無限元法 的英文怎麼說

中文拼音 [xiànyuán]
無限元法 英文
infinite element method
  • : 無Ⅰ動詞(沒有) not have; there is not; be without Ⅱ名詞1 (沒有) nothing; nil 2 (姓氏) a surn...
  • : Ⅰ名詞(指定的范圍; 限度) limit; bounds Ⅱ動詞(指定范圍, 不許超過) set a limit; limit; restrict
  • : Ⅰ名詞1 (由國家制定或認可的行為規則的總稱) law 2 (方法; 方式) way; method; mode; means 3 (標...
  • 無限 : infinite; limitless; boundless; immeasurable; unlimited
  1. This thesis also introduces some kinds of the jointing of cable and membrane strucfores. an open - air palestra has been designed in this thesis. the force density method has been used to analyze the shape, and the nonlinear finite method has been used to analysis the loads

    最後,本文還採用文中推導的離散方,通過力密度對某風雨操場進行形態分析,並通過將找形結果用非線性有荷載狀態下計算結構的應力,結果表明本文推導的方找形精度是足夠高的。
  2. This article would analyze the two method farther in the background theory and calculate kinds of the examples of the pure unbraced frames with the effect of initial defect. at one time the same instances were analyzed by the finite element numeric method, which results were compared with the res ults of the three methods. the conclusions from the comparison would offer the references to the revision of the code

    本文對這兩種方進行深入的研究,考慮部分初始缺陷的影響,對各種支撐純框架實例進行了大量計算分析,並採用有進行對應分析作參考,對三種方的計算結果進行比較,得出結論,以期對規范的修訂提供依據。
  3. 4. from the point of view of inverse problems in mechanics, two trains of thought for solving ics / ibs computative problems, i. e : by means of intelligence computation method without geometrical modeling and by the aid of finite element inverse analysis method with geometrical modelingare expounded. by comparing these two methods, a feasible, integrated and modularized solution

    從力學反問題的角度出發,闡述了智能橋梁結構的智能計算問題的兩種西南交通大學博士研究生學位論文第n頁思路一一模型力學反問題的計算智能解決思路以及有模型力學反問題的有解訣思路。
  4. Besides, the gauss interpolation function and the domain of support which includes much more nodal information than finite element method does is used to make meshless method much more earlier solve the large deformation and distortion and describe the local characteristic ( such as stress locality et al. ) more facilely

    並由於在網格中採用了高次插值函數和包含有較多節點的支持域(在有中的支持域只包含單節點) ,從而使得網格能方便地處理變形畸變和應力應變局部化等問題。
  5. Applications of the finite - cover element - free method in friction contact problems of tension - weak geomaterials

    覆蓋在巖土類弱拉型材料摩擦接觸問題中的應用
  6. By the use of finite element analytic way the modality analysis has been carried out on this model and the inherent frequency and of the sley sword, sley and reed was found

    用有分析梭織機筘座組合體的動態性能,求出了筘座組合體的固有頻率。
  7. This paper analyses the engineering feasibility of using the static fem in the fatigue strength design of the shipunloaders structure through discussing the difference of infinite fatigue life design and finite fatigue life design and puts forward the calculating work cycle of this structure after considering the shipunloaders work process. it is useful for crane design - engineer to introduce the general fatigue strength design processes of the shipunloaders

    分析了有壽命疲勞設計和疲勞壽命設計的異同,研究了用靜力學的有進行結構的疲勞強度設計的技術可行性問題;並結合裝卸橋的工作過程,提出了相應的計算工作循環;介紹了裝卸橋疲勞設計的一般步驟
  8. ( 1 ) systematic triaxial compression tests are made for the sand reinforced by various national geosynthetics. comprehensive investigations into the interaction characteristics are also made between sand / lime fly ash and various national geosynthetics by direct shear tests and pull out tests, which can help choosing geosynthetic type and understanding the geosynthetic reinforcement mechanism ; ( 2 ) this paper is also firstly systematically presents the results of a comprehensive investigation into the interaction characteristics between lime fly ash and various national geosynthetics ; ( 3 ) by non - linear fem, the influence of the modulus of geosynthetics, the thickness of the soft ground and the width of the foundation on the effectiveness of geosynthetic reinforcement are also studied ; ( 4 ) the main conclusions are as followed : ( geotextiles are likely to be suited for projects allowing high displacement, polyester warp knitting geogrids and oriented geogrids for projects allowing medium displacement, glass fiber geogrids for projects allowing low displacement and geonets for secondary projects. ( the confining effect of fill material to act on different kinds of geosynthetics varies largely, which must be considered

