溢流計 的英文怎麼說

中文拼音 [liú]
溢流計 英文
weir meter
  • : Ⅰ動詞(充滿而流出來) overflow; spill Ⅱ形容詞(過分) excessive
  • : Ⅰ動1 (液體移動; 流動) flow 2 (移動不定) drift; move; wander 3 (流傳; 傳播) spread 4 (向壞...
  • : Ⅰ動詞1 (計算) count; compute; calculate; number 2 (設想; 打算) plan; plot Ⅱ名詞1 (測量或計算...
  • 溢流 : effluent flow
  1. First, according to the design requirement of hydraulic valve, the particular parameter of the valve is put forward, and the navier - stokes equation of the two - dimension impressible viscid fluid in the hydraulic valve is set up

    本文選擇液壓閥中的閥為具體研究對象。根據閥的性能要求,確定了閥的具體參數,完成了閥的設
  2. On the basis of actural engineering projects, discussion is presented of some problems in the design of storm sewer system, such as the decision of design parameters for rainfall reappearing periods and closure multiples, the determination of water - collecting positions, the connecting methods of intercepting storm - sewage system with intercepting main pipes and he calculation of flow capacity of overflow traps

    摘要結合工程實際對雨水管渠設中的設重現期、截倍數等設參數的選擇、雨水集水點位置的確定、截式合制管渠與截干管的連接方法以及量的算等問題進行了探討。
  3. According to differences of construction process, boundary condition, temperature and stress of two schemes extending 3m deep short seam on upstream face in the middle of rcc overflow section and no short seam are calculated, what " s more, in this paper the equivalent line drawing of stable temperature field and unstable temperature field during construction and operation period and the duration curve drawing of typical points " s temperature and stress are plotted, and the results of peak and minimum on temperature in every month and maximum on tensile stress are attained

    根據施工過程和邊界條件,對壩段中間上游面增設3m深短縫和不設短縫兩個方案進行了溫度和應力算,並繪制出穩定溫度場等值線圖及施工期、運行期非穩定溫度場等值線圖,典型點溫度和應力歷時曲線圖,逐月最高、最低溫度和最大拉應力及相應位置等成果。
  4. In order to calculate quantitatively the process of rainfall - runoff, the css model of zhang cha catchment is developed based on epa ’ s swmm ( storm water management model ) in this paper. and then calculate cso spill water quality 、 spill volume and spill time at different intercepting ratio using the developed swmm, and analyze the effect on them by intercepting ratio

    為了實現上述降雨?徑過程的定量算,本文引入美國環保局的城市暴雨水管理模型( swmm )建立了佛山市張槎排水區的合制排水系統模型,使用該模型算了不同截倍數時污水的水質、水量以及時間,並分析了截倍數對它們的影響。
  5. The system is mainly comprised of a computer, sensors, cable, high pressure oil lines and electromagnetic overflow valve, has both the functions of measuring and control, and is awarded the explosionproof qualification certificate by china classification society

    該系統主要由算機、傳感器、電纜、高壓油管線和電磁閥等組成,既具有監測功能,又具有控制功能,而且取得了中國船級社的防爆合格證書。
  6. In addition, considering the essential characteristics of the fusion - fission hybrid reactor, the preliminary analysis and research of the mhd pressure drop of liquid metal that flow through the fuel packed pebble bed - based blanket are given

    另外,基於聚變中子源驅動的次臨界清潔核能系統,針對聚變?裂變嬗變混合堆的本質特點,對液態金屬球床包層進行初步地探討和研究,進行了球床液態金屬的磁體動力學動的建模分析和算。
  7. Based on the relocating mesh model, according to heat conduction theory, elastic creep theory and finite element theory, simulation program for roller compacted concrete overflow dam is worked out through 3 - d finite element method

    基於本文提出的算模型,根據熱傳導理論、彈性徐變理論及有限元理論,作者編制了碾壓混凝土壩溫度場及溫度應力場的三維有限元模擬算程序。
  8. A parametric analysis of the inviscid effects of leading edge sweep, sidewall compression, width - height ratio, cowl position and inflow mach number on spillage is finished. numerical simulations are completed for a series of inlets at various flight height and velocity. the research indicates that the area of spillage window, which is mainly determined by the position of the cowl, significantly influences the spillage characteristic of the scramjet inlet

    闡明了側板后掠的側壓進氣道設參數對構型影響;對不同側板配置方式的側壓式進氣道進行了數值模擬,通過對比分析,發現由唇口板的位置所決定的窗面積的大小對進氣道特性的影響顯著。
  9. Thus it is very difficult to calculate the spill volume and water quality because they involve many processes such as rainfall, yield runoff of rainfall 、 flow concentration of surface runoff, ground pollutant build up 、 washout, the flow concentration of combined drainage system and cso

