焊縫連接 的英文怎麼說

中文拼音 [hànféngliánjiē]
焊縫連接 英文
welding connection
  • : 動詞(用熔化的金屬修補金屬器物或使金屬工件連接起來) weld; solder
  • : 縫名詞1. (接合處) seam 2. (縫隙) crack; crevice; fissure; slit
  • : Ⅰ動詞1 (連接) link; join; connect 2 (連累) involve (in trouble); implicate 3 [方言] (縫) ...
  • : Ⅰ動詞1 (靠近;接觸) come into contact with; come close to 2 (連接; 使連接) connect; join; put ...
  • 連接 : connect; fit together; link; marry; mate; joint; association trail; linkage; concatenate; concate...
  1. High quality stainless pipe valve and seamless welded joint can ensure absolutely air conurbation and durability of pipe system

    高品質不銹鋼的管道閥門,無介面,以保證絕對的氣體密閉性和管道系統的耐用性。
  2. In addition to, the fatigue crack between web and upper flange of welded steel crane beam on heavy duty service was discussed, and based on long - term observation and research, the author classified fatigue crack into bearing type and middle type crack along the horizontal direction. the causation, distributive law and mechanism of the crack were analyzed, and the precautions to take and the measures to remedy crack were presented. the main defacts including damage, crack, erosion and aging in structures, especially in concrete structure were introduced ; the defact mechanism was analyzed and the precautions to take were also given

    另外,作者對重級工作制鋼吊車梁腹板與上翼緣的縱向水平疲勞裂進行了長期的觀察和研究,根據疲勞裂產生的不同機理,將其分為支點裂和肋間裂,並討論了兩類裂產生的原因、分佈規律、機理以及防治的措施;對工程中經常遇到的結構構件,尤其混凝土構件的幾種主要病害(損傷、裂、腐蝕與老化)進行了機理分析並提出了防治措施。
  3. The calculation results indicate that the outboard of drum walls fall in plastic yielding at the same time the rising cooling water reaches the height of that point and the yield region becomes narrower and narrower when it comes closer to the circumferential strake weldments, which explains the reason coke drums experience bulging and cracks occur in the weld seams portions of shell to shell after long in service

    計算結果表明:塔壁外側在冷卻水面到達的瞬間進入塑性屈服,筒節中部塑性屈服區較大,當靠近時塔壁的塑性變形區逐漸縮小直至消失,塔壁塑性屈服區的分佈特點解釋了塔體長期使用后發生鼓凸變形及簡體與焊縫連接處產生裂紋的原因。
  4. To avoid manual labor of chiseling - grossness, in the area of second - stage concrete construction, permanently non - removed metal molding boards nets are used as molding boards of first - stage concrete. substitution joints of reinforcing steel bars for traditional electric welding and usage of equipments for joints of reinforcing steel bars efficiently improve strength of junctions and rate of connecting reinforcing steel bars, and safety of construction and stability of quality, and greatly reduce cost. it ' s possible that three gorges project become top - ranking project in the world by study on systems engineering of high - strength concrete construction

    混凝土面處理採用高壓水流沖毛技術,大大提高了施工工效,減少了倉面污染;模板工程大量採用定型鋼模板施工技術,提高了壩體混凝土成型質量和工程進度;在二期混凝土施工區域,為免除人工鑿毛勞動強度,採用永久性免拆金屬模板網作為一期混凝土模板;鋼筋改進傳統的電方式,採用大量採用鋼筋頭機械技術,有效提高了頭強度和鋼筋速度,施工安全性大大加強,質量穩定性有效提高,經濟成本大大降低;三峽二期工程持續高強度混凝土施工系統工程的研究,使三峽工程成為名符其實的「世界一流工程」成為可能;三峽二期工程混凝土溫控綜合技術的應用,有效降低了壩體混凝土溫度的產生;混凝土表面處理及裂處理技術的應用,提高了建築物的整體性和耐久性。
  5. It is proved that the connection and steel frame with beam flange dog - bone reduced have superior behavior to the frame of conventional design and the brittle failure is avoided in the steel frame. and conditions of stress development in the dog - bone, and the reason of the brittle failure in the rigid connections is obtained

    了解了狗骨處應力發展狀況;探討了剛性發生脆性破壞的原因;並強調指出樑柱質量,對能否發揮狗骨式削弱的作用,達到預期的設計目的是至關重要的,必須予以重視。
  6. And it investigates the appearance condition ( including joint, crack, eroding, corrosion, braking pole device rupture, crane - girder ' s gnawing railway and so on ) of the whole crane - girder system on the spot, at the same time, it also actually examines the stress of the beam, chemical ingredient, distortion and railway excursion, etc. through sampling, and based on the actually examined results, it checks and calculates the carrying capacity of crane - girder system. then, based on the investigating on the spot and the calculated result, it discusses the mechanism of fatigue failure of the upper part of welded steel crane - girder, analyses the reason of steel crane - girder in the high - frequency emerging the fatigue crack, institutes the strengthened method of damaged steel crane - girder of accurate packing up workshop of the primary mill plant. finally, it presents some advice and suggestions for the repairing and strengthening method of fatigue crack of upper part of steel crane - girder in the high - frequency

