無徑流和水系 的英文怎麼說

中文拼音 [jìngliúshuǐ]
無徑流和水系 英文
areism
  • : 無Ⅰ動詞(沒有) not have; there is not; be without Ⅱ名詞1 (沒有) nothing; nil 2 (姓氏) a surn...
  • : Ⅰ名詞1 (狹窄的道路; 小路) footpath; path; track 2 (達到目的的方法) way; means 3 (直徑的簡稱...
  • : Ⅰ動1 (液體移動; 流動) flow 2 (移動不定) drift; move; wander 3 (流傳; 傳播) spread 4 (向壞...
  • : 和動詞(在粉狀物中加液體攪拌或揉弄使有黏性) mix (powder) with water, etc. : 和點兒灰泥 prepare some plaster
  • : 名詞1 (由兩個氫原子和一個氧原子結合而成的液體) water 2 (河流) river 3 (指江、河、湖、海、洋...
  • : 系動詞(打結; 扣) tie; fasten; do up; button up
  • 水系 : river system; hydrographic net; drainage; basin
  1. The non - irrigation plantation in moving sand dune and sandy girder areas should adopt some biological and engineering measures such as runoff - collecting to improve effects of rainfall, reduce losses by evaporation and depth leaking, and improving circulation and transformation of water in sandy plantation ecology system by reasonable allocation

    灌溉條件的動沙丘沙梁地,通過匯集利用,充分實現降雨的有效化,利用各種生物工程措施來減少植被統的效蒸發散損失深層滲漏,通過合理配置提高資源的循環與轉化是沙區發展免灌植被的主要途
  2. Annual precipitation series about 50 years is stable and no period ; further, the climate drying and desertification are n ' t caused directly by the decrease of precipitation during the period of the research according to the relational analysis among precipitation temporal - spatial change, runoff, evaporation, potential evapotranspiration and soil water ; longyangxia reservoir which was built in 1986 does n ' t have influence on precipitation up to now ; but annual temperature series in gonghe is unstable, having a linear upward trend, and it increases about 0. 0247, 0. 0422 and 0. 0272c per year, and temperature rise must be having an influence on desertification, but there is a very little temperature change, so that the effect is very small ; annual potential evapotranspiration series is stable too, so climate change has little influence on plant water consumption. 2

    在青海共盆地,近50年的年降雨量序列是平穩的、周期,其時空變化與、蒸發、潛在蒸散土壤分的關表明,氣候乾燥嚴重的荒漠化不是由於降雨量減少直接引起,龍羊峽庫對共盆地年降雨量變化沒有影響;但是年氣溫序列是非平穩的,茶卡、恰卜恰貴南的年氣溫平均每年升高0 . 0247 、 0 . 04220 . 0272 ,且氣溫升高2 ,年潛在蒸散增加57mm ,盆地內氣候逐漸變乾燥,但影響比較小;由於歷年潛在蒸散序列是平穩的,因此氣候變化對盆地的作物潛在蒸散的影響在研究期內是較小的。
  3. Complicated hydrologic and geographic conditions, and the large scale of the xiaolangdi hydraulic project on the yellow river are introduced briefly. three desilting tunnels are designed to meet the requirements of flood control, sediment discharge and runoff regulation. according to the performance requirements of desilting tunnels, the tunnel lining down - stream of the grouting curtain is designed to be post - tensional prestressed lining. on the basis of investigation and research, experiements and analysis, the unbonded prestressing system is used. it is the largest unbonded prestressed tunnel lining project in the world, and the first one in china

    簡介黃河小浪底利樞紐復雜的文、地質條件以及龐大的工程規模.該樞紐設計有3條排沙洞,擔負著泄洪、排沙、調節保證進口不被泥沙淤堵的任務.根據排沙洞的庫運用要求,灌漿帷幕下游排沙洞洞身段設計為混凝土后張預應力隧洞.通過大量的調研、試驗、分析論證,在施工前確定該預應力方案選用粘結預應力統,成為目前世界上規模最大的粘結預應力隧洞襯砌工程,在國內尚屬首例
分享友人