灌漿試驗 的英文怎麼說

中文拼音 [guànjiāngshìyàn]
灌漿試驗 英文
grouting test
  • : Ⅰ動詞1 (輸水澆土) irrigate 2 (倒進去; 注入) pour in; fill 3 (飲酒; 勉強他人飲酒) drink wine...
  • 漿 : 漿同「糨」
  • : 名詞(古代占卜用的器具) astrolabe
  • : 動詞1. (察看; 查考) examine; check; test 2. (產生預期的效果) prove effective; produce the expected result
  • 灌漿 : 1 (澆灌灰漿) [建築] grout; grout in; grouting; grouting up; [采礦工程] injection2 [植物學] (穀...
  • 試驗 : trial; experiment; test
  1. Directed against the problem on confirming vertical bearing capacity of large diameter cast - in - place pile in the west of coteau area of yunnan province, the paper, analyses the influence degree of the variety of soil physics and mechanics property in area geology condition on bearing capacity of pile foundation, through 5 piles " loading test ; the influence degree of construction technics on bearing capacity of pile foundation under the influence of every exterior factors ; the influence degree of grouting injection around the pile shaft on bearing capacity of pile foundation

    本文針對滇西山區大直徑注樁豎向承載力確定存在的問題,進行了5根樁的靜載荷,分析了區域地質條件下土的物理、力學性質的變化對橋梁樁基承載力的影響程度;地下水對樁承載力的影響程度;各種外部因素影響下,樁的施工工藝對樁承載力的影響程度;通過在樁體周圍土中注漿對樁承載力的影響程度。
  2. Standard test method for sampling and testing grout

    漿取樣和的標準方法
  3. Test of grouting and water injecting technology and its application to extinguishing spontaneous combustion of oil shale foundation soil

    漿注水處理油母頁巖矸石地基自燃的與應用
  4. Standard test method for water retentivity of grout mixtures for preplaced - aggregate concrete in the laboratory

    在實室內進行預置集料混凝土漿混合料保水性的標準方法
  5. Admixtures for concrete, mortar and grout - test methods - part 5 : determination of capillary absorption ; german version en 480 - 5 : 2005

    混凝土灰漿漿用混合料.方法.第5部分:毛細
  6. Inspection of xiluodu hydroelectric power station dam foundation consolidation grouting test

    溪洛渡水電站壩基固結灌漿試驗檢測
  7. Test process of consolidation grouting without ballast in dam foundation of goupitai hydropower station

    構皮灘水電站壩基無蓋重固結灌漿試驗工藝
  8. Standard test method for determining triaxial compression creep strength of chemical grouted soils

    測定化學漿土壤的三軸壓縮蠕變強度的標準方法
  9. During the construction of the dam foundation cut - off for dalong water control project, the construction techniques adaptable to the construction under the condition with high interference, short construction period and strict quality standard are selected through the related productive experiment, with which the problems such as the prevention and treatment of hole collapse and lowering steel reinforcement cage and pre - embedded grouting pipe into place are solved, and then the successful construction of the cut - off is guaranteed as well

    摘要在大隆水利樞紐壩基防滲墻施工過程中,通過生產性選擇出了適合該防滲墻工程施工干擾大、工期緊、質量標準高的要求的施工技術,解決好了孔口塌孔的預防、處理及鋼筋籠和預理漿管下設等技術難題,保證了該防滲墻工程的成功建設。
  10. Experimental research on grouting soft rock foundation under toe slab of siping concrete faced rockfill dam

    寺坪面板堆石壩趾板軟巖基礎灌漿試驗研究
  11. In this section the author analyses the rules of the pile ultimate tip resistance and the shaft friction resistance distribution and their exertion of cast - in - place socketed piles instrumented with strainometers in soft muddy rock. the second aspect of the paper is the analysis on the current rock pile vertical bearing capacity in the four standards gb50007 - 2002, tb 10002. 5 - 99, jtj024 - 85 and jgj94 - 94, then the design method with correlated formula of socketed piles in xigeda - mudstone is given. at the end of this paper, based on the research of pressure grouting technique in recent years, and combined with in - site test result, this paper puts forward the design and calculation method to grouted pile in xigeda - mudstone and the principle of choosing grouting parameters, which provid es experiences for applying this technique and further studying

