溫水管 的英文怎麼說

中文拼音 [wēnshuǐguǎn]
溫水管 英文
warm water pipe
  • : Ⅰ形容詞(不冷不熱) warm; lukewarm; hot; gentle; mild Ⅱ名詞1 (溫度) temperature 2 (瘟) acute ...
  • : 名詞1 (由兩個氫原子和一個氧原子結合而成的液體) water 2 (河流) river 3 (指江、河、湖、海、洋...
  • : Ⅰ名詞1 (管子) pipe; tube 2 (吹奏的樂器) wind musical instrument 3 (形狀似管的電器件) valve;...
  • 水管 : waterpipe; water carrier; aqueduct; water conduit; water pipe; syphon; siphon (消防) 水管車 hos...
  1. Based on the simulation model theory of temperature and stress fields presented in this article, a large simulating program for high rccd has been developed, which can numerically simulate all kinds of temperature control measures, including water pipe cooling, heat insulating in winter, reducing place temperature of concrete, spraying water brume, and long interval over - watering surfaces overflowing in flood season.

    基於本文提出的度場和徐變應力場模擬模型理論,編制了高碾壓混凝土壩的三維有限元模擬計算程序,在程序中考慮了各種控措施的數值模擬,包括:冷卻、冬季保、降低混凝土的澆築度、夏季混凝土表面噴霧、施工汛期壩頂面過等。
  2. The factors that probably leads to cracks are put forward based on the analysis, which in turn are : the deformation of surrounding rock and the deformation of concrete volume and the pelter of air temperature and thermal insulation temperature rise and the thickness of liner and cooling pipe

    通過分析得出了導致裂縫的幾種可能原因依次為:混凝土的圍巖變形、自生體積變形、氣驟降、絕熱升、襯砌厚度和冷卻等,為今後類似工程提供理論依據。
  3. This article aims at the boiler ' s problems in operation : 1 ) under nominal load, the smoke temperature at the outlet of hearth reaches 1200, far more exceeds 1050 the original designed temperature. this will always result in slag inside boiler and the temperature of overheater ' s pipe superheat, so that boiler cannot take nominal load and all these influence boiler ' s nomal operation heavily, 2 ) this article also studied the reason why the assistant oil becoming necessary when coal changes. during the nomal operation, many factors ( makeup of combustor and its disposal, smirch and encrust of water wall, excessive air coefficient, temperature of primary air, coal type and density of coal dust ) can deviate the designed working conditions, then affect the boiler ' s nomal operation

    本文針對該鍋爐在實際運行中存在的問題:在額定負荷下,爐膛出口超、低段過熱器前煙高達936 ,遠遠超過815的設計值;噴燃器四周冷壁結焦嚴重,過熱器度超標,無法帶上額定負荷;甚至有時因燃煤質量的變化,必須投油助燃的嚴重情況進行了分析研究。在實際生產過程中,燃燒器的結構、布置,冷壁的粘污、結垢,過剩空氣系數、一次風、煤種及其濃度變化等許多因素都會偏離鍋爐的設計工況,從而影響爐內的傳熱和燃燒,造成爐膛出口超冷壁結渣等問題。
  4. Water heaters located in unconditioned spaces ( i. e., attics, basements, etc. ) may require the water piping and drain piping to be insulated to protect against freezing

    如果熱器安裝在不具備條件的地方(如:閣樓,地下室,等等) ,可能要求和排加裝保層以防止被凍結。
  5. In the program, the effect of lamination placement, construction interval, elastic modulus change, thermal insulation change, surrounding temperature change, concrete creep and autogenous volume change on thermal stress are considered. and such temperature control measurement as water pipe cooling, heat preservation of the dam surface, the pouring temperature control, the overflow across the dam top during flood season can also be simulated by numerical method

    該程序在編制過程中考慮了混凝土分層澆築、施工間歇、彈模變化、絕熱升過程、環境度的變化、混凝土徐變、自生體積變形等因素對壩體度場及度應力場的影響,同時也考慮了冷卻、壩體表面保、控制澆築度、施工汛期壩頂面過等各種控措施的數值模擬。
  6. The product adopts the infalling through system on the structure of boiler pipe line, if equips safely valve an will stop working automatically in case hyperthermal, super - pressure and low water lever

