灌漿洞 的英文怎麼說

中文拼音 [guànjiāngdòng]
灌漿洞 英文
grouting tunnel
  • : Ⅰ動詞1 (輸水澆土) irrigate 2 (倒進去; 注入) pour in; fill 3 (飲酒; 勉強他人飲酒) drink wine...
  • 漿 : 漿同「糨」
  • : Ⅰ名詞(物體上穿通的或凹入較深的部分; 窟窿; 洞穴) hole; cavity Ⅱ形容詞(深遠; 透徹) profound; thorough; clear
  • 灌漿 : 1 (澆灌灰漿) [建築] grout; grout in; grouting; grouting up; [采礦工程] injection2 [植物學] (穀...
  1. In addition, this paper carry out successfully the support design practice in the preceding excavation of 4km long exploratory tunnel. according to the thesis research results, the following conclusion can be drawn. if the grouting rock can possess sound anti - seepage capability and the liner structure can hold higher hydraulic permeability relatively, and if the adjoining rock can be made as primary load - bearing structure by construction measure, the stability of country rock and the safety of liner structure will be guaranteed

    計算結果表明,如果能使錦屏工程引水隧漿圈圍巖具有較好的防滲性能,將高外水壓力控制在漿圈以外,再配合透水性相對較好的支護結構以及排水措施,使漿圈圍巖成為主要承載結構,並使襯砌結構和漿圈共同承載,是可以保證圍巖的穩定和支護結構安全的。
  2. Design and operation of the carrier for consolidation grouting in large diameter diversion tunnels of xiaolangdi project

    小浪底工程導流徑固結漿施工臺車的設計與運行
  3. The high pressure consolidation grouting is a routine measure for tunnel construction treatment, the safe operation of tunnel depends much on the grouting quality, so it is very important for tunnel construction to detect the construction quality to get rid of the safety risk

    摘要高壓固結漿是隧施工處理的常規手段,其質量直接影響隧運行安全,因此對施工質量進行檢測以便排除隱患十分重要。
  4. Application of semi - prestressed grouting in water conveyance tunnel

    半預應力漿在輸水隧中的應用
  5. Construction of jinshao water diversion tunnel grouting

    金哨引水隧漿施工
  6. On the backfilling grouting technique to blook up the branch tunnel

    封堵混凝土回填漿技術
  7. This paper presents a new synthesized statistical method for acoustic detection data processing based on the contrast to and statistic & analysis on a great deal of data of acoustic detection, elastic modulus and tunnel operation conditions, which has been applied in many hydropower projects

    為此,通過對大量聲波、彈模數據和工程運行情況進行對比、統計和分析,總結出了一種針對隧高壓固結漿效果的多種聲波檢測綜合數據統計方法,並已用於多個水電項目中。
  8. Complicated hydrologic and geographic conditions, and the large scale of the xiaolangdi hydraulic project on the yellow river are introduced briefly. three desilting tunnels are designed to meet the requirements of flood control, sediment discharge and runoff regulation. according to the performance requirements of desilting tunnels, the tunnel lining down - stream of the grouting curtain is designed to be post - tensional prestressed lining. on the basis of investigation and research, experiements and analysis, the unbonded prestressing system is used. it is the largest unbonded prestressed tunnel lining project in the world, and the first one in china

    簡介黃河小浪底水利樞紐復雜的水文、地質條件以及龐大的工程規模.該樞紐設計有3條排沙,擔負著泄洪、排沙、調節徑流和保證進水口不被泥沙淤堵的任務.根據排沙的水庫運用要求,漿帷幕下游排沙身段設計為混凝土后張預應力隧.通過大量的調研、試驗、分析論證,在施工前確定該預應力方案選用無粘結預應力系統,成為目前世界上規模最大的無粘結預應力隧襯砌工程,在國內尚屬首例
  9. ( 2 ) the method of finite element discrete and optimal parameter back analysis is adopted. ( 3 ) concentrated on the question of high external water pressure of the deep - lying tunnel, the basic theory and method calculating external water pressure are systematically studied. ( 4 ) based on jinping cascade 2 hydropower station, numerical simulation rain infiltration of seepage field under different drainage pattern and grouting pattern are studied, also, the high external water pressure is analyzed and studied and some seepage control measures are put forward

    ( 2 )採用有限元離散?優化法進行參數的反演分析; ( 3 )針對深埋隧的高外水壓力問題,進一步分析和研究了襯砌水荷載及外水壓力的作用機理和計算方法; ( 4 )以錦屏二級水電站深埋長引水隧作為本文的主要研究對象,採用考慮降雨入滲滲流場分析的方法對排水方案和漿封堵方案不同情況下的滲流場的水頭分佈進行了數值模擬,並對其外水壓力進行了分析和研究,提出了滲流控制的具體措施。
  10. Secondly, grounded on the study of the distribution of the high external waterpressure and high geostress and the characteristic of the rock in engineering area, the paper built the elastoplastic fem numerical simulation model, and think over the procedure in tunnels excavation and the history of work of water load, and then get the relations between the different tunnels diameter, different permeability coefficient and depth of the grouting rock and the deformation, stress distribution and plastic range of the surrounding rock and support structure. finally, according to the modern design theory of tunnels construction, the particular design of country rock reinforcement and support structure are researched and presented for diversion tunnels

    接著,本文在深入研究工程區高外水壓力及高地應力分佈規律及巖體特性的基礎上,建立起高地應力、高外水壓力作用下隧圍巖結構非線性有限元模擬計算模型,然後考慮隧的開挖過程、水荷載的作用歷史,通過計算分析得出了不同徑、不同的漿圈滲透系數和不同的漿圈深度以及不同開挖過程與圍巖及支護結構的應力、位移和塑性區的關系。
  11. Grouting test of 6 tunnel in the south main line of yellow river division project

    引黃工程南干線6號隧漿試驗
分享友人