滲水計 的英文怎麼說
中文拼音 [shènshuǐjì]
滲水計
英文
infiltrometer-
In addition, this paper carry out successfully the support design practice in the preceding excavation of 4km long exploratory tunnel. according to the thesis research results, the following conclusion can be drawn. if the grouting rock can possess sound anti - seepage capability and the liner structure can hold higher hydraulic permeability relatively, and if the adjoining rock can be made as primary load - bearing structure by construction measure, the stability of country rock and the safety of liner structure will be guaranteed
計算結果表明,如果能使錦屏工程引水隧洞灌漿圈圍巖具有較好的防滲性能,將高外水壓力控制在灌漿圈以外,再配合透水性相對較好的支護結構以及排水措施,使灌漿圈圍巖成為主要承載結構,並使襯砌結構和灌漿圈共同承載,是可以保證圍巖的穩定和支護結構安全的。This thesis tries to solve the problems in the design and construction of jinping cascade 2 hydropower station. a typical section is selected to analysis seepage, seepage control and fem numerical simulation. the influence of different plans of excavation and support on seepage field of subsurface water and stability of adjoining rock are studied. the homologous support pattern is suggested according to the research results
本文就錦屏二級水電站(一期)深埋長隧洞的設計和施工中面臨的一些問題,選取隧洞的一個典型斷面進行滲流、滲控分析和開挖及支護的有限元數值模擬,從而就深埋隧洞不同的開挖及支護方式對地下水滲流場及圍巖穩定性的影響和所應採取的支護措施等方面進行了探索、研究。This paper analyzes the groundwater discharging course using fluidics theory and combining quay structure construction ; sets up the method of fast drainage by the dint of pipeline and blind ditch of fragment stone ; and gives the computational mathematical model for quay drainage and calculation formula for drainage process according to the principle of conservation of mass and underground percolation, which have been applied for quay ' s stability design and calculation
應用流體力學理論結合碼頭結構建設,分析了地下水排泄過程,藉助管道和碎塊石盲溝建立了港口碼頭快速排水與擋墻基床排水的方法;運用質量守恆定律和地下水滲流原理,建立了港口碼頭排水計算數學模型和排水過程計算公式,並用在了碼頭的穩定設計計算中。Soil quality - calculation of the rate of exfiltration of water from the soil
土質.土壤滲水率的計算The dynamic change of nh4 +, no3 - and tn, under the situation which urea was applied in the high fertility paddy - field in yuhang of hangzhou city with a lysimeter which was designed and made by ourselves, was studied and analyzed in order to find the rules of the change in the water - body of surface and the leakage rule of nitrogen, to reduce the effect of nitrogen loss on the water pollution
藉助自行設計製作的稻田滲漏計,在杭州餘杭對高肥力稻田不同施用尿素氮肥情況下,稻田地表水和滲漏水中銨態氮、硝態氮和總氮(簡稱三氮)的動態變化規律進行了研究分析,以利於發現氮素在地表水體變化和淋失規律,盡量減少氮素淋失對地下水體所造成的影響。Standard test methods for measurement of hydraulic conductivity of saturated porous materials using a flexible wall permeameter
使用撓性壁滲透計測量飽和滲透性材料水滲導性的標準試驗方法According to the results of the satiable modle test and trdimensional seepage computation, the structure arrangement of the cushion bottom could be asserted. to recheck the factors of safety against overturning and float flotation of cushion bottom, the stability computation methods of bottom of the literature, xiao wan hydraulic power station and ertan hydraulic power station were refereed
根據穩定模型試驗及三維滲流計算成果,確定水墊塘底板的結構布置,參考國內小灣、二灘及參考文獻建議的底板穩定計算方法,復核水墊塘底板的抗傾、抗浮穩定。The calculation of the non - steady seepage of earth - rock dams as water level lowers
水位降落時土石壩不穩定滲流計算The government is making plans to upgrade the sewerage network and the treatment works in silver mine bay. in addition, the epd has been continuing its role of monitoring and controlling the effectiveness of septic tanks and soakaway pits, making sure that residents know their responsibilities when it comes to maintaining efficient working sewage systems and repairing leakages
