溢流量 的英文怎麼說

中文拼音 [liúliáng]
溢流量 英文
peripheral discharge
  • : Ⅰ動詞(充滿而流出來) overflow; spill Ⅱ形容詞(過分) excessive
  • : Ⅰ動1 (液體移動; 流動) flow 2 (移動不定) drift; move; wander 3 (流傳; 傳播) spread 4 (向壞...
  • : 量動1. (度量) measure 2. (估量) estimate; size up
  • 流量 : rate of flow; flow; runoff; discharge; throughput; (flow) rate; quantity (of flow); flux
  1. Liquid flow measurement in open channels. flat - v weirs

    明渠液體的測. v形平面
  2. This paper introduces the surface forming technology for pocket concrete overflow weir, analyzes and compares construction technique for two types of gate and built - in parts, and presents rating methods for concrete samples when they are less than 30 groups

    摘要現介紹了小型混凝土堰堰面成型工藝,分析比較了兩種閘門埋件施工工藝,提出了數不足30組時的混凝土試塊評優的方法。
  3. The typical velocity field and the pressure on the step surface of the stepped spillway are measured using the laser doppler anemometer and the piezometer tube respectively

    採用多普勒激光測速儀和測壓管分別對階梯壩面典型速度場和階梯表面壓力進行詳細測
  4. On the basis of actural engineering projects, discussion is presented of some problems in the design of storm sewer system, such as the decision of design parameters for rainfall reappearing periods and closure multiples, the determination of water - collecting positions, the connecting methods of intercepting storm - sewage system with intercepting main pipes and he calculation of flow capacity of overflow traps

    摘要結合工程實際對雨水管渠設計中的設計重現期、截倍數等設計參數的選擇、雨水集水點位置的確定、截式合制管渠與截干管的連接方法以及溢流量的計算等問題進行了探討。
  5. Taken the bank spillway at yubeishan reservoir as an example, the water loads acted on the spillway, such as static water pressure, dynamic water pressure, shear stress on the surface of the step and so on, are calculated, which can provide evidence to the stability analysis of the dam slope and slope protection

    並以萬縣魚背山水庫岸邊洪道為例,計算了洪道上所受的水荷載及其分佈,為土石壩坡和護面的穩定分析提供了依據。通過計算證實了既使在較大的單寬下,緩坡上的階梯仍有較高的消能率。
  6. Methods of measurement of liquid flow in open channels - weirs and flumes - rectangular broad - crested weirs

    明渠.第4部分:堰和斜槽.第4e節:矩形寬頂堰
  7. Methods of measurement of liquid flow in open channels - weirs and flumes - round nose horizontal broad - crested weirs

    明渠.第4部分:堰和斜槽.第4f節:圓端水平寬頂堰
  8. When the governing valve was series - connected on the return oil - line in the metering - out control system, under the same flow area and the same adjusted pressure of relief valve, with the incremental quantity of step load, the pressure highly - adjusted capacity of the hydraulic cylinder chamber with piston - rod increased, meanwhile, it ' s time of rise, time to peak and the governing time all increased. at the same time, the pressure highly - adjusted capacity of the hydraulic cylinder chamber without piston - rod increased

    當出口節調速系統的回油路上串接調速閥時,隨階躍負載的增加,在相同閥開度、相同閥調節壓力的情況下,液壓缸有桿腔壓力p _ 2 ( t )的超調是增加的,上升時間、峰值時間以及調整時間也是增加的;液壓缸無桿腔壓力p _ 1 ( t )的超調是增加的。
  9. In order to calculate quantitatively the process of rainfall - runoff, the css model of zhang cha catchment is developed based on epa ’ s swmm ( storm water management model ) in this paper. and then calculate cso spill water quality 、 spill volume and spill time at different intercepting ratio using the developed swmm, and analyze the effect on them by intercepting ratio

