焊后檢驗 的英文怎麼說

中文拼音 [hànhòujiǎnyàn]
焊后檢驗 英文
post-soldering inspection
  • : 動詞(用熔化的金屬修補金屬器物或使金屬工件連接起來) weld; solder
  • : Ⅰ動詞1 (查) check up; inspect; examine 2 (約束; 檢點) restrain oneself; be careful in one s c...
  • : 動詞1. (察看; 查考) examine; check; test 2. (產生預期的效果) prove effective; produce the expected result
  • 檢驗 : checkout; test; examine; inspect; verify; survey; check;checking;testing;[英國]jerque(指檢查船舶...
  1. It is drawn seamless tubing, which can be welded to join the tubes of the bike frame together. the tubes are cold worked to provide additional strength to the material, and through this process is tailored to provide the correct shape tubing for the frame design

    由ti 3al2 . 5v製成的鈦合金車架採用無縫管材的接技術,其管材經冷軋成形經過嚴格地挑選,以保證其材料的強度和質量。
  2. According to these, the paper put forward some countermeasures : select low carbon steel or low metal alloy steel with lower intensity, like 20r steel ; while welding, adopt strict craft measures with lower welding heat to input ; after jointing, proceed the whole hot dissolving on time ; control each welding joint with hardness hb 185 ; add 0. 25 % water into the liquid ammonia as decay eclipse ; enhance checking in operation, repairing equipment in time through regular interior and exterior checking

    針對上述原因提出了防止氨冷器類臨氨壓力容器產生應力腐蝕裂紋的對策:選用強度稍低,但抗裂性較好的低碳鋼和低合金鋼,如用20r鋼製造;接時應採用嚴格的工藝措施和較低的接熱輸入量;應及時進行整體消除應力熱處理;控制接接頭各區硬度hb 185 ;在液氨中添加0 . 25 %的水作為緩蝕劑;在運行中加強查,及時進行停車修時的內外部查和定期
  3. Before apply the test, all the welding work of block or section should be finish and accepted by view inspection

    當片體、分段組立裝配接完工後,經縫外觀查合格,就可進行角縫密性試
  4. The result of emulational experiment shows that the algorithms are effective. the algorithm solves the problems of too much training and the low precision of bp network applied in solder joints inspection

    模擬實證了改進的演算法是有效的,並解決了將bp網路應用於基於結構式光源的錫量類型點質量測中時訓練次數較多和網路精度不高的問題。
  5. ( 3 ) the weld of pe pipe ca n ' t be proof - test by undestroyed probing. pe pipe must be welded by auto fusion equipment and reduce the man - made factor to the minimum at the same time. the operator must be well skilled and highly responsible, who performs upon weld quality control regulations, and check up the weld strictly after fusion

    ( 3 )聚乙烯管道連介面由於不能象鋼管口那樣通過無損測手段來證是否合格,所以一定要使用自動化程度高的連接機具,將人為因素降到最低,並要求工除了熟練的操作技術外還應具備高度責任心,嚴格執行連接施工工藝質量控制要點和有關操作要領,接完採取必要的收手段。
  6. Inspection and preventation control of plate undee distortion after welding

    板材波浪變形的及預防控制
分享友人