政府現已手計劃提升銀礦灣的污水收集網路及污水處理設施,環保署則一直緊密監控化糞池和滲水井的運作情況,並促使居民履行自身的責任,維持污水處理系統有效地運作,防止泳灘污染。( 2 ) when tunnel water is blocked up fully behind the lining, water pressure on the lining will reach maximum at last so long as surrounding rock near the lining is infiltrative no mattter how much the permeability coefficient of surrounding rock is
( 2 )隧道採用完全不排水措施時,只要襯砌附近的圍巖滲水,襯砌背後與含水圍巖有水力聯系,不論滲透系數多大,襯砌背後最終水壓會達到靜水壓,計算時水壓不宜折減。According to the documentation collected from domestic and abroad wang wei dong who works in huadong architect and structure institute utilizes the similar work property between the underground continuous wall and pile subjected the vertical loads, and introduces poulos method of elasticity and plastic which applies to pile foundation into the calculation for subsidence of underground continuous wall. pujialiu and yu yuzhou from water and electronic engineering of qinghua university, according to the result of three axes, define the concrete parameter utilize the model of non - linear e - b combined with the design cross section of dam in xiaolangdi, yellow river accept the total stress programme of thepd dam, and we analyze the stress and displacement of plastic concrete diaphragm wall by finite element method in comparison with the result of common concrete one. at same time, we consider the effect of the character of plastic concrete diaphragm wall which is composed of different gradients and adopting the level of stress and pulling stress infers whether the plastic concrete diaphragm wall is safe or not
地下連續墻是一種歷史較短的施工方法,目前,砼防滲墻的設計還是以傳統的設計方法為主,根據查找國內外文獻資料,華東建築設計院王衛東利用地下連續墻與樁在豎向荷載作用下的工作性能有相似性,將適用於樁基的poulos彈性理論引入對地下連續墻的沉降計算中;清華大學水利水電工程系濮家騮、于玉貞根據三軸試驗結果確定混凝土的參數,利用非線性e - b模型,結合黃河小浪底土石壩設計剖面,採用thepd土石壩總應力程序,對深覆蓋層塑性混凝土防滲墻的應力、位移進行有限元分析,並與普通混凝土防滲墻計算結果加以對比,同時分析了不同配比塑性混凝土特性的影響,並採用應力水平和拉應力數值來判斷塑性混凝土防滲墻的安全程度。The choice dam type is especial importance, during the designed research of the rock - fill dam, particular under the rock - fill dam with very deeply cover layer, the stress and strain of the middle wall and cutting interpenetration wall of the dam foundation is mostly sensitive, whether the. design of dam is scientific and reasonable, it is very important for cutting interpenetration and stability of the dam, the article offer the reference for the design of cutting interpenetration in the foundation with deep cover with earth the water conservancy in xiaban zone, based on the study and analysis the design of cutting seep in the foundation with deep cover with earth, cutting interpenetration concrete wall and the joining model of cutting interpenetration material in body of dam and the applying effect in the practical worko based on the foundation which absorbed and summarize the achievement of design and research in the inter and outer country, for the project of the clay vertical middle wall and vertical cutting interpenetration, the asphalt concrete vertical middle wall and vertical cutting interpenetration the clay inclined middle wall and the lever carpet layer cutting interpenetration, respectively in terms of the different stage of complete period sluice period and working condition, adopting nonlinear calculate and analysis with the finite element method ; carrying the analysis and study with the 3d finite element method as to the different joining model of the left bank high slope cutting interpenetration body and the foundation concert cutting interpenetration wall ; carrying the analysis and study with the 3d finite element method as to the effect of the wall stress and strain because of the different elasticity modulus of the concert