煤氣管網 的英文怎麼說

中文拼音 [méiguǎnwǎng]
煤氣管網 英文
gaspipe network
  • : 名詞(黑色固體礦物) coal
  • : Ⅰ名詞1 (氣體) gas 2 (空氣) air 3 (氣息) breath 4 (自然界冷熱陰晴等現象) weather 5 (氣味...
  • : Ⅰ名詞1 (管子) pipe; tube 2 (吹奏的樂器) wind musical instrument 3 (形狀似管的電器件) valve;...
  • : Ⅰ名詞1 (捕魚捉鳥的器具) net 2 (像網的東西) thing which looks like a net 3 (像網一樣的組織或...
  • 煤氣 : coal gas; gas
  • 管網 : pipe network管網技術管理 pipe network technical management
  1. Chapter n analyzes the present urban gas civil use in wisco, and points out that the major problems are miscalculation of fluctuating needs of users, rigid maximum production, excess reserve, and redundant pipe net transport. all these lead to the conclusion that urban gas which transcends the users needs has increased purification and transport cost

    第二章,分析了武鋼民用輸配系統的現狀,對用戶動態需求估計不準,按照最大能力組織生產,儲備能力過剩,輸送能力富餘;指出了現行生產工藝中存在的問題,超出用戶需求的增加了凈化成本和輸送成本。
  2. Taking the tokyo gao company as example, we introduced the real time shockproof system of high, medium and low pressure gas pipeline and some other systems, such as earthquake automatical blocking up system, earthquake warning system, radio remote monitoring and operation system, remote gas leak monitoring system

    以東京公司為例,論述了高、中、低壓煤氣管網的地震實時防災系統?感震自動隔斷系統、地震警報系統、無線電遠程監視與操作系統、遠程泄漏監測系統。
  3. We use drilling hole detection, excavation eye - measurement and geological analysis technique to survey the pipe network

    本文論述了鉆孔探測法、開挖目測法及地質分析法對埋地煤氣管網進行全面的普查。
  4. It also proposes the solution of virtual code and realizes clients / server database, and indicates that this software can be used for development of telemetry software for, urban water supply network and gas networks

    該軟體對于城市供水煤氣管網等分散型的監測軟體的編制有一定的參考價值。
  5. Since the gas pipeline of handan has operated for many years, a lot of problems have appeared such as corrosion damage, anticorrosive coating aging metamorphism and gas leakage

    摘要邯鄲市煤氣管網經過20多年的運行已進入了事故多發期,出現了腐蝕漏、防腐層老化變質等問題,因此必須對全市煤氣管網進行全面的腐蝕情況普查和安全性分析。
  6. With an aim to arouse public awareness on the protection of underground utilities ( gas, water, drains, power, telecom, etc ) and work safety in road excavation, a series of open competitions will be jointly organized by hong kong institute of utility surveyors ( hkius ), the hong kong the hong kong association for the advancement of science and technology ( hkaast ), and utilityinfo institute ( uti )

    為提高大眾市民保護地下設施(、水、水渠、電纜、視訊等)及道路安全的認知,香港線測量師學會、香港工程師學會安全工程專責事務委員會、香港科技協進會及香港工程路資料理中心現正聯辦一系列地下線相關之大型公開比賽。
  7. This proof following enterprise already through the authentication, and has set up a file in the dongguan 114 nets industry and commerce enterprise database, inquires the more detailed enterprise material, please dial the dongguan enterprise information desk 96060 ( artificially ) 9686810114 billion ( to be automatic ), this enterprise numbers for 16688

    茲證明東莞市工程公司已通過認證,並已在東莞114工商企業數據庫中備案,查詢更詳細的企業資料,請撥東莞企業查詢臺96060 (人工) 9686810114 (自動) ,該企業編號為16688 。
  8. This proof following enterprise already through the authentication, and has set up a file in the dongguan 114 nets industry and commerce enterprise database, inquires the more detailed enterprise material, please dial the dongguan enterprise information desk 96060 ( artificially ) 9686810114 billion ( to be automatic ), this enterprise numbers for 16687

    茲證明東莞安泰安裝工程有限公司已通過認證,並已在東莞114工商企業數據庫中備案,查詢更詳細的企業資料,請撥東莞企業查詢臺96060 (人工) 9686810114 (自動) ,該企業編號為16687 。
  9. The mains network extends throughout hong kong via a 108 - kilometre high - pressure pipeline and some 2209 kilometres of distribution mains

    的供應路遍布全港,各區的由一條長108公里的高壓道以及總長約2209公里的分配主喉輸送。
  10. The gas is supplied through an integrated distribution system to about 1. 23 million customers. the mains network extends throughout hong kong via a 108 - kilometre high - pressure pipeline and some

    的供應路遍布全港,各區的由一條長108公里的高壓道以及總長約
  11. T he land area planned for nanxiang high - tech park is 12000 mu. today, its infrastructure construction has been completed. water, gas and poewer supply, drainage system, and telecommunication network have all been installed. roads have been constructed and opened to traffic. around the park there are 7 banks, 6 supermarkets, 8 colleges and schools

    南翔園區總體規劃土地面積約12000畝, 「七通一平」基礎設施一步到位:給水道接通、雨水排放疏通、污水納入市政道聯通、電力系統、電信路順通、 「四縱四橫」道路平坦暢通。
  12. On a similar basis, we also monitor and regulate the natural gas facilities at black point and castle peak power stations, as well as the towngas production plants, storage systems and transmission and distribution network throughout hong kong

    其他類似的活動還包括監察及規位於青衣發電廠龍鼓灘的天然設施、生產設施、儲存系統及全港各傳送和銷售路的運作。
  13. Foundation construction issued by the ministry of construction, p. r. china. our operation includes research development, sales, installation. construction and after - sales service for air conditioner and ventilation engineering, together with its relevant facilities etc. electro - mechanic is one independent party from dasheng, we have one exellent heating ventilation engineers team and many professional installing building teams

    在軟體開發方面主要從事地理信息系統和圖文辦公自動化方面的基礎平臺與應用系統開發,並以城市地下信息系統見長,是國內率先從事該領域軟體開發的公司之一,尤其是在自來水通信交通以及城市綜合行業佔有優勢。
  14. Cooling, heating, ground cold geothermal heat domestic hot water, swimming pool heating, and long distance control, holiday and party fuctions. introduction for air - to - water heat pump system

    :為燃公司的設計維護和理提供專業化的理系統。
分享友人