灌漿造模法 的英文怎麼說

中文拼音 [guànjiāngzào]
灌漿造模法 英文
grout molding
  • : Ⅰ動詞1 (輸水澆土) irrigate 2 (倒進去; 注入) pour in; fill 3 (飲酒; 勉強他人飲酒) drink wine...
  • 漿 : 漿同「糨」
  • : Ⅰ動詞1 (做; 製作) make; build; create; produce 2 (假編) cook up; fabricate; concoct 3 [書面語...
  • : 模名詞1. (模子) mould; pattern; matrix 2. (姓氏) a surname
  • : Ⅰ名詞1 (由國家制定或認可的行為規則的總稱) law 2 (方法; 方式) way; method; mode; means 3 (標...
  • 灌漿 : 1 (澆灌灰漿) [建築] grout; grout in; grouting; grouting up; [采礦工程] injection2 [植物學] (穀...
  1. Fabrication of the box beam is divided into such parts as reinforcement, formwork, concreting, prestressing, moving and storing of beam, pipe grouting under pressure, end sealing of the beam, water - proof layer on the bridge surface system, protective coating etc. the paper makes description of effective box beam construction technology and workmanship which can be adopted in other projects, such technologies as : manufacturing and fixing of reinforcement, steel reinforcement fixing baseplate, web plate and top plate respectively and lifting the steel skeleton into form, requirements of design and manufacturing and way of utilization for dismantling - erection type formwork and hydraulic formwork, optimization of concrete ratio, concrete pouring process of two ends of beam in priority over the middle, in sequence of first baseplate followed by web plate and top plate at last, concrete pouring in inclined section and in horizontal layer, concrete vibration mainly by external vibrator in assistance with internal vibrator, methods and regulation for steam curing of concrete, dual controls over stress and strain to ensure quality of prestressing workmanship, construction method of effective beam moving by heavy - weight special moving facility, some regulations and key notes about construction of grouting under pressure, beam ends sealing, water - proof layer on the bridge surface system, protective coating

    箱梁製由鋼筋工程、板工程、混凝土工程、預應力工程、移存梁工程、孔道壓漿工程、梁體封端工程、橋面防水層和保護層工程等施工環節組成。文中介紹的採用胎具製作和綁扎鋼筋,分底腹板和頂板分別綁扎並吊裝鋼筋骨架入;拆裝式和液壓式兩種板的設計、製作要求和使用方;綜合考慮、優化混凝土配合比,混凝土注從兩端至中間、先底板、后腹板、再頂板的施工順序和斜向分段、腹板水平分層、附著式振搗為主、插入式搗固為輔的施工工藝,蒸汽養護的方和規定;應力應變雙控制確保預應力施工質量的施工技術;採用重物移運器有效移梁的施工方;壓漿、封端、橋面防水層和保護層施工的一些規定和注意事項等都是對箱梁製行之有效的施工技術和施工方,並可為以後類似施工作借鑒。