灰渣的 的英文怎麼說

中文拼音 [huīzhāde]
灰渣的 英文
cindery
  • : Ⅰ名詞1 (物質燃燒后剩下的粉末狀的東西) ash 2 (塵土; 某些粉末狀的東西) dust 3 (特指石灰) lime...
  • : 名詞1 (渣滓) dregs; residue; sediment:煤渣coal cinder; 殘渣 dregs; 豆腐渣 soya bean residue; 豬...
  • : 4次方是 The fourth power of 2 is direction
  1. On the basis of the characteristic of the industry waste slag, which is high added to the hsfab, different kinds of catalyzing methods are adopted to make the waste residue more active. the additive f, developed by the author can obviously improve the mechanics characteristic and durability of hsfab, especially the restraining of the drying shrinkage. based on the study of technics parameters and the problems in the manufacture, hf - 1100 series full - automatic hydraulic pressure wall brick presses is chosed to solve the problems, such as low molding pressure, low efficiency and the certified product ration

    在hsfab研究方面,通過兩種體系hsfab (即「水泥?鋼?粉煤?爐」和「石?鋼?粉煤?爐」體系)配方優化設計,使之具有良好社會、經濟和環境效益;在高摻量工業廢前提下,根據各種原料特性,對其採用不同活化技術,使其具有較高活性;自研外加劑f ,對hsfab製品物理力學性能和耐久性能均有明顯改善作用,尤其是對製品乾燥收縮性能有顯著抑制作用;通過對工藝參數研究,結合實際生產普遍存在問題,選取了hf - 1100系列全自動液壓墻體磚壓機,有效地解決了傳統制磚過程中常見成型壓力低、生產效率低、產品合格率低(即「三低」現象)等問題。
  2. The influence of the type and amount of active strengthening agent, cement - blast ratio and cement dispersity have been studied to the property of fly ash blast cement

    研究了活性增強劑類型及摻量、比和水泥分散度對粉煤水泥性能影響。
  3. Research on construction technology of earth and rock - fill dams and tailing dam, soft foundation improvement and aseismatic engineering

    土石壩工程、築壩技術、軟土地基加固、工程抗震等研究領域取得了富有創造性、具有國際先進水平成果。
  4. Since the system can display with image the ash and slag distribution in the ash - pit under the boiler in a real - time manner, it helps people effectively control the operation of the ash system

    該系統能實時繪圖顯示爐底坑內分佈情況,使運行人員充分掌握爐底出系統運行情況,取得了很好效果。
  5. Distribution of thallium in pyrite ores and its cinders of yunfu pyrite mine guangdong

    雲浮硫鐵礦及其焙燒中元素鉈組成特徵
  6. Resilient floor coverings. identification of linoleum and determination of cement content and ash residue

    彈性地板覆蓋物.油氈識別和成分.膠劑含量和灰渣的測定
  7. Testing of solid fuels - determination of chemical composition of fuel ash - part 11 : determination by inductively coupled plasma emission spectrometry icp - oes

    固定燃料試驗.燃料化學成份測定.用電感耦合
  8. It can be used for water supply and drain in factories, mines, cities and power stations, agricultural water drain and irrigation as well as water engineering

    如精礦尾礦水泥泥土礦礫等強硬度強腐蝕高濃度漿。被輸送固.
  9. Project assessment, feasibility analysis, designing, installation, commissioning of auxiliary control system in power plant, include ash & slag system, coal conveying system, water treatment system, oil conveying system, auxiliary boiler etc

    電廠輔助控制系統(、輸煤、化學水處理、燃油、輔助鍋爐等)項目評估,工程造價、設計、安裝、調試。
  10. Article 33 whoever stores in open air metallurgical slag, residue of chemical industry, cinder of burned coal, ettle, ore tailings or other industrial solid waste shall build special installations and sites for the purpose

    第三十三條露天貯存冶煉、化工、燃煤、廢礦石、尾礦和其他工業固體廢物,應當設置專用貯存設施、場所。
  11. Firstly, the spontaneous drop of slag on walltube at the time of boiler load shift is researched and it is the innovative research on the effect on the slagging of boiler operation

    首先探索鍋爐變負荷運行時爐膛自然掉機理,創新性地開展鍋爐運行條件對爐膛灰渣的影響。
  12. In this case, circulating fluidized bed boiler has become the first new technology of high efficiency and low pollution. this paper simply introduce the clean combustion of circulating fluidized bed boiler and explore the sulfur capture, nitrogen capture, dust capture, slag excluding and using by connecting with the practically case of bt - 75 / 4. 2 - m circulating fluidized bed boiler in yth group

