滿閘 的英文怎麼說

中文拼音 [mǎnzhá]
滿閘 英文
full chamber
  • 滿 : Ⅰ形容詞1 (全部充實; 達到容量的極點) full; filled; packed 2 (滿足) satisfied; contented; conte...
  • : anchor gate
  1. To provide necessary data for design bypass pipe, an enlargement to bi liu river reservoir, the following problems have been studied by hydraulic model and theoretical analysis : the energy losses in water head of the bypass pipe system and of the flow - control valve and their scale effects, measurement and calculation of the discharge of the bypass pipe system during the bypass pipe system operation with and without the new water power station, the hydraulic characteristics of the water tunnel and draw - off pipe, the flow rate of the aqueduct bridge and the draw - off pipe and the water elevation of the flow in the aqueduct bridge during the old water power station operation with and without the new water power station

    大連市碧流河水庫供水工程取水頭部由引水渡槽、節制、進水、泄水等建築物組成。由於本工程場地條件限制,增設旁通管后布置非常緊湊,管道急轉角度大且轉彎距離較小,對于管內水流流態是否滿足要求,需要經過模型試驗進行論證,以確保工程的可靠性。旁通管具有上水與泄水要求,對其過流能力也要經試驗確定,為碧流河水庫增建旁通管設計提供依據。
  2. So according to the technology regulation of reclamation engineering, hydraulic calculation must be carried out in the design of final closure. this paper firstly introduces the progression and present situation of reclamation engineering, emphasizing on the features of present reclamation and on the experiences and theories of home and abroad ; using fortran perfects the hydraulic calculation program of the closure and makes the program to meet different conditions ( such as considering flood, the variation of time interval, multi - entrance, multi - reservoir capacity ), and after comparing and analyzing a great deal of schemes, the reasonable computation scheme was brought up ; the interface of the program was carried out by the programming language vb to make the process of calculation become easier and more distinct, so the result can be analyzed and handled more directly ; vb is used in the later management of the result to plot the graphic chart of the isoline of the maximum of hydraulic element ( the velocity of flow, the drop height and the rate of flow ) automatically ; finally it was applied in the reclamation project of dongbidao of fuqing

    本文首先介紹圍海工程的發展進程與國內外圍海的開發現狀,重點介紹了我國目前圍海工程的特點及在圍海工程實踐中積累的經驗和理論;利用fortran語言完善堵口工程龍口水力計算程序,使程序可以滿足圍海工程復雜工況下(如考慮內港洪水、計算時段的變化、多口門、多庫容、多水)的龍口水力計算,並進行大量方案的比較和分析,提出合理計算方案;利用面向對象的可視化編程語言vb進行界面開發,使計算過程有良好的人機界面,更直觀地對計算結果進行分析和處理;計算結果的后處理採用vb編程實現龍口水力要素最大值等值線圖的繪制;並運用所編軟體對福建省福清市東壁島圍墾工程進行龍口水力計算,為堵口合龍提供科學依據。
  3. In the course of soft soil foundation ditch construction, according to the soil condition of main foundation ditch and characteristics of geology and geomorphology around in yaojiang lock, proper construction technology was adopted to achieve satisfactory construction effect with the least input

    摘要介紹根據姚江船主體基坑的土質條件和周邊的地形、地貌特點,在軟土地基基坑施工過程中因地制宜採取相應的施工工藝,以盡可能少的施工投入取得滿意的施工效果。
  4. In the construction peak, always leaked the protector the frequent trip to affect the work site normal construction seriously, regarding this kind of situation besides the enhancement job location management, to leaked the protector according to the job location actual situation to carry on the reasonable arrangement, both satisfied the security which the work site used electricity, and might reduce the leakage protector the frequent trip, for normal construction creation good power supply condition