cutting interpenetration wall through the analysis and study with the different project. have comparatively all - around comprehended the various model dam, particular the distribute rule of stress and strain of the cutting interpenetration system, provide for the important evidence of the plastic area size the join model of the foundation cutting interpenetrate wall and dam body cutting interpenetrate system the choice of the dam model and the design of the structure of the dam body, the result of research and advice have very importance value in design and building for the similarity project
工程設計中,壩型的選取顯得尤為重要,特別對于壩基有深厚覆蓋層的堆石壩,心墻和壩基防滲墻的應力和變形是壩體、壩基最敏感的部位,設計方案是否安全、科學和合理,對大壩防滲和穩定起到至觀重要的作用。本文研究分析了國內外深厚覆蓋層基礎防滲設計、壩基混凝土防滲墻與壩體防滲體銜接形式及工程實際應用效果,為下坂地水利樞紐工程深厚覆蓋層基礎防滲設計的方案選擇提供了參考;在吸收和歸納了國內外堆石壩的設計研究成果的基礎上,對粘土心墻和壩基垂直防滲方案、瀝青混凝土心墻和壩基垂直防滲方案以及粘土斜心墻和壩基水平鋪蓋防滲方案,分別按竣工期和蓄水運行期的不同工作情況進行了有限元非線性計算分析;對左岸高陡邊坡的大壩防滲體與基礎混凝土防滲墻的不同結合型式進行了三維有限元靜力計算分析和研究;對混凝土防滲墻不同彈性模量對墻體應力和變位的影響進行了三維有限元靜力計算分析和研究。通過對不同方案的計算分析和研究,比較全面的了解了各方案壩體,尤其是防滲體的應力和變形分佈規律,為壩型選擇、壩體結構設計、基礎防滲墻與壩體防滲體的結合型式以及塑性區大小的確定提供了重要依據。Analysis of dam foundation infiltration in pushihe pumped - storage power station
蒲石河抽水蓄能電站壩基滲漏計算分析Based on the current research studies and needs in engineering, presented and discussed the following four fundamental problems of unsaturated seepage were : numerical modeling theories, modeling of rainfall infiltration, initial water content and hydraulic conductivity and its effect on the numerical simulation
摘要立足於非飽和滲流問題的研究現狀和應用需求,對4個常見的非飽和滲流基本問題進行了論述:非飽和滲流及其數值模擬理論;非飽和降雨入滲及其模擬中的問題;初始水分量及其考慮;土的非飽和滲透特性以及對滲流計算結果的影響。Addresses and enquiry telephone numbers of bd fehd joint offices water seepage pilot scheme
屋宇署食環署聯合辦事處滲水試驗計劃聯絡地址及查詢電話According to the structure layout of futang power station design, geological parameters and calculation results of seepage, the stability and stress of gate chamber and retaining dam are calculated, the security index and stress of anti - slide can can meet the requirement of criterion
根據福堂電站工程設計的結構布置情況、地質參數及滲流計算成果,對閘室和擋水壩穩定、應力進行了計算,其抗滑穩定安全系數及應力標準均滿足規范的要求。According to the seepage equation of the groundwater and using the finite element method, this thesis establishes the mathematics model for two and three dimensional seepage
採用有限元理論,以地下水滲流方程為基礎,針對基坑降水建立了地下水的二維和三維滲流數學模型,完善了深基坑降水滲流計算方法。The technique of splitting grouting is a method for handling the earth dam " s stability with deformation and permeation. it is developed quickly in several decades. the author, regarding left subsidiary dam of shenzhen reservoir as an example, uses the limited element method to proceed the dam ' s seepage calculation, combines the contrast analysis with prototype data and predicted data, then compares the dam ' s seepage behavior " s changes before splitting grouting with that after splitting grouting, has some basic conclusions
土壩壩體劈裂灌漿技術是近幾十年來發展迅速的一種處理土壩壩體變形穩定和滲透穩定問題的方法,本文以深圳水庫左副壩為具體實例,利用有限單元法進行了壩體滲流計算,並與原型觀測資料進行對比分析,然後比較了劈裂灌漿前後壩體滲流狀況的改變,並對壩坡穩定進行分析,得出了一些基本結論,對利用有限單元法求解劈裂灌漿前後壩體的滲流問題提出了一些建議。3. 7 building on the successful experience of the pilot scheme, the bd and fehd will extend the joint office model to other districts by launching a three - year programme starting from late 2005. it is hoped that this model would be able to respond to complaints on water seepage more positively in future
3 . 7建基於試驗計劃的成功,屋宇署和食環署將由2005年年底起,展開為期3年的計劃,把聯合辦事處的模式推展至其他地區,希望日後可更有效地處理有關滲水的投訴。Whether the water leakage is in any way related to the thermal insulation design of the rooftops of the housing blocks concerned ; if not, what the causes of leakage are
出現滲水現象是否與該等公屋大廈天臺隔熱設計有關若否,原因為何分享友人