    ( 1 )本文利用三軸壓縮試驗,比較各種國產土工合成材料對砂土的加筋效果;利用直剪試驗和拉拔試驗,比較各種國產土工合成材料與砂土或石灰粉煤灰的界面摩擦特性,深入研究土工合成材料的加筋機理,首次明確提出加筋土工合成材料的選型原則; ( 2 )本文首次系統地研究了石灰粉煤灰與各種國產土工合成材料的界面摩擦特性; ( 3 )本文採用有,系統研究了加筋模量、軟土地基厚度、基礎寬度等因素對土工合成材料加固軟土地基效果的影響; ( 4 )本文主要結論如下: (紡土工織物適合用於允許大變形的加筋土工程;滌綸纖維經編土工格柵和塑料拉伸土工格柵適合用於對變形有較嚴格要求的加筋土工程;玻璃纖維經編土工格柵適合用於對變形有嚴格要求的加筋工程;土工網適合用於低等級的加筋土工程。
  9. Associated with a project of the planned xuefengshan tunnel with 7. 6 km long during the construction of shaoyang to huaihua expressway in hunan province of shanghai to ruili national trunk highway, this paper firstly makes an introduction of the frequently - used analysis & computation methods for tunnel supporting structure. then, based on the analysis of the basic theory about the interaction mechanism of surrounding rock and support structure, a spatial computation model is made, a coupling numerical computation method with 3 - d elastic - plastic finite element and infinite element is proposed, and a comprehensive analysis has been made to the effects of the overall stability and safety of the surrounding rocks of different characteristics, different classes and under different construction methods. and thus the problem of 3 - d infinite region to which applying the general finite ca n ' t do has been resolved

    6公里的雪峰山隧道工程,首先介紹了隧道支護結構的常用分析計算方;然後通過對隧道施工過程中,洞室穩定性與支護結構相互作用機理的深入分析,建立了隧道施工過程的空間計算模型,提出了採用三維彈塑性有-耦合的數值計算方,綜合分析了隧道在不同圍巖特性和圍巖類別條件下,以及不同施工開挖方案等對隧道圍巖整體穩定和安全性的影響,從而解決了通用有難以解決的隧道三維域問題;其可充分發揮有在分析非線性方面的有效性和成熟性,以及無限元法在分析處理域和半域方面的精確性和簡便性,為隧道施工過程中圍巖的穩定性分析開辟了一條新的途徑。
  10. In this paper, based on the analysis of the rlem of theory foundation, computing method, preference, applicability, etc, we anatomized the rlem of three self - deficiencies and six scarcities. moreover, we adopted the parallel ways of contrasting the rlem with the fem and applied it to analyzing the impact of slide block of elasticity and plasticity, slip surface of coefficient and slip bed of elasticity, plasticity upon the stability of slope and in the plain linearity slope, the plain refracted line slope and the plain arc slope. in addition, we discussed the warp of between the lem of ( sarma, janbu, order, bishop, morgenstera - price, etc ) and the fem of result and the distributing of positive stress and shear stress on the slip surface

    本文從剖析剛體極平衡的理論基礎、計算方、參數選取、適用條件等方面入手,剖析了剛體極平衡方的3點自身缺陷和6點不足,並在此基礎上採用了剛體極平衡(平面滑動破壞、 sarma、傳遞系數、普遍條分、 janbu、 bishop、 morgenstern - price)與大型有對比研究的方,分析研究了平面直線型滑坡、平面折線型滑坡、平面圓弧型滑坡在漸進破壞中邊坡的滑體彈塑性參數、滑麵塑性參數) 、滑床的彈塑性、以及極平衡考慮開挖應力釋放等因素對邊坡穩定性的影響與滑動面上的正應力、剪應力分佈規律、安全系數的解答的差異。
  11. In the simulation and analysis on culvert construction, the method of foundation - pit excavation layer by layer and step by step was used, i. e. the method that makes the surface of excavation have no stress, when the elements were excavated gradually in period of construction. at this process, the state of soil is unloading, the laws of stress field and displacement field with the depth of excavation were studied. based on the obtained stress field and displacement field after the excavation was completed, by using of the newly increased filling - elements " gravity and the grinding force, the simulation of the construction of body of the culvert and foundation - pit ' s filling layer by layer had also been done in this dissertation