    摘要在施工高峰期,總漏電保護器的頻繁跳嚴重影響了工地的正常施工,對于這種情況除了加強施工現場的管理外,根據施工現場實際情況對漏電保護器進行合理布置,既滿足工地用電的安全性,又可以減少漏電保護器的頻繁跳,給正常的施工創造較好的供電條件。
  5. The water level of the river networkcan be regulated effectively to meet crop demand, by controlling open time and lifting height of thetidal gate

    通過調節擋潮的運行時間和開啟度,使該系統既能滿足排澇要求,又能合理控制河網水位,使之滿足農作物生長對地下水位的要求。
  6. In order to meet the requirement of stability, loading and the distortion of the dam, the technique of vibration & impulsion was adopted to reinforce the overburden layer

    為了確保壩基礎能滿足壩基穩定、承載、變形的要求,設計上採用了振沖法對覆蓋層進行加固處理。
  7. Push rocker rotate to make the disc replace after fill up the device and cut down the dropping material

    待接料裝置滿載后再推動搖桿使扇形板復位,關閉截斷下落的物料。
  8. According to the demands of the enterprises, combining with the actuality, this dissertation has designed a hydraulic control system for inlet hatch, in order to meet the waterworks " requirements - cutting off the inlet in time when an electrical failure should occur. this system benefits the safety and well - running of waterworks. besides, with the simulink in matlab, it has simulated the dynamic characters of the system to optimize the parameters, components and system

    根據企業需求,結合現狀,本文設計了速閉液壓控制系統以滿足水處理廠遠程控制門及在斷電時快速切斷進廠水源的迫切需要,有利於保證水處理廠的安全、正常運行:利用matlab提供的simulink軟體包對速閉控制系統的動態特性進行模擬,來達到優化參數、元件、系統的目的。
  9. This would be a handicap for people to design a reasonable mode about the oasis water - soil resources development and utilization. the writer visited certain oasis in gansu province, including wuwei, zhangye, jiuquan and so on, and collected various actual information and carried out investigation and research about the nature and economy situation there, especially about the agriculture production and water utilization

    本文旨在從環境經濟學的角度,結合本區水資源利用的實際,對張掖綠洲內肅南、民樂、山丹、張掖、臨澤、高臺各子綠洲1970 ? ? 2002的30餘年間農業水資源利用情況進行研究,並以甘州區內代表不同類型灌區的大滿、小滿、烏江、三和安陽等五個鄉為對象,進行對比分析。
  10. In the case of repetition mode of the pulse power supply, fast charging circuit is designed to enhance the stabilize and charging efficiency of the dc power supply

    滿足脈沖電源重復頻率運行時直流電源的穩壓性問題,設計了晶管快速充電自停自補單元,同時也提高了整個電源系統的效率。
  11. At the same time, figures involving attribute data about flow field at inlet and outlet downstream or wave motion of water at the downflow head of lock chamber of siyang navigation lock were displayed through gis application system which we developed. according to data of baoying navigation lock acquired by mathematics model, figures about velocities which have the same value, velocities toward cross direction which have the same value and flow field at inlet and outlet upstream were formed. achievement data, space information and attribute information were in connection with figure so as to search for and analysis the information, which is satisfying

    同時完成了江蘇泗陽船下游引航道非恆定流及其改善措施的計算分析研究和寶應船上游引航道口門區水流條件計算分析研究,運用gis技術和所設計的gis應用系統對泗陽船下游引航道內流場以及下首水位波動情況進行信息顯示,根據對寶應船的計算結果生成上游引航道口門區等流速圖、橫向流速等值線圖和流場圖,使計算分析成果數據、空間信息、屬性信息與圖形顯示有機結合,便於查詢分析,效果令人滿意。
  12. Computer control unit produces the trigger pulses for the fast switching thyristors. fast switching thyristors are connected in parallels in order to meet the capacitance requirement of the circuit. trigger pulses produced by computer are amplified and isolated by three pulse transformers

    設計三級脈沖變壓器來隔離和放大計算機產生的觸發脈沖,得到強觸發信號滿足了多個快速晶管並聯觸發的功率要求以及系統的抗反擊電壓的要求。
  13. Gate and globe valves are available with a selection of wedge or disc configurations for different services

