澆流系方案 的英文怎麼說

中文拼音 [jiāoliúfāngàn]
澆流系方案 英文
gating system plan
  • : 澆名詞(姓氏) a surname
  • : Ⅰ動1 (液體移動; 流動) flow 2 (移動不定) drift; move; wander 3 (流傳; 傳播) spread 4 (向壞...
  • : 系動詞(打結; 扣) tie; fasten; do up; button up
  • : Ⅰ名詞1 (方形; 方體) square 2 [數學] (乘方) involution; power 3 (方向) direction 4 (方面) ...
  • : 名詞1 (長桌) table; desk 2 (案件) case; law [legal] case 3 (案卷; 記錄)record; file 4 (提...
  • 方案 : scheme; plan; programme; project; proposal; suggestion; formula; scenario; outline
  1. Abstract : a brief introduction to scientific research in the three gorges project ( tgp ) and the applications of research achievements is given, which include treatment of newly slited layer on the foundation of the first stage earth - rock cofferdam, dumping bottom technique of river closure in deep water, construction of cut - off walls in the second stage earth - rock cofferdams, 3 - d computer simulation of river closure, concrete casting alternatives and selection of major construction equipment for the second stage construction optimization of durability of raw materials of concrete, deep sliding resistance and stability of the intake dam section, the section of the intake of the power station, the intake penstock of the power station, layout and hydraulics problems of shiplocks, stability of high slopes of shiplocks, and optimization of the system structural anchor bars to reduce the risk of cracking in the concrete wall and 700mw turbine generator units

    文摘:介紹三峽工程的科研項目,綜述三峽工程開工以來的主要科研成果及工程應用情況,包括:一期土石圍堰基礎處理與施工技術;大江截上下游土石圍堰平拋墊底研究;二期圍堰防滲工程研究;大江截計算機科學管理;大壩混凝土及主要施工機械選型;混凝土的原材料和耐久性優化試驗研究;大壩基礎深層抗滑穩定研究;三峽電站進水口型式研究;鋼襯鋼筋混凝土引水管道研究;蝸殼打壓、廠壩間伸縮節問題研究;永久船閘的引航道布置、輸水統及水力學、高邊坡穩定、混凝土襯砌墻的結構與支護研究;特大型水輪發電機組的科學研究。
  2. A brief introduction to scientific research in the three gorges project ( tgp ) and the applications of research achievements is given, which include treatment of newly slited layer on the foundation of the first stage earth - rock cofferdam, dumping bottom technique of river closure in deep water, construction of cut - off walls in the second stage earth - rock cofferdams, 3 - d computer simulation of river closure, concrete casting alternatives and selection of major construction equipment for the second stage construction optimization of durability of raw materials of concrete, deep sliding resistance and stability of the intake dam section, the section of the intake of the power station, the intake penstock of the power station, layout and hydraulics problems of shiplocks, stability of high slopes of shiplocks, and optimization of the system structural anchor bars to reduce the risk of cracking in the concrete wall and 700mw turbine generator units

    介紹三峽工程的科研項目,綜述三峽工程開工以來的主要科研成果及工程應用情況,包括:一期土石圍堰基礎處理與施工技術;大江截上下游土石圍堰平拋墊底研究;二期圍堰防滲工程研究;大江截計算機科學管理;大壩混凝土及主要施工機械選型;混凝土的原材料和耐久性優化試驗研究;大壩基礎深層抗滑穩定研究;三峽電站進水口型式研究;鋼襯鋼筋混凝土引水管道研究;蝸殼打壓、廠壩間伸縮節問題研究;永久船閘的引航道布置、輸水統及水力學、高邊坡穩定、混凝土襯砌墻的結構與支護研究;特大型水輪發電機組的科學研究。
  3. Abstract : based on the methods of the fuzzy theory, a mathematics model of fuzzy comprehensive evaluation for the problems of unbalanced flowing system of multi - cavity injection mold, have been established. fuzzy comprehensive evaluation of different processing conditions are made by the proposal method

    文摘:根據模糊論法的原理,針對一模多腔非平衡布置的統的動平衡問題,建立了模糊綜合評判的數學模型,完成了多種成型工藝的模糊評判。
  4. Reference to the designation of die casting mould, we put forward some kinds of projects respect to the design and manufacture of dies of the special purpose machine. and we simulate die casting filling process 、 surface defect distribution and temperature field etc. of az91d magnesium alloy shell part with flow3d software

    設計時將參照壓鑄模的設計法,提出多種,並使用flow3d模擬設計軟體來模擬金屬液的填充過程,預測可能產生缺陷的位置,從而決定統的形狀和分佈,冷卻水道的向和位置,分錐的大小和位置。
分享友人