灌注指數 的英文怎麼說

中文拼音 [guànzhùzhǐshǔ]
灌注指數 英文
perfusion index
  • : Ⅰ動詞1 (輸水澆土) irrigate 2 (倒進去; 注入) pour in; fill 3 (飲酒; 勉強他人飲酒) drink wine...
  • : Ⅰ動詞1 (灌入) pour; irrigate 2 (集中) concentrate on; fix on; focus on 3 (用文字來解釋字句)...
  • : 指構詞成分。
  • : 數副詞(屢次) frequently; repeatedly
  • 灌注 : pour into; priming; flood灌注機 bottler placer
  • 指數 : 1. [經] (比數) index number; index 2. [數學] exponent
  1. Especially indicate how to calculate the modulus of partially cfst arch bridge axis with different section and not even constant loads mass degree

    特別出了部分鋼管混凝土拱橋截面不統一且恆載集度有變化的前提下,如何考慮其拱軸系的計算。
  2. In this section the author analyses the rules of the pile ultimate tip resistance and the shaft friction resistance distribution and their exertion of cast - in - place socketed piles instrumented with strainometers in soft muddy rock. the second aspect of the paper is the analysis on the current rock pile vertical bearing capacity in the four standards gb50007 - 2002, tb 10002. 5 - 99, jtj024 - 85 and jgj94 - 94, then the design method with correlated formula of socketed piles in xigeda - mudstone is given. at the end of this paper, based on the research of pressure grouting technique in recent years, and combined with in - site test result, this paper puts forward the design and calculation method to grouted pile in xigeda - mudstone and the principle of choosing grouting parameters, which provid es experiences for applying this technique and further studying

    本論文結合省級科研項目「西攀高速公路昔格達組泥巖層中鉆孔樁提高承載力的研究」 ,所做的研究工作主要在以下三個方面:一是根據8根樁身內埋設量測元件試樁的單樁豎向靜載荷試驗資料,分析了各試驗樁特別是常規沖孔嵌巖樁在昔格達泥巖中的軸向力、側摩阻和樁端阻力的分佈和發揮規律;二是在討論現行規范對嵌巖樁承載力的計算公式的基礎上,探討了在昔格達泥巖層中的沖孔嵌巖樁的側摩阻和端阻的計算方法,並推薦了相應的計算公式;最後,在吸取近年來對樁后漿技術研究成果的基礎上,結合現場試驗研究結果,分析了該項技術在昔格達巖層中的應用效果,提出了相應的參選取,從而為壓力漿技術的工程應用和進一步研究提供經驗,並為今後在該地層中合理選用樁型以及導施工提供了依據。
  3. Adopting the deformation harmony theory, the numeric calculation of the curve of load versus settlement is made. the fitting results between the calculated curve of load - settlement and the measured one of piles with different construction process are illustrated. hence, under the condition of few or no static load test data, the performance of bearing capacity of single bored pile in loess may be predicted utilizing indexes of shear wave velocity, static cone penetration test and modification coefficient of depth, so it is remarkable to reduce the blindness of preliminary design of pile

    通過室內試驗及原位測試標進行理論計算與現場實測值的對比,筆者引入了施工工藝修正系k _ ( c1 )和k _ ( c2 )及深度修正系,使理論計算值與現場實測值具有良好的一致性,進而通過變形協調理論對荷載?沉降曲線進行值計算,並用不同施工工藝的實例說明了理論計算荷載?沉降曲線與實測荷載?沉降曲線的擬合效果,從而達到可在不做靜載荷試驗或少做靜載荷試驗的情況下通過剪切波速和靜力觸探試驗標以及施工工藝修正系等預測黃土地基中鉆孔樁承載性狀,這對于工程初步設計中減少設計的盲目性具有十分重要的現實意義。
  4. Five factors of effecting specify the bearing capacity of drilled grouting pile ( engineering properties of soil, structural dimension of pile, stiffness of pile, time ) have been concluded through introducing the transmission of load mechanism of drilled grouting pile. at the same time, the effecting parameter has been collected. the paper build the ann model in predicting ultimate bearing capacity of drilled grouting pile and discuss in detail the extraction of inputting nodes information when quoting the fundamental principle of ann model and introducing research process of the improved bnn

    本文簡要介紹了樁基承載力的研究現狀並出將神經網路引入樁基工程的意義,從介紹單樁荷載傳遞機理出發總結了影響單樁極限承載力的五種因素(樁周土的工程性質、樁身結構尺寸、樁的剛度、時間以及施工工藝)並提取了相應的參;引用神經網路基本原理,詳細介紹了改進bp神經網路的研究過程,從而建立了預測鉆孔樁極限承載力的神經網路模型;並詳細討論了本模型的神經網路輸入結點信息的提取,在工程實例的基礎上進行了值計算。
  5. The system is based on cantilever bottling pile design method. through analysing the cantilever bottling pile design principle and optimum design method, according to guiding theory of soft project, adopting with human - computer interactive design and two - dimentional parameter drawing, the sysytem is made a software that had a friendly ui. it enable user to break away from the design manual, finish all cantilever bottling pile designing and construction drawing on the computer

    本系統是以懸臂式樁的設計方法為基礎,通過分析總結懸臂式樁設計原理與優化設計方法,根據軟體工程的導思想,採用功能完善的人機交互設計和二維參化繪圖開發出的人機界面友好的軟體,使用戶能脫離設計手冊,在計算機上完成全部的懸臂式樁設計和施工圖繪制工作。
  6. Correlative function method and variable function method are used to calculate the relevant range of soil layer. the limit capacity of bored pile is determined by the cone penetration tests ( cpt ) and the static loading tests and related statistics parameters are also evaluated. considering the effects of group piles, the action effect is calculated by the settlement of pile foundation and the reliability index of single pile as well as group piles is determined by monte - carlo method

    本文選擇臨近場地的四座高層建築地基的全部勘測資料,以沿深度方向的一維平穩高斯隨機場作為樁基土層土性參學模型,利用相關函法和變異函法計算土層的相關范圍,由cpt和靜載試驗結果綜合確定鉆孔樁的極限承載力,進而對相同場地各試樁的承載力進行折算后檢驗其概率分佈,並估計有關統計參:考慮群樁效應確定樁基承載力,由樁基沉降反算其作用效應,由monte - carlo方法計算單樁及群樁的可靠標。
分享友人