dividing dike, the feishayan spillway and the baopingkou water inlet as well as some sub - project baizhang dike, shunshui dike at erwang temple and renzi dike
渠首工程由魚嘴分水堤、飛沙堰溢洪道、寶瓶口引水口三大主體工程和百丈堤,二王廟順水堤、人字堤等主要附屬工程組成。Methods of measurement of liquid flow in open channels - weirs and flumes - round nose horizontal broad - crested weirs
明渠流量測量.第4部分:溢流堰和斜槽.第4f節:圓端水平寬頂堰Based on analysing all kinds of sediment silting basins and their suitable conditions, the traditional sedimentation basin has been improved in three aspects, i. e., setting an adjusting flow board in the fore of setting basin, adding a spillway trough along the flow direction, and redesigning the flush gallery by adding auxiliary flushing facilities
摘要在對各種類型沉沙池及適用條件進行分析的基礎上,通過在沉沙池的首部加調流板、在溢流堰上沿水流方向設溢流槽、對沖沙廊道進行改進並設置輔助沖沙設施這3個方面對傳統沉沙池進行了改進。Shankou spillway project has many specific characteristics, for example, the gate frusta and weir body have equivalent thickness, the weir body is low and have corridor, the foundation of the weir body is " high - low foot " " and the side frusta is also used as retain wall. in view of the characteristics, to better analyze the stress distribution on weir body, gate frusta, the joints between gate chamber and weir body, under the condition that the gate chamber is applied with asymmetrical loads and complicated constraints, three dimensional finite element method is applied in this paper
本文針對山口溢洪道閘墩與堰體底板厚度相當,堰體為低堰且設有廊道、堰體建基面「高低腳」及邊墩兼作擋土墻等具體特點,在閘室設計中采山口水利樞紐工程溢洪道閘室三維有限元整體應力計算分析用三維有限元整體應力計算方法分析閘室的受力狀態,分析閘室在荷載不對稱。Standard guide for selection of weirs and flumes for open - channel flow measurement of water
用於明渠水流量測量的溢流堰和斜槽的選擇的標準導則Dam plants - part 13 : weirs
蓄水設備.第13部分:溢流堰Liquid flow measurement in open channels by weirs and flumes. triangular profile weirs
用溢流堰和水槽法測量明渠中的液體流量.三角形堰In harsh climate region, mere exists obvious local stress concentration near the upstream and downstream of the exposed - in - winter horizontal surface of the rcc dam, and the surface of spillway bucket though heat insulation is applied on the surfaces, tensile stress still exceeds the allowable one of concrete. this paper puts forward to adopt preset crack to avoid occurring more cracks. the special crack model is applied to simulate the dam preset crack, and the joint model of fracture mechanics is induced into strain - soften model
在結構措施方面,針對嚴寒地區高碾壓混凝土重力壩壩體越冬層面的上、下游面附近及溢流壩堰面反弧段表面有明顯的局部應力集中象現,在已採取一定的表面保溫防護的條件下,拉應力仍然超過混凝土容許拉應力,開裂難以避免,進而提出設置碾壓混凝土壩表面預留縫結構措施並對該措施進行深入研究,包括預留縫的擴展穩定和壩體沿預留縫的穩定性,以避免大壩在無措施部位開裂,解決大壩越冬層面水平施工縫的開裂問題。Liquid flow measurement in open channels by weirs and flumes. rectangular braod - crested weirs
用溢流堰和水槽測定明渠中的水流量.矩形寬頂溢流堰分享友人