滲水管 的英文怎麼說

中文拼音 [shènshuǐguǎn]
滲水管 英文
infiltration pipe
  • : 動詞(液體慢慢地透過或漏出) ooze; seep
  • : 名詞1 (由兩個氫原子和一個氧原子結合而成的液體) water 2 (河流) river 3 (指江、河、湖、海、洋...
  • : Ⅰ名詞1 (管子) pipe; tube 2 (吹奏的樂器) wind musical instrument 3 (形狀似管的電器件) valve;...
  • 水管 : waterpipe; water carrier; aqueduct; water conduit; water pipe; syphon; siphon (消防) 水管車 hos...
  1. Crossing canalization for improving capacity of roads

    上海市排入量調查與修復決策
  2. Abstract : considering the stochastic characteristic of main hydrogeologic parameters in yuanbaoshan open coal pit, a groundwater stochastic management model for optimal drainage borehole design is established. the result of the modeling shows the effect of stochastic characteristics of hydrogeologic parameters on the result of management modeling. it was found that the higher the parameters uncertainty and the management reliability level, the worse the management result

    文摘:從影響元寶山露天礦地下疏乾的主要文地質參數隨機性特徵分析入手,建立並求解了元寶山露天礦疏干工程優化設計的隨機地下理模型,揭示了文地質參數隨機性對理模型結果的影響,認為參數的隨機性越大,理結果越壞;置信平越高,理結果越壞,且透系數和邊界條件對理結果影響最大。
  3. Standard practice for infiltration and exfiltration acceptance testing of installed precast concrete pipe sewer lines

    安裝的預制混凝土污道的表面入和出的驗收檢驗的標準實施規程
  4. Standard practice for infiltration and exfiltration acceptance testing of installed precast concrete pipe sewer lines metric

    安裝的預制混凝土污道的表面入和出的驗收檢驗的標準實施規程
  5. ( 4 ) the maximum water quantity becomes greater, the better is the filtering bed permeability, the higher the river hydraulic conductance, the higher the river level, the larger the water - collecting area and the bigger the distance between collecting pipes. the water quantity varies directly with drawdown

    ( 4 )濾床的透性能越好,河床力傳導系數越高,河位越高,取面積越大,取之間的間距越大,則最大取量越大;位降深與取量成正比關系。
  6. Construction ministry " housing project quality guarantees method " made lowest guarantee to housing project the regulation of deadline : among them 1, foundation foundation project and project of main body construction, to design the reasonable use fixed number of year of this project that the file sets ; 2, the waterproof project, toilet that has waterproof demand, room mixes the building outside of metope prevent leakage, for 5 years ; 3, heat addition and supply cold system, for 2 heating period, offer cold period ; 4, electric cop, to catchment conduit, equipment installation is 2 years ; 5, decorate a project to be 2 years

    建設部《房屋建築工程質量保修辦法》對房屋建築工程作了最低保修期限的規定:其中1 、地基基礎工程和主體結構工程,為設計文件規定的該工程的合理使用年限; 2 、房屋防工程、有防要求的衛生間、房間和外墻面的防漏,為5年; 3 、供熱與供冷系統,為2個採暖期、供冷期; 4 、電氣線、給排道、設備安裝為2年; 5 、裝修工程為2年。
  7. Drain pipes and percolation pipes - general requirements

    道和道.一般要求
  8. Abstract : this paper introduces the scheme, deep cut of foundation pit to bury pipe, which is adopted for wenjiayan seawall in qiantang rever. compared with the scheme of withstanding pipe, this scheme has the advantage of saving investment, simple construction and time + - saving. it is convenient to check the anti - seep installation between water pipe and seawall

    文摘:本文通過錢塘江聞家堰海塘深基坑開挖埋,替代原設計頂方案,具有工程投資省、施工簡單、工期短,且便於檢查取與海塘之間防措施
  9. Reliability assessment of xi - luo - du underground water - power plant : the results have been used by the cheng - du surveying, design and research institute for the preliminary design ; ( 2 ) the stress and strain analysis for the xiao - guan - zi sluice and its foundation : the report has been applied for the reinforcement of the foundation ; ( 3 ) the thermal control procedure for the no. 7 - 14 power plant dam segments of the three gorge project : the research report provides the effective and efficient methods for the controlling of the temperature field in the mass concrete structure ; ( 4 ) the software system development for the long - term monitoring for dikes : the software can automatically give the results of the seepage field and the probability of soil piping of dikes and underground ; ( 5 ) reliability assessment of xiang - jia - ba underground water - power plant : the results have been used by the zhong - nan surveying, design and research institute for the preliminary design ; ( 6 ) fatigue reliability estimation of shipping berthing pillar : the results give the optimized design scheme and prediction of the structural age ; ( 7 ) 3 - d static and dynamic stochastic finite element analysis for the strength, stability and thermal control problem for xi - luo - du project