    安全採用貫流式爐膽結構,並配備安全閥,度過熱,位過低,壓力過高等四重保護,絕對安全可靠。
  7. Results show that the tube - burst is mainly due to the result of tube ' s long term overheating, while the main causes resultsing in overtemperature of the platen superheater are as follows ; ( 1 ) burn - out of superheater ' s pipe - grippers ; ( 2 ) some tube - sections are out of the row ; ( 3 ) unsuitable mode for adjusting the desuperheating water

    結果表明:爆主要是由於子長期過熱所致,而屏式過熱器卡燒損、個別段出列、減調節方式不當是引起屏式過熱器超的主要原因。
  8. Gangsu composite of a gb hot galvanized steel pipes for the matrix, its appearance " never rusting " lining the living standard of polythelene ( pe, cold water ) and apply regardless jubingxi ( ppr hot water ), gangsu picked up by agents of imports picked up, and use cold water temperature reached 60 degrees, the hot water pipes to 95 degrees

    鋼塑復合採用國標熱鍍鋅鋼為基體,其外表「永不生銹」內襯符合生活飲用標準的聚乙稀( pe 、冷)和無規共聚聚丙稀( ppr熱) ,鋼塑拈接採用進口拈接劑,冷使用度達到60 ,熱可達95 。
  9. Combined with practical data of shannxi lin hekou hydropower plant, the temperature filed of m and n schemes during construction and operation are simulated and analyzed. the isoline map of stable temperature field of the arch crest girder section and the vertical section in the center of arch dam, the isoline map of unstable temperature field of the arch crest girder section and the vertical section in the center of arch darn during construction and operation and the maximal and minimal temperature value during construction and operation are provided. the distribution law of temperature in the dam and the form reason of high - temperature zone are analyzed and the effect and feasibility of cooling and the zone of cooling are discussed

    結合陜西藺河口電站工程實際資料,對m方案和n方案度場進行了施工期和運行期全過程模擬計算分析,給出了拱冠梁剖面和壩體中心縱剖面準穩定度場等值線圖以及施工期、運行期拱冠梁剖面和壩體中心縱剖面非穩定度場等值線圖,提供了施工期逐月和運行期每年最高、最低度等成果,分析了壩體度分佈規律以及高區形成的原因,並探討了預埋冷卻的效果和可行性以及預埋冷卻的區域。
  10. The sub - model for design of population density was developed according to the principle of determining boll number from target yield, fruit node from boll number, fruit branch from fruit node and population density from fruit branch by integrating the effects of sowing date, cutout date, effective temperature accumulation above 12, variety type, and fertilizer and water management levels. sowing rate was then decided by integrating the effects of different soil water and salt contents, ph, temperature and sowing style on seedling emergence rate with relative weight method

    基於「以產定鈴、以鈴定節、以節定枝、以枝定苗」的原理,同時考慮播種日期、打頂日期、 12的有效積、品種株型特性、肥平差異等因素來確定適宜的種植密度;在此基礎上,應用相對權重法計算土壤含量、含鹽量以及整地質量和播種方式等多個生態環境因子對出苗率的綜合影響,進而確定播種量。
  11. Our main products include central material supply system, series drier, automatic charging machine, single double screw extruder, series heating and cooling blending machine, crusher, cold water machine, mould temperature controller, pipe, bar section, board, pp - r pipe, pe fuel pipe, plastic dual tubing extrusion production line and granulation completed production line equipment, at same time, we also carry on various plastic machine and refrigeration engineering. the products are sold well in every province and city of the whole country and also exported to about 30 countries and areas with strong technical force, advanced equipment, scientific management system and perfect after - sales service

