焚燒系統 的英文怎麼說

中文拼音 [fénshāotǒng]
焚燒系統 英文
incineration system
  • : burn
  • : Ⅰ動詞1 (使東西著火) burn 2 (加熱或接觸某些化學藥品、放射性物質等使物體起變化) cook; bake; hea...
  • : 系動詞(打結; 扣) tie; fasten; do up; button up
  • : Ⅰ名詞1 (事物間連續的關系) interconnected system 2 (衣服等的筒狀部分) any tube shaped part of ...
  • 焚燒 : burn; set on fire
  • 系統 : 1. (按一定關系組成的同類事物) system 2. (有條理的;有系統的) systematic
  1. Local contacts identified urgent technology needs in the areas of hazardous waste incineration, hospital wastewater disinfection, brownfield remediation, and environmental protection systems for ports and harbors

    此外,當地的環保機構認為中國在有害固廢的處理,醫療廢棄物的消毒凈化處理,整治紅土,港口和碼頭的環保方面的技術非常匱乏。
  2. Using a system based on a cast iron melting furnace, we have established technology for vitrifying waste such as incinerated ash, casing ash, etc

    採用以鑄鐵熔爐為原型的,確立了后灰燼,鑄鐵沙粒等廢棄物的熔融固化技術。
  3. Combined with debugging expirence in the field, the control system of incinerator, including the stocker control system, primary air control system, secondary air control system etc., used in nanshan municipal solid waste ( msw ) incineration power plant has been presented

    摘要結合現場調試經驗,介紹了深圳市南山垃圾發電廠爐控制,包括爐排控制、一次風控制、二次風控制等。
  4. The scientific trash - burning system was introduced in detail and designed

    鑒於此,文章對科學垃圾設計作了比較詳細的介紹。
  5. Analysis on the flue gas purification system of the urban garbage incineration

    城市垃圾煙氣凈化的分析
  6. Cfb system is mainly composed of a sludge drying unit, three sets of fluidized bed sludge incineration flue gas purification equipment and a device component

    主要由一套流化床污泥干化裝置、三套流化床污泥裝置和一套煙氣凈化裝置組成。
  7. Application of kingview ' s configuration software and s7 - 300 plc in the medical treatment garbage incineration system

    和組態王軟體在醫療廢棄物焚燒系統的應用
  8. At last the thesis gives out the application of the design frame on hazardous waste combustion disposal system

    並以杭州某危險廢物焚燒系統為背景,給出了過程實時的工程應用。
  9. For the characteristics of various wastes from chemical industry, the feasibility to use rotary - kiln incinerator is discussed and determined, the design thought for the burning system and the calculating method for important equipment are introduced, and then are validated in practice

    摘要針對化工行業中多種類工業廢棄物的特點,確定採用回轉窯式爐的可行性,給出了焚燒系統的設計思路以及重要設備的計算方法,並在實際中加以驗證。
  10. Abstract : in the internal circulating fluidized bed, there exist the moving zone, fluidizing zone and heat transferring zone with different fluidized air velocities. the convection heat transfer coefficient of immersed tube in the heat transferring zone is impacted by the velocity of the moving zone nearby and its data and change trend are obviously different with those of the common bubbling bed. the maximum heat transfer coefficient is evidently higher than that of the bubbling bed. as the bed materials have not been fluidized in the heat transfer zone, the coefficient has increased highly. the curve of that changes gently, feasilble to control the combustion intensity in the fluidizing zone

    文摘:垃圾焚燒系統中,內旋流流化床存在不同布風速度的移動區、流動區和換熱區,處于換熱區的埋管的對流換熱數受附近流動區氣流參數的影響,其變化趨勢及數值大小與普通鼓泡型流化床之間有明顯不同:最大的對流換熱數明顯高於鼓泡床;換熱區尚未流化時,對流換熱數已經大幅提高;整條換熱曲線的變化比較平緩,易於流化床濃相床內換熱。
  11. This, dissertation, which is based on the project named " the system of hazardous waste, burning disposal ", researches the technologies of process modeling and advanced control theory

