瀑布模型 的英文怎麼說

中文拼音 [bàoxíng]
瀑布模型 英文
wate***ll model
  • : 瀑名詞[書面語] (急雨) torrential rain; rainstorm
  • : 模名詞1. (模子) mould; pattern; matrix 2. (姓氏) a surname
  • 瀑布 : waterfall; falls; cataract; sault; spout; linn瀑布湖 plunge lake; 瀑布線 fall line; 瀑布狀物 cascade
  • 模型 : 1 (仿製實物) model; pattern 2 (制砂型的工具) mould; pattern3 (模子) model set; mould patter...
  1. In these thesis, on the basis of existing data collected of arch bridges and dynamics, simply introduce the development and application of the analytical method and finite element numerical analysis method of arch bridges. taking the example of pubugou cfst arch bridge, establish 3 - d finite element model of it with software ansys, and analyze its natural vibration. the effects on inherent vibration of the differences of structure parameters, the restriction of the deck and the effects of different arrangements of cross braces are analyzed

    本文在收集有關拱橋及動力學資料的基礎上,分析了拱橋動力學的解析分析法和有限元數值分析方法的優缺點,同時以溝大橋為背景,使用ansys軟體建立了空間有限元,實施了橋跨結構的自振特性分析;並分析了考慮到簡化過程中部分結構參數取值差異、橋面板的約束狀況不同等因數對自振特性結果的影響;此外還對橋面上的橫撐置不同導致對自振特性的影響作了分析。
  2. In fact, every circle of its process is a simplified waterfall model

    事實上它的每一次迭代都是一個簡化了的瀑布模型的開發過程。
  3. From a testing perspective, the waterfall model offers one huge advantage over the other models presented so far

    測試界有這么一種觀點, 「瀑布模型」相對于現今其它的有著巨大的優勢。
  4. A project usually begins with analysis design, even if the development team isn t using a waterfall variant

    項目通常是從分析設計開始,即使在開發團隊不使用瀑布模型變體的情況下也是這樣。
  5. A project using the waterfall model moves down a series of steps starting from an initial idea to a final product

    一個使用「瀑布模型」的項目,從起初的概念一直到最終產品,需要一步一步的經過一連串的步驟往下走。
  6. Variations of the waterfall model loosen the rules a bit, allowing some overlap of the steps and the ability to back up one step if necessary

    某些「瀑布模型」的變種放寬了這一原則,允許步驟間的交迭,如果需要的話還可以返回到上一步。
  7. From an agile point of view, it is not advisable to understand all the requirements at the beginning of a project, analyze them, and then develop the architecture for the whole system like in a waterfall model

    從敏捷的角度看,以下這些做法是不明智的:在項目開始時了解所有需求,分析這些需求,然後為整個系統開發體系結構,就像在瀑布模型中一樣。
  8. The waterfall model is a software development model first proposed in 1970, in which development proceeds linearly through the phases of requirements analysis, design, implementation, testing ( validation ), integration and maintenance

    譯文:瀑布模型的軟體開發式是在1970年首先被提出的,在發展中完善,通過線性階段需求分析、設計、實施、測驗(驗證) 、集成和維護。
  9. In more waterfall - like project when they create one - big design document out of requirements and then implement it ? there may be some assumptions done when writing design, which will be dropped during implementation ; there may be miscommunications between developers ( integration problems ) if more than one person is involved in a single feature implementation

    在更接近使用瀑布模型的項目里,當開發人員根據需求撰寫了一份長篇的設計文檔並且去實現時,可以會有一些設計時已經假定做好的功能,但在實現時卻漏掉了;此時如果不止一個開發人員參與了某個單獨功能的實現,這就可能是開發人員這間缺乏交流的緣故。
  10. The design keeps to the classic life cycle of software engineering ( waterfall model ). according to software analysis, software design, software code and software maintenance, the design is divided into nine processes such as define systematic goal, feasibility analysis, demand analysis, outline design, design, software code, software test in detail, software maintain

    該設計遵循了軟體工程中軟體生命周期法(瀑布模型) ;按照軟體分析、軟體設計、軟體編碼、和軟體維護等過程,系統分為定義系統目標、可行性分析、需求分析、概要設計、詳細設計、軟體編碼、軟體測試、軟體維護等九個階段。
  11. More and more software organizations are moving away from the waterfall model of the life cycle to an iterative approach

    越來越多的軟體組織開始從向迭代式轉變。
  12. Waterfall and spiral methodologies set the context and deliverable definition at the start of a project

    和螺旋在項目開始時聲明前後關系和可交付定義。
  13. The highest level of a waterfall life cycle model is an example with its phases of : requirements, design, code, and test

    最高層次的生命周期及其階段劃分是一個例子:需求,設計,編碼和測試。
  14. Picture that put forward in the article graph and data structure reciprocal mapping support not merely to map graph from data structure efficiently, besides, regard graphics element as a unit, analyze and discern to user ' s modified graph, produce the corresponding data structure automatically, maintain consistency of graph and data structure efficiently on the foundation of expanding case graphic tools effectively, we direct against the intrinsic characteristic of traditional waterfall model, proposesmall loop model to software analysis based on graph and data structure reciprocal mapping solve problems of slow information feedbackand high track back cost efficiently

    文中提出的圖數互逆映射的思想,不僅對數據結構到圖形映射進行高效率地支持,同時,以圖形元素為單位,對用戶修改後的圖形進行分析和識別,自動生成相應的數據結構,有效地維護了圖數一致性。在對case圖形化工具進行有效擴展的基礎上,我們針對傳統開發的固有特點,提出了基於圖數互逆映射的軟體分析小循環,有效解決了傳統軟體分析設計階段信息反饋慢、回溯代價高等問題。
  15. Guilin lijiang waterfall hotel, the largest, latest and best - equipped hotel in guangxi, is now being rebuilt on the former site of lijiang hotel into a deluxe five - star hotel with an investment of over 400 million yuan. the artificial waterfall that rushes down from its top matches the picturespue ambience of the hotel, with shanhu lake glittering right down in front, lijiang river flowing on the east, elephant trunk park neighbouring on the south, and duxiu hill and diecai hill towering on the north. the waterfall, listed in the guiness book of records, is 45 meters high, 72 meters wide at the top and 75 meters at th bottom

    桂林灕江大飯店是目前廣西規最大設施設備最豪華的高星級飯店。它在原灕江飯店的基礎上,按五星級標準,以水景文化為背景,投資四個億進行大規的改擴建。飯店擁有:上部寬72米下部寬75米落水高度達45米的大人造,已列入大世界基尼斯紀錄。
分享友人