    閥和截止閥可以配置多種楔形板或閥瓣結構,以滿足不同的應用要求。
  14. It is found that, for the specialty of our 35kv lines, we should adopt synthetic lightning protection measures of power lines as the traditional measure could hardly keep up with the lightning protection requirement for its low line lightning protection level, high stripping outrage and bad maintenance

    通過研究發現,目前由於綿陽局35kv線路的特殊性, 35kv線路普遍存在採用傳統的防雷措施線路耐雷水平不高、雷擊跳率偏高、運行維護也較為困難等問題,難以滿足生產上的防雷要求,需對現行線路進行防雷綜合措施的處理。
  15. According to the structure layout of futang power station design, geological parameters and calculation results of seepage, the stability and stress of gate chamber and retaining dam are calculated, the security index and stress of anti - slide can can meet the requirement of criterion

    根據福堂電站工程設計的結構布置情況、地質參數及滲流計算成果,對室和擋水壩穩定、應力進行了計算,其抗滑穩定安全系數及應力標準均滿足規范的要求。
  16. As one of important components of relay protection, automotive reclosing device plays an important role in guaranteeing security, stability and economical running, etc. adaptive single - phase reclosing based on intelligent control is a new sort of protection principle, which develops with the advancement of power system technology and the progress of intelligent control theory

    自動重合裝置作為電力系統繼電保護裝置的重要組成部分,它在保證系統安全、穩定和經濟運行等方面起著非常重要的作用。智能式自適應單相重合是隨著電力技術的進步、智能控制理論的發展,為了滿足對電力系統自動重合所提出的更高要求而產生的一種新型的保護技術。
  17. In order to optimize the perpetuation tensioning tonnage of prestressed pier anchor wire of goupitan arch dam, first the scheme contrast method is adopted to define the perpetuation tensioning tonnage combination of the primary and secondary anchor wire, but the optimization result is that the pull - anchor coefficient is too big ; then the body form of the pier is optimized ; finally the anchor wire perpetuation tensioning tonnage is optimized by using ansys optimization design module based on parametric fem, the optimization result is acceptable and the pull - anchor coefficient is lowered down

    摘要為優化構皮灘拱壩中孔預應力墩錨索永存張拉噸位,首先採用方案優選的方法確定主次錨索永存張拉噸位組合,但優選結果拉錨系數偏大,再對墩體型進行優化,然後採用基於參數化有限元的ansys優化設計模塊對主次錨索永存張拉噸位進行優化,優化結果滿足應力控制要求,降低了拉錨系數。
  18. Hairy crab samples tested satisfactory

    蟹測試結果滿
  19. Combined with the construction programming of no. 3 lock, further studies on the flow pattern at various locks are undertaken. to the actual conditions of siyang locks and taking various effects into consideration, engineering measures which are expected to ameliorate the pattern of flow at lower lock approach are propose

    在此基礎上,結合泗陽三線船的建設規劃,進一步對各線船水流特徵進行了計算和試驗,針對泗陽船的具體情況綜合考慮多種因素,提出了改善下游引航道非恆定流的工程措施,獲得了滿意的結果。
  20. On the basis of comparison of different plan, calculation results of seepage of dam foundation and the calculation results of gate dam foundation settlement value and the integrated analysis of the calculation results of load supporting capacity, with additional reference to other project, the resolutions to the anti - seepage, anti - liquefaction and uneven sedimentation of foundation were put forward

    基於基礎處理各種方案的比較、壩基礎滲流的i }算結果、壩基礎沉降量的i一1算結果以及承載能力計算結果的綜合分析,參考借鑒其它_二程的成果和計算分析成果,提出了綜合解決壩基礎防滲、抗液化和不均勻沉降等問題的處理方案,該方案在各種組合工況下主要建築物的穩定、應力均能滿足規程規范要求。
分享友人