    本論文以浙江省科技計劃重點項目「危險廢物處置」為依託,針對危險廢物過程中的過程建模和先進控制等問題進行了研究。
  12. The commissioning scheme and implementation of sludge drying and incineration system of shanghai shidongkou wastewater treatment plant were introduced ; they are mainly the prior period preparation, commissioning method of main system, and coordinative management

    摘要介紹了上海市石洞口城市污水處理廠污泥乾化處置的調試方案和實施過程,主要包括前期準備工作、主要的調試方法及協調管理工作等。
  13. Sludge disposal system availability range from c13 superscript bin discharging sludge dewatering mouth, until dry sludge provide material, burning, smoke and ash emissions purification of the entire output of mechanical equipment, process pipelines, electrical equipment, instrument control system and civil engineering, including the whole project within the scope of the design, construction, manufacture, installation, and trial run and test run after the normal operation of the after - sales service

    污泥處置供貨范圍從c13標脫水污泥料倉出料口開始,直到干化污泥出料、、煙氣凈化排放和灰渣輸出為止的整套機械設備、工藝管道、電氣設備、儀控和土建工程,包括整個工程范圍內的設計、施工、製造、安裝調試、試運行及正常運行后的售後服務。
  14. 2 on. the based of field data, the two objects, burner to temperature, blower and draught - fanner, to oxygen content and inner negative pressure, have been built model by the method of system identification

    2 、在現場數據的基礎上,針對危險廢物過程中的兩個重點對象環節:燃室溫度控制、煙氣氧含量與爐膛負壓控制,採用辨識的方法建立了過程對象模型。
  15. Abstract : the generation and control of odorous gases in treating night soil sludge was exploited in this paper. the results indicated that high concentration odorous gases can be generated during whole process in treating night soil sludge. in order to control the secondary pollution of odorous gases, the authors put forward a new kind of deodorization process - combustion in methane boiler and absorbde in washer

    文摘:對糞渣污泥處理處置過程中惡臭氣體的產生及控制進行了研究,結果表明,在綜合處理全過程的幾個主要階段都會產生高濃度的惡臭氣體,為防止惡臭氣體對環境造成的二次污染,提出採用沼氣鍋爐和洗滌塔相結合的除臭工藝,洗滌塔除臭只有在啟動、調試和沼氣鍋爐發生故障的情況下使用。
  16. The province - level hazardous waste management and information exchange centre, safety landfill centre, incineration centre and province - level early - warning system of hazardous waste pollution incidents should be established

    建立全省危險廢物管理與登記交換中心,建設省級危險廢物安全填埋處置中心、危險廢物中心、省級危險廢物污染事故預警
  17. Slashing and burning ( incidentally, no agricultural system is closer to being " traditional " ) destroys our ancient forests

    伐木和(順便說,沒有什麼農業更接近於「傳的」 )毀滅了我們的原始森林。
  18. This paper is subject to national emphasized groundwork research item about the disposal of the city waste using incineration, and it focuses on the research of the monitoring and controlling system of the multilayer circulation fluidized bed boiler which is used in hangzhou qiaosi power plant, while considering an utilizing advanced technology and experience domestically and abroad

    本課題從屬于國家重點基礎研究規劃項目垃圾發電處理的集成課題,結合國家計委環保示範項目杭州喬司垃圾電廠的實際情況,借鑒國內外的先進技術和經驗,對杭州喬司異重循環流化床垃圾電廠的計算機監控的開發進行了深入的研究。
  19. The comprising equipment and control system of dual garbage furnace were introduced, and the madjustment during its installation was recounted

    摘要介紹了二段式垃圾爐的設備組成和控制,並敘述了其安裝過程中的調整情況。
  20. The monitoring and controlling system adopts a total distributed control system ( dcs ) constituted by a programmable logic controller ( plc ), a computer ( pc ) and thermal power engineering signal sensors, sender, controller, etc. plc is used to collect data and perform automatic control mostly, while pc is adopted to monitor the operation process, analyze, display and store data

    本項研究中採用可編程式控制制器( plc )作下位機、工業控制計算機( pc )作上位機與熱工參數測量傳感器、變送器、操作控制器等組成集散型控制( dcs ) ,上位機和下位機自動監測垃圾鍋爐的各運行參數,並對異重循環流化床垃圾鍋爐實行自動控制與調節。
分享友人