    溪洛渡電站超大型地下洞室群圍巖穩定的安全可靠性分析:被成都勘測設計研究院應用於比選報告及可行性論證中; ( 2 )小關子電站攔河閘壩及地基的應力應變分析:被成都勘測設計研究院應用於地基加固處理方案; ( 3 )三峽廠房7 # - 14 #壩段溫控並縫措施研究:為廠房壩段並縫方案的可行性提供了依據; ( 4 )堤防工程體系的長期監控預報預警決策系統開發:為監控、預測預報堤防涌破壞提供分析軟體; ( 5 )向家壩地下洞室群圍巖穩定的安全可靠性分析:被中南勘測設計研究院應用於初步設計方案中; ( 6 )靠船墩的疲勞可靠度研究:為廣東航運規劃設計院的靠船墩優化設計和加固提供依據; ( 7 )溪洛渡高拱壩壩體壩基(壩肩)強度和穩定的三維靜動力隨機有限元分析及可靠度計算:為溪洛渡重大工程壩體的靜動力安全穩定性及溫控方案提供依據。
  10. The simulative calculation results show that all the three measures mentioned herein have larger effects on the infiltration, runoff, flood peak flow and overland flow and can greatly alleviate the pressure of the draining pipeline, clip the flood peak and increase the infiltration as well, if they are taken as the additional important measures of urban drainage for flood control

    模擬計算的結果顯示,以上3種方式對入、徑流、洪峰流量、坡面流等均有較大影響,作為城市防洪排的重要輔助措施,可以極大地緩解排道壓力,同時削減洪峰、增加入
  11. Characteristics of water flow of node permeation irrigation pipeline dilled

    機械打孔節點的出特性試驗
  12. Research and application of pipe - maker of cement mortar pipe for seep irrigation underground

    地下泥砂漿機的研究及應用
  13. In the simulation of close water test, varied profiles of velocity of flow are obtained at different leakage location along the detected pipe, the variety values of the water level in the check well are acquired with time, consequently the location of the leakage can be judged

    在閉試驗時,通過模擬沿道長度方向上不同點的流速的變化,以及得出窨井出口處的位隨時間的變化值,來判斷段中最有可能出現漏點的位置。
  14. In view of the above problems, zippered plastic pipes which have obtained patent was adopted as pi pipe in the providing theoretical basis and data support for the application of zippered pi pipes to the vegetable cultivation in shelves

    針對以上問題,本試驗採用已獲得國家專利的拉鏈式塑料作為,進行棚室蔬菜栽培灌灌試驗,以期為拉鏈式在棚室蔬菜生產中提供理論依據和數據支持。
  15. This thesis aims at promoting the innovation on irrigation methods and the development of irrigation techniques in vegetable cultivation, and also provides for percolation irrigation by way of experimental study on the seepage flow both in air and soil with zippered plastic pipes and on the application of percolation with zippered plastic pipes to vegetable tomato cultivation in shelves

    本論文通過拉鏈式塑料大氣、土壤中的流試驗研究,以及在大棚蔬菜(番茄)栽培應用拉鏈式塑料灌的試驗研究,希望為保護地蔬菜栽培灌方法的革新和灌灌技術的發展、拉鏈式塑料作為的可行性和優越性提供理論依據。
  16. After the observation and analysis on the uniformity coefficient of irrigation and the distribution of soil moisture under each different treatment, a result was got that 35cnrs embedded depth is comparatively appropriate for vegetable cultivation for the high uniformity coefficient and the vegetable cultivation for the high uniformity coefficient and the concentrated distribution of irrigation water in the main root zone

    通過對各處理灌均勻度和土壤分分佈的觀測、分析,認為埋深35cm時對蔬菜栽培是比較合適的。此時灌均勻度高,灌溉大部分分佈在蔬菜主要根系區。
  17. It is one of the best water - saving irrigation methods that can save water in the highest degree for such advantages as saving water, saving energy, increasing production, raising air temperature and ground temperature inside the shelf, lowering air humidity inside the shelf, decreasing plight and reducing the use of pesticide and chemical fertilizer, etc. but percolation irrigation is far from a ripe irrigation method for the problems existing in the development of pipes for pi and the two difficult problems which hamper the development of pi ( one is the low uniformity degree irrigation, the other is the blockage in percolation irrigation pipes )

    它是迄今為止最節的一種灌方法,具有省、節能、增產、提高棚室空氣溫度和地溫、降低棚室空氣濕度、減少病蟲害、少施農藥和化肥等優點。但灌還不是一種成熟的灌方法,灌的發展,首先取決于的研製;其次是阻礙灌發展的兩大難題:灌的灌均勻度和的堵塞兩大難題的解決與控制。
  18. Standard test method for water infiltration resistance of plastic underground conduit joints which use flexible elastomeric seals

    使用撓性彈性密封材料的地下塑料接頭耐透性測試方法
  19. Concrete pipes and ancillary concrete products - specification for unreinforced and reinforced concrete manholes and soakaways complementary to bs en 1917 : 2002

    預制混凝土配件和輔助製品.未加筋和加筋混凝土人孔井及坑規范對bs1917 : 2002規范的補充
  20. Overflow and seepage from septic tanks and soakaways in unsewered villages, though not such a major problem on lantau as in other parts of hong kong, still contributed to river water pollution

    在大嶼山有些無污道的鄉村存在化糞池及滲水管溢流和漏的問題,雖然污染程度不及香港其他地區嚴重,但也會影響河溪質。
分享友人