    其中,合制排水系統的水量、水質的確定涉及到降雨,地面產、匯,地表污染物的累積、沖刷,污水在管渠中的匯以及等多種因素,採用一般方法很難定量算。
  10. The test platform adopts controlled system for silion controlled governing and electrohydraulic proportional relief valve loading to achieve the microcomputer controlled

    實驗臺採用可控硅直電機控制轉速系統和電液比例閥加載系統來實現被試泵的算機控制。
  11. Furthermore, asymptotic techniques to analyze large hartmann parameter flow and interaction parameter flow are employed and an analytical model has been developed for the calculations of mhd pressure drop of liquid metal flow in a packed pebble bed

    利用漸近線分析法對大hartmann參數進行分析,給出了球床液態金屬的磁體動力學壓力損失的建模分析和算結果。
  12. ( 6 ) 3d integer model of spillway and frusta of brake are established and numerical computation of 3d viscous flow over spillway is completed. the influence of frusta of brake for design parameters such as shape of free surface, pressure on dam, flux coefficient is computed aim at type of frusta of brake and disposal on dam and compute result of different type of frusta and disposal model is compared

    6 )通過建立壩和閘墩的三維整體模型,完成了對三維過壩水場的數值算,針對閘墩的型式及在壩面的布置算了閘墩對水面線形狀、壩面壓力、量系數等設參數的影響,並將不同墩型與布置形式的算結果進行比較。
  13. The flow field and pressure drops in the hydrocyclone were calculated numerically based on the k - e model modified for anisotropy and simple algorithm. the effects of operating parameters such as split ratio and feed flowrate on pressure drop were analyzed. the calculate results was compared with those obtained in experiment

    因此,本文採用各向異性-模型及simple ( semi - implicitmethodforpressure - linkedequations )演算法對水力旋器內場及壓力降進行了數值模擬,分別考察了比、進料量及管幾何尺寸等對壓力降的影響,並把得到的數值算結果與實驗值比較,證明本文的算結果是可以接受的。
  14. In order to study the characteristics of the stepped spillway overflow comprehensively and seek for the measure to increase the energy dissipation of the stepped spillway at large unit discharge, the method of turbulence numerical simulation and model test are used to study the stepped spillway overflow. in view of the curved free water surface, complicated boundary condition and turbulence flow, it very difficult to simulate the stepped spillway overflow

    為了對階梯壩面場特性進行全面的研究,同時探求在大單寬量下提高階梯壩消能率的措施,本文採用紊數值模擬與實驗相結合,數值算為主、實驗為輔的研究方法對階梯壩面場進行了較系統深入的研究。
  15. Chapter four analyzes the static working state of the servo - overflow valve that is the key spare part of setting up four - dimensional pressure. by studying the control law, joint control has been realized between plc and computer

    第四章分析了建立四維壓力的關鍵部件?伺服閥的靜態工況,經過對控制規律研究,實現了可編程式控制制器plc與算機聯合控制。
  16. The results of the three dimensional simulation emphatically show flow characteristics change along the spillway width and furthermore verify that the combination of k - e turbulence model with the vof model and unstructured grid can successfully simulate complex three dimensional turbulent flow on the stepped spillway

    三維算著重體現了場沿洪道寬度方向的變化規律,進一步驗證了vof模型、非結構網格與卜。紊模型相結合能夠成功地模擬三維階梯壩面復雜場。
  17. 11 unless higher flooding is specified, trayed columns shall be designed for flooding up to the bottom tray and for pressure drop across the trays

    除非規定了更高的/沖洗,盤式塔的設應利於/沖洗至底盤和壓力降穿過底盤。
  18. By the turbulence numerical simulation, the optimization calculation of some key factors that influence the stepped spillway overflow, such as the spillway slope, the step size, the transition steps and so on, are carried out

    本文首次應用數值模擬的方法對影響階梯壩面場特性的一些重要因素,例如壩面坡度、階梯尺寸、過渡階梯等,進行了優化算。
  19. ( 2 ) in the original system because of the area between the piston and the piston pole is too small, the system pressure will rise when in the return stroke. and the reliever valve will open. the return velocity will reduce

    ( 2 )原設中,由於活塞和活塞桿的面積差很小,回程上行時,系統壓力會迅速升高造成閥的而使回程速度降低,從而降低了系統的工作效率。
  20. At the same time, study on the relation between them needs calculating quantitatively combined sewer system overflow ( cso ) spill volume 、 time and water quality and study the self - purification of contamination in receiving water

    研究截倍數與水體環境質量之間的關系,則需要定量算合制排水系統的水量、水質以及時間,並在此基礎上研究污水在水體中的凈化過程。
分享友人