    公司主要產品有集中供料系統系列乾燥機自動加料機單雙螺桿擠出機粉料高速混合機粒料混合機螺旋上料機牽引機切割機離心脫機化纖團粒機全自動擴口機全自動計量混合裝置破碎機磨粉機冷機模材型材板材pvc材pp - r材pe供燃氣材中空壁纏繞材硅芯材生產線,雙擠出電工穿線材造粒等全套生產線設備。
  12. Rubber seals - joint rings for pipelines for hot water supply, drainage and sewerage pipelines up to 110 c - specifications for the material

    橡膠密封件.度為110及以下的熱供給排和污道用連接環.材料規范
  13. Analysis of applied technology of high temperature water directly embedded heating supply pipeline

    直埋供熱道應用技術分析
  14. Two coloured indices are fitted up inside the capillaries on either side of a u - tube. when the temperature falls, the index will keep still, therby indicating maximum and minimum temperatures

    左右毛細孔內各裝有1枚指示針。當度上升時,指示針受銀柱推動而上升;度下降時,指示針不受影響,可停留在原點,從而指示出最高或最低度。
  15. 3 the design theories of cooling pipe of play down internal temperature of mass concrete about diameter, length, arrange method, rate of flow, current velocity, reduce heat time, temperature disparity to in and out, reduce heating result etc. 4 the theory of influence about concrete internal temperature and concrete crack because of transform of mixture ratio and pulverized fuel ash sophisticate quantity

    西安建築科技大學博士生論文一;一;一一『一一一3降低大體積混凝土內部度常用的冷卻徑、長度、布置方法、流量、流速、降時間、進出口的差、降效果等的設計計算理論。 4配合比及摻加料對混凝土內部度和混凝土開裂的影響理論。
  16. The iterative algorithm of the 3d unstable temperature field which takes the effect of water pipe cooling into account has been studied, and some skills about determining the nodes and elements of water pipes are also given

    研究了考慮冷卻效果的不穩定度場的迭代演算法,給出了確定結點、單元信息的沿程搜索技巧。
  17. Based on several actual cases, the temperature control measures for roller compacted concrete ( rcc ) gravity dam and arch dam such as structural jointing for construction ; lowering of concrete placing temperature ; water pipe cooling ; surface insulation ; inclined - layer placing etc., the measures to improve the material properties i. e. the application of micro - expanding concrete ; enhancement of material crack - resistance property and the requirement for the simulative analysis on both the temperature field and stress field as well as some problems concerned are summarized herein on the basis of the analysis on the material properties ; construction characteristics and the changing characteristics of the thermal stress of roller compacted concrete

    摘要從碾壓混凝土的材料特性、施工特點、度場度應力的變化特點入手,結合幾個工程總結了碾壓混凝土重力壩、拱壩的分縫方式,降低澆築度、冷卻、表面保、施斜層碾壓等控措施,採用微膨脹混凝土、提高材料抗裂性能等改善材料性能措施及碾壓混凝土度場、應力場模擬分析的要求和應注意的問題。
  18. By using the finite element numerical simulating method, and studies based on the practical project xiluodu arch dam, this paper studies systematically the type of joints, placing temperature, protection methods on the surface of concrete dams, the first stage artificial cooling method including different cooling water temperatures, cooling lasting days and cooling pipes arrangement

    本文利用數值模擬計算方法,以溪洛渡實際工程為依託,對大體積混凝土施工中常採用的控措施對混凝土度變化的影響規律進行了全面系統的研究,包括分縫分塊方式、澆築度、混凝土間歇時間、一期冷卻方式(包括不同進度、不同布置、不同通時間)等。
  19. Hot water supply temperatures, hot water storage, hot water supply systems, hot water equipment, water heaters, pipes, etc

    供應度、熱儲存、熱供應系統、熱設施、熱器、熱
  20. In accordance with the water tunnel that liner have cooling pipe, thermal insulation temperature rise model adopt difference expression during its through or not water phase, and optimization back analysis of parameters is carried out

    針對本工程引洞襯砌內布置有冷卻,對絕熱升模型在通前後採用了不同的表達式,並分別對其進行了優化反演分析。
分享友人