滑坡泉 的英文怎麼說
中文拼音 [gǔpōquán]
滑坡泉
英文
landslide spring- 滑 : Ⅰ形容詞1 (光滑; 滑溜) slippery; smooth 2 (油滑; 狡詐) cunning; crafty; slippery Ⅱ動詞(貼著物...
- 坡 : Ⅰ名詞(地面傾斜的地方) slope Ⅱ形容詞(傾斜) sloping; slanting
- 泉 : 名詞1 (泉水) spring 2 (泉眼)the mouth of a spring; spring3 (錢幣的古稱) an ancient term for...
- 滑坡 : 1 (地表斜坡上大量土石整體下滑現象) hill creep; landslide; landslip;2 (下滑; 下降) go steadily...
-
The new applications of survey are described in the fields of indicating underground advance, seeking out lossed ore deposit, discovering neotype deposit for detecting the gold deposit ; determining productive aquifer for looking for groundwater ; discovering fracturation zone controlling crop out of hot spring for developing the hot spring, and locating the position of ancient rock slide for prospecting the earth slide
摘要綜述了應用輕便測量技術在地礦及地下水尋找等方面的一些新應用,例如:在金礦勘探中指導坑道掘進,找到了被遺漏的礦體,發現了新的礦化類型;在地下水尋找中,確定了富水層位;在溫泉開發中,探明了控制溫泉出露的斷裂帶;在滑坡研究中,確定了古滑坡的具體位置。Stability analysis and hazard evaluation of the guishan landslide of baoquan power station by pumping water in henan province
河南省寶泉抽水蓄能電站龜山滑坡體穩定性分析及危險性評估Guishan sliding mass is located just above the intake ( outlet ) of the lower reservoir of the proposed baoquan pumped storage reservoir, being 550 - 800m long from east to west, 260 - 350m wide from south to north, 110m thick in average and up to 210m thick, with a total volume of 21 million cubic meter
龜山滑坡體位於寶泉抽水蓄能電站引水發電系統下庫進出水口的上方,滑坡體長550 800m ,寬260 350m ,最大厚度210m ,平均110m ,總方量2100 10 ~ 4m ~ 3 ,形成於距今14 21萬年,其穩定性如何直接影響下庫及整個電站的安全。The numerical simulation for the earth slide in baoquan processing
寶泉滑坡工程處理的數值模擬分享友人