    本文對循環流化床鍋爐潔凈燃燒在理論上做了簡要論述,並結合雲天化股份公司bt - 75 4 . 2 - m型循環流化床鍋爐實際運行情況,對循環流化床鍋爐燃燒過程中脫硫、脫氮,煙氣除塵、灰渣的排放和利用等情況進行了探討。
  13. Anyhow the slagging is formed in the combustion process, the slagging is closely related to and cannot be separated from the process of combustion. here the paper is composed of two sections. the first part concerning the improvement of numerical modeling to the combustion process, the other section is to build the mathematical modeling of fuzzy comprehensive judgment of slagging and to predicate the distribution of slagging on the heated surface on the basis of numerical modeling and by utilizing theory of fuzzy mathematics

    但歸根結底,結是在燃燒過程中形成灰渣的形成和沉積與燃料燃燒過程密不可分,因而本論文由兩大部分組成,一部分為改進和完善燃燒過程數值模擬,另一部分是在燃燒過程模擬基礎上,利用模糊數學理論,建立結綜合模糊評判數學模型,預報受熱面上結分佈情況。
  14. Beginning with the coal ash ingredients and the process of slagging, this paper analyses the effects of the following factors on slagging such as the mineraling redients in coal, the characteristics of boiler design and the operation conditions, and then puts forward the relative preventing measures

    摘要從煤成份及結過程入手,分析煤中礦物質成分、鍋爐設計特性及運行工況對結影響,從而提出相應防止措施。
  15. Standard specification for ground granulated blast - furnace slag for use in concrete and mortars

    混凝土和漿用磨碎粒狀高爐礦標準規范
  16. When they mix each other, in one rate, they can compensate it ' s defect and improve the compability. 5 ) in the concrete with slag or fly ash, the changing of addition has more affection in slag ' s concrete than fly ash

    5 )摻礦和粉煤混凝土,外加劑摻量變化對摻加礦混凝土中水泥與外加劑相容性影響大於摻加粉煤混凝土中水泥與外加劑相容性。
  17. Abstract : sewage sludge briquette made of 2 % ( dry basis ) sewage sludge, 0. 3 % white earth, and coal powder was studied under conditions of briquette similar to modeling and gasificaition for briquette on ammonia synthesis. briguette with white earth was taken as a reference. the results showed that rate of gasification of sewage sludge briquette was 50 % higher than that of briquette of white earth at 1100. ash melting point of sewage sludge briquette reached 1440 which satisfied the requirement of gasification of ammonia synthesis. results showed that no pollution took place in these processes, and the gas generated can meet the demand of ammonia synthesis

    文摘:以污泥添加量為2 % (干基)白泥添加量為0 . 3 % (干基)所制得污泥型煤為研究對象,以白泥添加量為5 . 5 %白泥型煤作為參照,考察了污泥型煤氣化特性和二次污染.研究結果表明,在1100以上高溫下,污泥型煤氣化速率比白泥型煤高50 %以上;污泥型煤軟化溫度達1440 ,能滿足合成氨氣化要求;污泥型煤無二次污染,其氣化成分符合合成氨原料氣要求
  18. Sludge disposal system availability range from c13 superscript bin discharging sludge dewatering mouth, until dry sludge provide material, burning, smoke and ash emissions purification of the entire output of mechanical equipment, process pipelines, electrical equipment, instrument control system and civil engineering, including the whole project within the scope of the design, construction, manufacture, installation, and trial run and test run after the normal operation of the after - sales service

    污泥處置系統供貨范圍從c13標脫水污泥料倉出料口開始,直到干化污泥出料、焚燒、煙氣凈化排放和輸出為止整套機械設備、工藝管道、電氣設備、儀控系統和土建工程,包括整個工程范圍內設計、施工、製造、安裝調試、試運行及正常運行后售後服務。
  19. The modeling considers not only the characteristics of fuel ( including ash composition and melting point ), but also takes into account of the influence of operational conditions ( gas velocity, atmosphere, temperature ) on slagging to avoid the unilateralism of other methods of judgment to the slagging

    模型中既考慮了燃料特性(包括成分和熔點) 、也考慮了運行條件(空氣動力場、氣氛、溫度)對結影響,克服了其它結診斷方法片面性。
  20. The main ingredient in concrete, cement is made by heating limestone and clay until they fuse into a material called clinker, which is then ground up and mixed with various additives

    混凝土中主要成分水泥生產是通過加熱熔解石石和粘土,生成一種名為溶物質,然後再對溶進行碾磨,並加入各種添加劑加以混合。
分享友人