瀝青粘層 的英文怎麼說

中文拼音 [qīngniáncéng]
瀝青粘層 英文
asphalt carpet
  • : Ⅰ動 (液體滴落) drop; drip; trickle Ⅱ名詞(液體的點滴) drop; drip; trickle
  • : Ⅰ形容詞1 (藍色或綠色) blue or green 2 (黑色) black : 青布 black cloth; 青牛 black ox3 (年輕...
  • : 粘動詞(粘附) glue; stick; paste; adhere to; bond
  • : i 量詞1 (用於重疊、積累的東西 如樓層、階層、地層) storey; tier; stratum 2 (用於可以分項分步的...
  • 瀝青 : pitch; asphalt; bitumen; mineral resin; dacholeum; goudron; chian; pez; peucine; pitchblende
  1. Standard test method for the apparent viscosity of roofing bitumens using the parallel plate plastometer

    使用平行板塑性計測試屋頂表觀
  2. In this paper, a high performance sma system applied to steel bridge deck is put forth in allusion to the pavement project of the wuhan junshan yangtze river highway bridge. it comprises steel slab, zn coating layer, closing layer, adhesive, pre - mixed asphalt stone and dual layer sma from bottom to top. it is based on the fea results of the forces and deformation of the pavement layer by means of the algor feas, according to this bridge ' s traffic and the ambient temperature varying range of the pavement layer

    本文針對武漢軍山長江公路大橋鋼箱梁橋面鋪裝工程,從鋪裝環境溫度變化范圍、交通量等使用條件出發,在用algorfeas有限元分析軟體分析鋪裝受力變形基礎上,提出了(即鋼板+金屬鋅塗+封閉+接劑+預拌碎石+雙sma )的高性能鋼橋面sma鋪裝體系,並對這種sma的組成材料,包括改性、集料、礦粉、纖維進行了比較研究,設計了這種sma的配合比,對sma混合料的性能進行了對比試驗,對這種sma方案進行了疲勞性能研究,驗證了所選擇sma方案的可行性。
  3. Testing of bituminous binders ; effect of water on binder coatings ; bitumen emulsion binder coating

    合劑的檢驗.水對合劑塗的作用.乳化
  4. Testing of bituminous binders ; effect of water on binder coatings ; rapid curing cutback or cold tar binder coating

    合劑的檢驗.水對合劑塗的作用.快速固化輕
  5. The theoretical method for solving axisymmetrical problems in multilayered viscoelastic asphalt pavement half space

    路面彈性半空間軸對稱問題的求解
  6. Bitumen and bituminous binders - determination of the non - volatile matter content of bituminous coating materials

    合劑.材料中不揮發物質含量的測
  7. Usage : for making pitch felt, construction waterproof course, high - grade pitch paint etc, and it is also the material for making pitch tar or retarded tar and modified pitch, it is the bond for making mould coal ( coal ball ) and carbon material, timber anticorrosion paint and road pavement

    用途:用於制油氈、建築物防水、高級漆等,也是制取焦或延遲焦及改質的原料,做型煤(煤球)及炭素材料的合劑,木材防腐油及鋪路材料。
  8. The grade composite, road performance and its mechanism are systemically studied. 1 ) the aggregate grade of ogfc is studied through the volume method base on the analysis of the aggregate grades. then the grade is verified and the relation between the grade and pore rate is studied statistically, the typical grades of ogfc are developed ; 2 ) the reasonable pore rate of ogfc is studied on the basis of the balance of mechanics and function performance ; 3 ) the mineral fiber is added to the ogfc mixes to increase asphalt content, thus the anti - water performance of ogfc mixes are improved ; 4 ) high viscous asphalt fit for the preparation of ogfc is prepared through composite modification by sbs and rubber powder ; 5 ) the mechanics mechanism of ogfc is studied in the paper, it shows : asphalt paste, as well as the coarse aggregate skeleton, is essential to the mechanics of ogfc

