煤滑板 的英文怎麼說
中文拼音 [méigǔbǎn]
煤滑板
英文
coal board slide-
Research results show that different conformation mode of tectonite roof result in the difference of preservation condition of gas, intense pressing process of structural stress in the front of gliding structure result in mine gas outburst, and control on no. 2 gas source in tectonite roof is the best means by which the gas problem can be perfectly solved in gliding structure area
研究結果表明:由於滑動構造區煤層頂板不同的結構類型,導致礦井瓦斯保存條件的差異;滑動構造前緣擠壓帶內強烈的擠壓應力作用是本區瓦斯突出的根本原因;控制采空區頂板的二次瓦斯源是治理滑動構造區瓦斯地質災害的根本之策。Because the upper rocks are influenced after the mining lower coal, they glide along the primary bursting surface, and the upper rock layers can form surface - contact fabric by its shear and bulge function
作者認為,下煤層開采後上覆頂板巖層受到二次擾動,其破壞移動主要是沿原有破裂面滑移,由於剪脹的作用,上覆巖層能夠形成面接觸的覆巖基本結構特徵。Exploitation on roof management at blast - winning caving face under slide structure
滑動構造下炮采放頂煤工作面頂板管理的探討Abstract : the shaft well of the xiezhuang coal mine has been designed of a poured - in - place reinfcrced concret box structure. sliding and pouring method, an alternate procedure for the construction of a coal mine shaft well project, the procedures are as following : 1, the progress of each storey " s construction has been carried out step by step duly 2, the construction of slabs and 3, during construction, the light - type network structure has been used as a complementary operating platform for the sliding formwork construction. these synchronization procedures have achieved comprehensive economic benefit and social efficiency
文摘:協莊礦副立井井塔為現澆鋼筋混凝土箱形結構,採用滑一澆一工藝進行煤礦井塔施工,施工順序為塔壁逐層滑升,梁板逐層跟進,施工中利用井塔屋面輕型網架結構作為滑模輔助操作平臺,同步滑升,取得了較好的綜合經濟效益和社會效益。The shaft well of the xiezhuang coal mine has been designed of a poured - in - place reinfcrced concret box structure. sliding and pouring method, an alternate procedure for the construction of a coal mine shaft well project, the procedures are as following : 1, the progress of each storeys construction has been carried out step by step duly 2, the construction of slabs and 3, during construction, the light - type network structure has been used as a complementary operating platform for the sliding formwork construction. these synchronization procedures have achieved comprehensive economic benefit and social efficiency
協莊礦副立井井塔為現澆鋼筋混凝土箱形結構,採用滑一澆一工藝進行煤礦井塔施工,施工順序為塔壁逐層滑升,梁板逐層跟進,施工中利用井塔屋面輕型網架結構作為滑模輔助操作平臺,同步滑升,取得了較好的綜合經濟效益和社會效益。分享友人