    本論文結合省級科研項目「西攀高速公路昔格達組泥巖層中鉆孔樁提高承載力的研究」 ,所做的研究工作主要在以下三個方面:一是根據8根樁身內埋設量測元件樁的單樁豎向靜載荷資料,分析了各樁特別是常規沖孔注嵌巖樁在昔格達泥巖中的軸向力、側摩阻和樁端阻力的分佈和發揮規律;二是在討論現行規范對嵌巖樁承載力的計算公式的基礎上,探討了在昔格達泥巖層中的沖孔注嵌巖樁的側摩阻和端阻的計算方法,並推薦了相應的計算公式;最後,在吸取近年來對注樁后注漿技術研究成果的基礎上,結合現場研究結果,分析了該項技術在昔格達巖層中的應用效果,提出了相應的參數選取,從而為壓力漿技術的工程應用和進一步研究提供經,並為今後在該地層中合理選用樁型以及指導施工提供了依據。
  12. The grouting is the most useful method of the ground treatment, specially to deal with the rock foundation of the dam. because of the concealment, complexity and importance of the grouting project. the grouting test must be done to determine the grouting parameter, such as the grouting technology, the grouting material, etc

    漿是基礎處理的常用方法,尤其是建立在巖石基礎上的大壩的基礎處理,由於漿工程的隱蔽性、復雜性和重要性,通常需要進行灌漿試驗來確定漿工藝、漿材等漿參數,而灌漿試驗由於其復雜性、數量的限制等因素難以為漿施工提供全面有效、真實的漿信息。
  13. Application of high - pressure jet grouting test in consolidation works of quting reservoir

    高壓噴射灌漿試驗在曲亭水庫除險加固工程中的應用
  14. Grouting test of 6 tunnel in the south main line of yellow river division project

    引黃工程南干線6號隧洞灌漿試驗
  15. Curtain grouting test for replacing seepage prevention wall of stage i soil - rock cofferdam of tgp

    三峽工程一期土石圍堰以幕代墻灌漿試驗
  16. Design and construction of the chemical grouting for the shale rock dam foundation of the xinanjiang hydroelectric project

    新安江水電站壩基頁巖化學灌漿試驗設計與施工
  17. For checking the availability and rational of the computing program, the grouting test in - situ of the xiluodu hydroelectric project were simulated and computed, and also simulated the next conditions which the result of the grouting test will be used in

    為檢所編程序的合理性和適用性,對溪洛渡工程的現場固結灌漿試驗進行了模擬計算,並對灌漿試驗成果將來運用情況進行了補充模擬計算。
  18. 5. there are 979. 32 meter long to the curtain of the xiangshuiriver reservoir include 879. 32 meter " s long double row curtain ( about 92 percent ) in the original design. by optimizing the design according to the grouting test, the double row curtain was cut down to 245. 66 meter length ( 25 per cent of them ), the density of the bore hole have from 0. 81m / m2 reduced to 0. 64m / m2. total save 4. 47 million rmb cost of the project

    5 、在總長為979 . 32m長的帷幕段中,初設批復方案的雙排帷幕總長為879 . 32m ,占帷幕總長的92 % ,根據灌漿試驗研究成果優化設計后,雙排帷幕長度減少至245 . 「 m ,僅占帷幕總長度的25 % 。
  19. ( 4 ) one row seepage wall, which is formed by sprinkling grouting method, is used to the xiacouba reservoir project for cutting off the way of seepage on the basis of the project condition and grouting test. the results testified that a sound effectiveness of preventing seepage could be attained by the application of the high - pressure sprinkling grouting technology if design paramenter is proper and the construction quality is controlled strictly

    根據工程要求、 _仁質條件及灌漿試驗,本工程選用單排旋噴套接的方式形成防滲墻,實踐證明,只要設計參數合理,施工過程嚴格控制,利用高壓噴射漿技術可達到防滲、堵漏的目的。
  20. In this paper the computing program which can simulate the grouting test on the computer has been setup by using she theory of the simulation and computation. and more real available information to the grouting construction can be supplied by using the result of this simulation and the result of the grouting test

    本論文圖運用工程模擬模擬理論編制計算程序,在計算機上實現對漿過程、漿成果的模擬,並結合灌漿試驗的成果,對漿施工提供盡可能多的、有效的信息。
分享友人