    在分析各國ogfc級配的基礎上,運用礦料體積法進行ogfc級配設計,用正交實驗對礦料級配進行了優化設計,運用數理統計方法分析礦料級配和孔隙率之間的關系,並回歸出礦料關鍵篩孔通過率與ogfc骨架空隙結構關系的數學方程,進而提出了ogfc的合理級配;通過對不同孔隙率典型級配混合料的性能研究,綜合力學和功能性能,得出了ogfc的合理孔隙率范圍:針對高速公路面對ogfc力學性能方面的要求,本文從膠結材料、纖維穩定劑兩方面對ogfc的性能進行改善:通過sbs和橡膠粉復合改性的方法開發出了適合ogfc的高度改性,摻加聚合物纖維,提高ogfc的最佳用量,進而改善了混合料的高溫性能和抗水損害性能,優化設計出能滿足高速公路路用性能,車轍動穩定度達5000次/ mm以上,動融劈裂強度比90 ,透水系數31ml / s ,並具有防滑降噪功能的開級配磨耗( ogfc )混合料。
  9. In this project, the maximum height of the dam is 81m, but the deep overburden in the riverbed has the depth of 147. 95m which is about two times of the maximum height of the dam body, so the seepage and liquefaction prevention of the dam foundation becomes the key and important problem in the design of the dam project. the static stress and deformation under three different projects - horizontal blanket project, clay core project and asphalt core project - for the dam is analyzed comprehensively. the damage that may be induced by variable factors on the dam body in time of engineering completion and water impounding operation period is seriously studied

    其次,將這一模型用於分析下坂地水利樞紐工程,由於該工程河床覆蓋深度最深達147 . 95m ,是壩體高度的近兩倍左右,壩基的滲流和液化成為壩體安全主要問題,本文對該壩的三種設計方案即水平鋪防滲方案、土心墻防滲方案及心墻防滲方案的靜態應力位移及壩體在竣工期、蓄水期等各個階段可能產生的破壞進行了認真研究。
  10. The choice dam type is especial importance, during the designed research of the rock - fill dam, particular under the rock - fill dam with very deeply cover layer, the stress and strain of the middle wall and cutting interpenetration wall of the dam foundation is mostly sensitive, whether the. design of dam is scientific and reasonable, it is very important for cutting interpenetration and stability of the dam, the article offer the reference for the design of cutting interpenetration in the foundation with deep cover with earth the water conservancy in xiaban zone, based on the study and analysis the design of cutting seep in the foundation with deep cover with earth, cutting interpenetration concrete wall and the joining model of cutting interpenetration material in body of dam and the applying effect in the practical worko based on the foundation which absorbed and summarize the achievement of design and research in the inter and outer country, for the project of the clay vertical middle wall and vertical cutting interpenetration, the asphalt concrete vertical middle wall and vertical cutting interpenetration the clay inclined middle wall and the lever carpet layer cutting interpenetration, respectively in terms of the different stage of complete period sluice period and working condition, adopting nonlinear calculate and analysis with the finite element method ; carrying the analysis and study with the 3d finite element method as to the different joining model of the left bank high slope cutting interpenetration body and the foundation concert cutting interpenetration wall ; carrying the analysis and study with the 3d finite element method as to the effect of the wall stress and strain because of the different elasticity modulus of the concert cutting interpenetration wall through the analysis and study with the different project. have comparatively all - around comprehended the various model dam, particular the distribute rule of stress and strain of the cutting interpenetration system, provide for the important evidence of the plastic area size the join model of the foundation cutting interpenetrate wall and dam body cutting interpenetrate system the choice of the dam model and the design of the structure of the dam body, the result of research and advice have very importance value in design and building for the similarity project