    為了實現上述降雨?徑過程的定計算,本文引入美國環保局的城市暴雨水管理模型( swmm )建立了佛山市張槎排水區的合制排水系統模型,使用該模型計算了不同截倍數時污水的水質、水以及時間,並分析了截倍數對它們的影響。
  10. Currently sewage in sewage pumping station system is pumped manually. so the station is working in low water level and energy is consumed. this mode ca n ' t predict the inflow ' s changing

    當前污水泵站排放系統主要採用人工值守方式排水,低水位高揚程耗能嚴重,且缺乏預測能力,洪峰來臨時易產生污水出污染。
  11. Three methods of scouring are applied, such as cold pad - batch, pretreatment in overflow machine, and pretreatment in slack bleaching and scouring machine, which are suitable for different batches and printing patterns

    介紹了三種前處理煮練工藝:冷軋堆、機前處理和松式繩狀練漂聯合機前處理,可適用於不同批和印花花型。
  12. The process of effluent flow during loading in self - propelled trailing suction hopper dredgers was simulated by way of physical modeling and was measured and analyzed by using the flow rate and concentration of spoil in the hoppers, particle sizes of sediments at the inlet and outlet of the effluent flow pipe and hopper volume as the major control parameters

    摘要通過物理模型試驗模擬自航耙吸挖泥船裝艙施工過程,以艙內速、艙內濃度、進出口泥沙粒徑、裝艙幾方面為主要控制因素,進行實測、分析,並比較自航耙4種常用裝艙裝置的消能效果。
  13. Hydrometric determinations - flow measurement in open channels using structures - flat - v weirs

    比重測定.構造物的明渠液體. v形平面
  14. The result show that the position of free surface is higher because of frusta of brake, especial obvious in the head of frusta of brake ; flux coefficient and pressure on dam are quite influenced by type of frusta and 3 a type frusta of brake relative to 2 type frusta of brake has bigger flux coefficient and smaller pressure on dam ; obvious influence of ability of discharge flow for different ratio of thickness of frusta and breadth of brake and pressure on dam reduces with increasing ration of thickness of frusta and breadth of brake, while bigger flux coefficient is obtained when tlb = 0. 2

    結果表明,閘墩河海大學博士論文的存在抬高了水面線的位置,其中在閘墩頭部尤其明顯;墩型對系數和壩面壓力影響較大, 3a型閘墩相對於2型閘墩具有更大的系數和更小的壩面壓力:不同的墩厚閘寬比t / b對泄能力也將產生顯著的影響,隨著墩厚閘寬比的增加,壩面壓力降低,而當t / b二0 . 2時壩具有更大的系數。
  15. The effects of operating parameters such as split ratio and feed flowrate on separation efficiency were analyzed

    並考察了油滴直徑、進料比的變化對分離效率的影響。
  16. Momentum integral equation of turbulent boundary layer on ogree section of spillway dam in considering the gravity and centrifugal force

    考慮重力及離心力的壩反弧段紊邊界層動積分方程
  17. Thus it is very difficult to calculate the spill volume and water quality because they involve many processes such as rainfall, yield runoff of rainfall 、 flow concentration of surface runoff, ground pollutant build up 、 washout, the flow concentration of combined drainage system and cso

    其中,合制排水系統的、水質的確定涉及到降雨,地面產、匯,地表污染物的累積、沖刷,污水在管渠中的匯以及等多種因素,採用一般方法很難定計算。
  18. Specification for sight - flow indicators for tank overflow systems

    儲槽裝置用觀測指示器規范
  19. The peculiarity of flow - pressure and the working situation of relief of relief valve is analyzed in this paper, and the reasonable range of the pressure adjusting value of relief valve in different applied condition is studied

    摘要根據閥的壓力特性和工況分析,研究了在不同應用條件下,閥壓力整定值的合理范圍。
  20. Standard guide for selection of weirs and flumes for open - channel flow measurement of water

    用於明渠水堰和斜槽的選擇的標準導則
分享友人