溢水池 的英文怎麼說

中文拼音 [shuǐchí]
溢水池 英文
overflow tank
  • : Ⅰ動詞(充滿而流出來) overflow; spill Ⅱ形容詞(過分) excessive
  • : 名詞1 (由兩個氫原子和一個氧原子結合而成的液體) water 2 (河流) river 3 (指江、河、湖、海、洋...
  • : 名詞1 (池塘) pool; pond 2 (旁邊高中間窪的地方) an enclosed space with raised sides 3 (舊指劇...
  • 水池 : pond; pool; cistern水池子 pond; pool; sink; [印度] tank
  1. The kitchen sink was full nearly to the brim with filthy greenish water.

    廚房裡的幾乎滿得了出來,盡是發綠的臟
  2. The improvement plan for the right bank revetment of the first - step stilling basin for the normal spillway of huangbizhuang reservoir is optimized for many times, which has met the requirements to save the investment, shorten the construction period, guarantee the continuity of the boundary and satisfy the operation of the project at last

    摘要黃壁莊庫正常洪道一級消力右岸躺坡改建方案經過多次優化,達到了節約投資、縮短工程工期,保證了邊界的連續性,滿足工程運用要求。
  3. Based on analysing all kinds of sediment silting basins and their suitable conditions, the traditional sedimentation basin has been improved in three aspects, i. e., setting an adjusting flow board in the fore of setting basin, adding a spillway trough along the flow direction, and redesigning the flush gallery by adding auxiliary flushing facilities

    摘要在對各種類型沉沙及適用條件進行分析的基礎上,通過在沉沙的首部加調流板、在流堰上沿流方向設流槽、對沖沙廊道進行改進並設置輔助沖沙設施這3個方面對傳統沉沙進行了改進。
  4. For floors where abrasion and impact resistance as well as dust - proof are required such as for shed, loading area at port, machinery industry, aitcraft parking apron, garage, parking area, oil storage piant, pathway floor, mine chute, bridge surface, reservior overflow relief channel, energu consumption. loading slope, military industry, weaving mills, cold storage plant, automobile industry, electronic industry express highway, etc

    倉庫、碼頭裝卸區、機械工廠、飛機停機坪、車庫、停車場、油料庫、通道地面、工礦溜槽、橋面、洪道、交通、裝卸斜坡、軍工企業、紡織業、冷凍庫房、汽車工業、電子工業、高速公路等適合金屬骨料要求的混凝土地面。
  5. To the inferior trap of rock - bottom building, ought to want special attention the following problem : ( 1 ) notice indoor moistureproof design, the ground outside basically observing indoor ground is compared wants tall how many, moistureproof measure how, judge thereby, the building fights damp ability, whether to live aptly ; ( 2 ) notice indoor facilities is designed, conduit of indoor fluctuation catchment is reasonable, observe whether conduit distribution is equitable, expedite, jam not easily ; ( 3 ) notice the establishment outdoor is designed, whether is the system such as room of the raceway groove outside be like, cesspool, water pump, catchment designed reasonable, accessary establishment leaves living room whether too close, this basically is to prevent to be all round the building generation seeper, especially after big rainstorm, be like catchment not free, the excessive outside possible sewage, by water adj / lit wide

    對于底層房屋的劣質陷阱,應當要非凡注重以下問題: ( 1 )注重室內地面防潮設計,主要觀察室內地面比外地面要高多少,防潮措施如何,從而判定,房屋抗潮濕的能力,是否適宜居住; ( 2 )注重室內設施設計,室內上下排管道是否合理,觀察管道布局是否合理,是否暢通,不易堵塞; ( 3 )注重室外設施設計,如外溝道、化糞泵房、排等系統是否設計合理,附屬設施離居住房是否太近,這主要是為了防止在房屋四周產生積,非凡是大暴雨後,如排不暢,有可能臟,被淹。
  6. Predicted overflow water quality from new lakes and existing reservoir will comply with the water quality objectives at port shelter

    預計新湖及現有蓄會符合牛尾海質指標。
  7. The water from the burst cistern penetrated through the ceiling of he room beneath

    出的滲透房頂滴到下面的房間里。
  8. The paper also introduced the applied situation of the actual projects about the t type barrier stilling basin through the helong reservoir spillway ' s hydraulic model experiment

    本文還通過河龍洪道工整體模型試檢,描述了t形墩消力在實際工程中的應用情況。
  9. Overflow and seepage from septic tanks and soakaways in unsewered villages, though not such a major problem on lantau as in other parts of hong kong, still contributed to river water pollution

    在大嶼山有些無污管道的鄉村存在化糞及滲流和滲漏的問題,雖然污染程度不及香港其他地區嚴重,但也會影響河溪質。
  10. Most of these village houses treated their effluent using primitive septic tanks that tended to leak or overflow after heavy rain. photo of

    這些村屋用較簡單的化糞處理污,每逢暴雨後化糞往往漏造成污染。
  11. The correction factor of the pressure of cross section before a hydraulic jump in stilling basins under nappe flow of stepped spillways

    跌落流時臺階式洪道消力躍前斷面壓力修正系數
  12. In view of the environmental problems that may be caused by the overflow of sewage from private treatment facilities ( such as septic tanks and soakaway systems ) of village houses in the new territories, epd conducted over 670 special inspections in 2002. during the inspections, epd staff examined carefully the operations and maintenance of these treatment facilities. depending on the results, they would give verbal guidance or advice to the owners, request them to rectify the irregularities or, where necessary, replace the entire facilities

    針對新界鄉郊村屋的化糞及滲濾系統等私人污處理設施可能會出污污染環境的情況,環保署於2002年共進行了超過670次的特別巡查,詳細檢查這些設施的運作及保養,按檢查的結果向戶主發出口頭指引、勸喻,或要求戶主作出改善。
分享友人