    用有模擬分析涵洞基坑開挖時,採用分層、分步模擬開挖過程的方,即將計算域內單分層「挖去」 ,使開挖表面成為應力表面的方,分析土體在卸載狀態時的應力場和位移場隨開挖深度的變化規律;在洞體施工后,回填土體時,據開挖完成時的應力場、位移場,通過逐級增加計算域內的單數目,施加每級新增加單的自重荷載,利用有模擬基坑及上覆土體分層填築的施工過程,這不僅反映土體處于再加載應力狀態時,填土受力及變形的一般規律,而且這種將地基? ?涵洞? ?土體作為一個統一整體進行模擬的方,量化了三者之間的相互作用關系。
  12. This paper studies nonlinear dynamic problems of tall building structures, first, constitutes linear dynamic equation and elasto - plastic dynamic equation of structure by using qr method, later, solves the dynamic equation by using spline unconditional stable algorithm, last, programs corresponding computer programs with c program language, and calculates some example and a tall building in constructing the courses and the results prove that qr method is not only simple in calculating and fast in constringency rate, but also precise, that qr method is a effective and economic new method

    本文研究高層建築結構彈塑性動力問題,先利用qr建立了結構線性動力方程及彈塑性動力方程,然後利用樣條條件穩定演算求解了動力方程,最後利用c語言編寫了相應的計算程序,計算了一些例題和分析了一個工程實例。 qr在理論上及方上不用有及流動則,避免了這些傳統方在分析非線性問題時所帶來巨大困難的缺陷。計算結果表明,這種方不僅計算簡便,而且精度高,收斂速度快,是一種經濟有效的新方
  13. The solution of the interior problem has been obtained by the fem method. ensuring the continuity of the tangential electric field across the aperture plane, the electromagnetic e and h has been gained

    分別採用有和矩量分析封閉腔體和半空間的電磁場,在孔徑面上進行邊界條件匹配,從而得出極化雙工柵中的電磁場特性。
  14. Firstly, the paper introduces the principle of instituting contact interface element and the format of integral method for element stiffness matrix ; secondly, because of the zero of displacement and load of soil in the infinite boundary, the unique shape of element stiffness matrix is obtained for coupling the three different elements

    文中首先闡述了接觸建立的方以及單剛度矩陣的積分方;由於遠處的土場位移、地震作用力皆為零,計算中對該單剛度矩陣的形式不同於四節點等參,文中推導了平行的單剛度拒陣方,並介紹了剛度矩陣組裝原理。
  15. Infinite element method ; interface problem ; singularity

    內邊界問題奇性
  16. The effect of complex groundsill and dam body ' s construction process can be considered conveniently when finite element method is used to analyze dam body ' s stress. but there is no design criterion correspondingly because of the stress concentration that is caused by load at dam heel and dam toe under elastic state. furthermore, its value is easily affected by mesh size

    分析拱壩壩體應力可以較方便地考慮復雜地基條件和壩體施工過程的影響,但是由於彈性狀態下拱壩壩踵、壩趾處受荷載后的應力集中現象,而且其數值受網格尺寸影響較大,因此至今與之相應的設計準則。
  17. Based on analysis of the characteristics of the composite soil nailed wall, simulating the soil nail, concrete layer, deep mixing pile and step excavation, a model is established to calculate the deformation of the wall, compiled simple and applied program of one dimension fem ; according to the field test data and the calculated data by the fem software this paper has developed, the design method and deformation of the wall in xi ' an area is discussed. the shape of destructive sliding surface of the wall in loess strata in xi ' an area with deep groundwater is gotten. finally the lateral deformation distribution and the experiential formula to predict maximal horizontal displacement of the composite soil nailed wall are given

    針對復合土釘墻構造的特點,建立了模擬復合土釘墻受力變形的一種計算模型,該計算模型可對土釘、面層、深層攪拌樁以及分層開挖等進行簡化模擬;編寫了簡單實用的桿系有程序;結合工程實測資料及有分析的結果,探討了西安地區的土釘設計以及復合土釘墻的變形規律,得出了西安地區一般黃土在地下水時的破壞滑動面形狀,復合土釘墻的側向變形曲線以及計算復合土釘墻最大水平位移的經驗公式。
  18. Applications of the finite - cover element - free method in numerical analyses of crack - expansion

    覆蓋在裂紋擴展數值分析問題中的應用
  19. 2. finite and infinite element coupling method applied in the paper can not only reflect the scattering phenomenon of waves, but also lessen the amount of calculation. it has significant advantage compared with pure finite element method

    L本文的有耦合分析方,不僅可以較好地反映波在域介質中的能量彌散現象,同時大大減小了計算量,與單純的有相比,具有顯著的優越性。
  20. Infinite element method

    無限元法
分享友人