    針對包鋼初軋廠精整車間鋼吊車樑上部區域出現裂這一問題,本文首先綜述了國內外關于鋼吊車樑上部區域疲勞裂的研究現狀;其次對整個吊車梁系統的外觀情況(包括、裂、腐蝕、銹蝕、制動桿件斷裂、吊車啃軌等)進行了現場調查,抽樣實測了梁的應力、化學成分、變形及軌道偏移等,根據實測結果,對吊車梁系統的承載能力進行了驗算;然後,根據現場調查及計算結果,探討了鋼吊車樑上部區域疲勞破壞的機理,分析了重級工作制鋼吊車梁出現疲勞裂的原因,制定了初軋廠精整車間破損鋼吊車梁的加固方案;最後就重級工作制鋼吊車樑上部區域出現疲勞裂的修復與加固方案提出了一些意見和建議。
  7. Results showed that the ductility of bolt spjice is much better than welds, weaker splice joints develop larger plastic deformation, slipping between faying surfaces, bearing of bolts to hole surfaces and buckling of splicing plates are all ideal energy dissipation mechanism

    試驗結果表明:螺栓拼節點的延性遠好於樑柱焊縫連接;較弱的拼節點產生較大的塑性變形;觸面的滑移、螺栓與孔壁的擠壓和翼緣拼板的屈曲都具有良好的耗能能力。
  8. But the welding program is complicated and the construction is very difficult so that the welding deformation and welding quality should be seriously controlled

    轉子中心體與支臂採用工地組施工,可使轉子支架整體性能好,能夠保證轉子組裝質量,但程序復雜、施工難度大,必須嚴格控制變形和質量。
  9. Cold - formed rectangular tube - steel column for architecture structure is formed by roll cold - winding forming process and hf longitudinal seam weld

    建築結構用冷彎矩形鋼管是採用冷軋或熱軋鋼帶,經續輥式冷彎及高頻直生產形成的矩形鋼管。
  10. The second crack is a crack originating at the groove weld toe of the column flange-girder flange connection.

    第二種是產生於立柱翼緣與主梁翼緣處的坡口趾處的裂紋。
  11. Cracks that have developed in the web at lateral connection plates have generally occurred because of intersecting welds.

    腹板在水平板處出現裂紋,通常是由於有交叉
  12. All welds shall be full penetration and continuous unless otherwise specified on the drawing

    除非圖上另外標明,所有均為續全
  13. The commonly used methods of connections, especially the high - strength bolted connection and welding with bolting mixed connections are discussed in more detail. the analysis for the problems, such as partial penetrated butt weld and welding deformation is also discussed in the paper

    對工程中採用較多如高強度螺栓、栓-混合等作了較深入分析;對工程中容易出現問題如不透的對計算方法及可能出現的變形及處理等問題也作了較深入探討。
  14. According to the engineering experiences obtained from the laying of a jointless track of high - speed communication line - line 3 in dalian city, this paper introduces in general the laying technology, particularly the long rail welding, the construction site welding, seamless track spreading and trak controller laying, and discusses problems often occuring in long rail wedling and seamless track laying

    摘要根據大市快速軌道交通3號線一次性鋪設碎石道床無線路的工程實踐,介紹了長鋼軌基地、單元軌節的工地;無線路鎖定和鋼軌伸縮調節器的鋪設等技術,並對長鋼軌和無線路鋪設中應注意的問題進行了探討。
  15. All gas line joints shall be orbital welded except those connecting to valves

    所有氣體管路的採用無
  16. For all gas lines, all joints shall be orbital welded to minimize pressure fittings

    所有氣體管路的為無
  17. Preliminary study on tube clip weld rupture of boiler heating surface

    鍋爐受熱面管定位開裂原因初探
  18. Theuse of permanent backing bars in highly stressed welds in hullstructures is to be avoided as far as possible

    例2 :船體結構中,凡承受高應力的,應盡量避免採用固定墊板
  19. The benchmark data for theoretical analysis are obtained by calculation results of finite element models. in order to have a sound finite element model, the plastic quadrilateral shell elements model established in 1996 by bahaari and sherbourne is improved by using solid 8 nodes elements in ansys programs

    為了使理論分析有充分而且精確的基本數據,本文改進了bahaari和sherbourne提出的四邊形塑性殼單元有限元模型,建立了能夠考慮、摩擦力和預應力等因素影響的端板節點的三維實體單元有限元模型。
  20. In this paper, the general situation and virtue or disadvantage about light - steel structure abroad and at home is concluded systematically. the design method, steel characteristic in the connection, the bolt strength, welding line characteristic and the joint connection model about gabled frames structure is introduced

    本文系統地歸納了國內外輕鋼結構的發展概況及其優缺點,介紹了輕鋼結構門式剛架節點的設計方法、節點鋼材的性質、螺栓的強度、的特性以及的形式。
分享友人