溢流堰段 的英文怎麼說
中文拼音 [yìliúyànduàn]
溢流堰段
英文
weir section-
The analysis show that the project target of detaining the coarse and discharging the fine can be got with the related measures, such as placement of the warping sluice on the concave bank of a bending reach ; arrangement of the overflow weir on a bending reach and reasonable zoning and scientific control of the desilting channels etc
分析表明,採用將放淤閘布設在彎道上段的凹岸、彎道設置溢流堰、淤沙條渠的合理分區和科學調度等措施,可以實現試驗工程淤粗排細的目標。In harsh climate region, mere exists obvious local stress concentration near the upstream and downstream of the exposed - in - winter horizontal surface of the rcc dam, and the surface of spillway bucket though heat insulation is applied on the surfaces, tensile stress still exceeds the allowable one of concrete. this paper puts forward to adopt preset crack to avoid occurring more cracks. the special crack model is applied to simulate the dam preset crack, and the joint model of fracture mechanics is induced into strain - soften model
在結構措施方面,針對嚴寒地區高碾壓混凝土重力壩壩體越冬層面的上、下游面附近及溢流壩堰面反弧段表面有明顯的局部應力集中象現,在已採取一定的表面保溫防護的條件下,拉應力仍然超過混凝土容許拉應力,開裂難以避免,進而提出設置碾壓混凝土壩表面預留縫結構措施並對該措施進行深入研究,包括預留縫的擴展穩定和壩體沿預留縫的穩定性,以避免大壩在無措施部位開裂,解決大壩越冬層面水平施工縫的開裂問題。Hydraulics research on flood - releasing during construction period of heightened scheme of dangjiangkou dam
丹江口大壩加高堰頂溢流段施工渡汛試驗研究
分享友人