    工程設計中,壩型的選取顯得尤為重要,特別對于壩基有深厚覆蓋的堆石壩,心墻和壩基防滲墻的應力和變形是壩體、壩基最敏感的部位,設計方案是否安全、科學和合理,對大壩防滲和穩定起到至觀重要的作用。本文研究分析了國內外深厚覆蓋基礎防滲設計、壩基混凝土防滲墻與壩體防滲體銜接形式及工程實際應用效果,為下坂地水利樞紐工程深厚覆蓋基礎防滲設計的方案選擇提供了參考;在吸收和歸納了國內外堆石壩的設計研究成果的基礎上,對土心墻和壩基垂直防滲方案、混凝土心墻和壩基垂直防滲方案以及土斜心墻和壩基水平鋪蓋防滲方案,分別按竣工期和蓄水運行期的不同工作情況進行了有限元非線性計算分析;對左岸高陡邊坡的大壩防滲體與基礎混凝土防滲墻的不同結合型式進行了三維有限元靜力計算分析和研究;對混凝土防滲墻不同彈性模量對墻體應力和變位的影響進行了三維有限元靜力計算分析和研究。通過對不同方案的計算分析和研究,比較全面的了解了各方案壩體,尤其是防滲體的應力和變形分佈規律,為壩型選擇、壩體結構設計、基礎防滲墻與壩體防滲體的結合型式以及塑性區大小的確定提供了重要依據。
  11. Study on the preparation and adhesive property of modified asphalt

    改性瀝青粘層材料的配製和接性能研究
  12. Research and development and application of sbs modified asphalt for tack coat

    改性瀝青粘層材料的研製與應用
  13. Bituminous asphalt. laying of base, binder and surface courses. components. mix contents. performance and checks

    .底.結料和表面.成分.混合物成分.性能和檢驗
  14. Negative pressure blockage and biological blockage are two main forms of blockage for the special structure of zippered plastic pipes, so two treatments were made here : ( i ) nonwoven fabrics glued by neoprene and ( ii ) nonwoven fabrics glued by neoprene with a layer of asphalt emulsion applied outside

    由於拉鏈式塑料管的獨特構造(拉鏈式滲水孔口) ,所以它的堵塞主要應是負壓堵塞和生物堵塞,為此設2個處理:氯汀膠無紡布和氯汀膠無紡布並外塗一乳化進行試驗研究。
  15. Standard test method for prediction of asphalt - bound pavement layer temperatures

    預測地合鋪溫度的標準試驗方法
  16. The causation of main defects is analyzed from the view of design and improvements are suggested from the structural design, such as the test and determination of basic data of pavement design, rational selection of raw materials, adopting appropriate aggregate sizes, improving blend design method, rational selecting the thickness of asphalt layer and reinforcing the binding between the asphalt pavement layer and the base layer to further improve the operational function of the asphalt pavement and reduce the occurrence of traffic accidents

    通過對高速公路路面的主要病害成因從設計角度進行分析,提出應從完善路面設計基礎數據的測試與確定方法、合理選擇原材料、採用合適的礦料級配、完善配合比設計方法、合理選擇厚度、加強間及與基結等途徑完善路面結構設計,以進一步提高路面的使用功能,減少道路交通安全事故的發生。
  17. Granulated crumb rubber act as aggregates in mixture, which are crashed from scrap tires. ice and snow layers are in different conditions on granulated crumb rubber asphalt pavement for elasticity of granulated crumb rubber. thus it can be eliminated from pavement

    由於具有高彈特性的橡膠顆粒的存在,改變了橡膠顆粒路面表面冰雪的受力狀態和冰雪與路面的結狀態,使橡膠顆粒路面能夠有效地抑制路面積雪結冰,從而為季節性冰凍地區的抑制路面冰雪問題提供了新的解決方案。
  18. Bitumen and coal tar pitch ; effect of water on binder coatings ; testing of fluxed bitumen binder coatings

    和焦油.水對合劑塗的作用.軟制
  19. Adopting the viscous - elastic method of energy conversion, the stress, strain and fracture distribution or evolvement rules of the composite structure of steel bridge deck asphalt mixture surfacing were explored

    採用彈性損傷模型的能量轉換方法對鋼橋面混合料鋪裝應力場、應變場及損傷場分佈狀況進行研究。
分享友人