燃氣機組 的英文怎麼說

中文拼音 [rán]
燃氣機組 英文
gas-fired generating unit
  • : 動詞1. (燃燒) burn 2. (引火點著) ignite; light
  • : Ⅰ名詞1 (氣體) gas 2 (空氣) air 3 (氣息) breath 4 (自然界冷熱陰晴等現象) weather 5 (氣味...
  • : machineengine
  • : Ⅰ名詞1 (由不多的人員組成的單位) group 2 (姓氏) a surname Ⅱ動詞(組織) organize; form Ⅲ量詞(...
  • 燃氣 : gas燃氣發電廠 gas power plant; 燃氣鍋爐 gas fired-boiler
  • 機組 : 1 [工業] (一組機器) set; assembling unit; machine set; plant unit; team; unit assembly 2 (飛機...
  1. The nozzle flow is composed of the main gas stream and the secondary air stream in order to simulate the nozzle of turbofan engine

    噴管中的流由主流和次流空成,用以模擬渦扇發動的噴管。
  2. Development research on gas engine driven heat pump

    熱泵的研製與實驗研究
  3. Gas turbines - procurement - part 6 : combined cycles

    .采辦.第6部分:合循環
  4. Experimental studies on s1a - 02 gas turbine with water injection into compressor interstage / inlet as well as that on turbocharger self - loop test rig with inlet water injection are introduced. test results are in good accordance with simulation results, wet compression can lower compression work and increase engine power output so engine performance is enhanced, if engine power output is not changed, efficiencies of compressor and this engine become higher and turbine inlet temperature and fuel consumption become lower and if keeping t4 the same as that before wet compression is used, efficiencies become furthermore higher and engine power output increases greatly

    實驗結果和計算結果同樣表明:濕壓縮減少了壓所消耗的壓縮功,增加了的輸出功率,提高了性能,如果保持發動輸出功率恆定,濕壓縮可以提高壓和整個的效率,與此同時,渦輪進口溫度t _ 3 ~ *和油消耗率下降;如果保持渦輪排溫度t _ 4 ~ *恆定,壓效率進一步提高,輸出功率增加。
  5. Fore peak tank, fresh water tank, ballast tank, fuel oil tank, void tank, auxiliary engine daily service tank, steering gear tank, emergency generator fuel oil tank, sewage treatment equipment all has air pipe and air pipe head

    3艏尖艙、淡水艙、壓載艙、油艙、空艙、輔日用油櫃、舵艙、應急發電油櫃、生活污水處理裝置及均設空管及空管頭。
  6. Now, this paper is a trial of this aspect. this paper introduces the reequipped design of the engine of s195, and the design of equipment of model coal - bed gas

    本文針對比較有應用前景的代用料煤層的特點,改裝設計了一臺用變分煤層發動
  7. After a nationwide restructuring of colleges and departments in 1952, the department was renamed as the department of machine manufacturing, comprising 5 disciplines manufacturing technology, foundry technology and equipment, forging and pressing technology end equipment, welding technology and equipment, and etall. graphy and heat treatmento in addition, on the basis of the original power machinery teaching group, the department of power machinery was set up, having 3 disciplines : thermal electr

    1952年院系調整,更名為械製造系,設械製造工藝鑄造工藝及設備壓力加工工藝及設備焊接工藝及設備金相熱處理5個專業,並且由原動力擴建成立了動力械繫,正式設有熱力發電后改為鍋爐汽車拖拉3個專業。
  8. Analysis of operation performance of gas heat pump cool - hot water unit

    熱泵式冷熱水運行特性分析
  9. Especially the generation unit consisted of high - speed generator and micro turbine without a gear box can largely reduce the system volume and increase the efficiency

    尤其是高速發電直接相連成發電,中間不帶減速構,可大大降低系統體積,提高系統效率。
  10. Thermal power performance diagnose of single - shaft arrangement gtcc

    單軸聯合循環熱力性能試驗的診斷
  11. Setw speaks on watermain burst, the mtrc incident and hats stage 2

    龍鼓灘發電廠的6臺燃氣機組分別5 、 90和5毫克。
  12. An introduction is made on calculating the explosion limitation of the purely organic burning gas and the mixture made of many organic burning gases by using oxygen coefficient, also it systematizes the old formulas in common use, and simplifies the calculation, at the same time, it offers the speed calculation for the explosion limitation of complicated organic burning gas, whose result is fit for the practice

    摘要提出一種利用氧系數計算純凈有體和由多種有成的混合體爆炸極限的計算方法,對目前常用的經驗公式進行了整合與修正,簡化了對混合體爆炸極限的計算,也提供了對復雜成的混合有體爆炸極限的快速估算,估算結果與實測值能較好吻合。
  13. So a reforming design scheme of the cogeneration of heat and power project is put forward to change fuel from natural gas into coal in the basis of using original equipment

    目前,受海上能源供應限制,供量明顯不足,致使孤北熱電廠燃氣機組閑置,從油田實際出發,以孤北熱電廠現存設備為設計依據,將原改為煤熱電聯產形式。
  14. Experiment of performance characteristics of a compression heat pump unit driven by a gas engine

    風冷驅動壓縮式熱泵冷熱水運行特性試驗研究
  15. Hon emily lau raised a question on maximize the use of gas - fired units for generating electricity

    劉慧卿議員就盡量使用燃氣機組發電提出質詢。
  16. Of the 120gw of new power orders, 20 - 30 per cent were for gas - powered plants while 30 - 40 per cent were for coal - fuelled generators

    在120千兆瓦的新發電設備定單中, 20 %至30 %為燃氣機組,而30 %至40 %為煤發電
  17. The world is on the brink of a big switch from gas to coal as the preferred fuel for power stations, according to projections from alstom, siemens and general electric, the world ' s three biggest power equipment makers

    《金融時報》得到的來自法國企業阿爾斯通和德國企業西門子的獨立預測顯示,未來10年內,將有40 %的發電定單為,而燃氣機組所佔比例將降至25 %至30 % 。
  18. Independent forecasts from france ' s alstom and germany ' s siemens, made available to the financial times, show that about 40 per cent of the orders for electricity turbines in the next decade will be for coal - powered units, with the share of gas - fired plants falling to between 25 and 30 per cent

    《金融時報》得到的來自法國企業阿爾斯通和德國企業西門子的獨立預測顯示,未來10年內,將有40 %的發電定單為,而燃氣機組所佔比例將降至25 %至30 % 。
  19. This paper gives an example that is a project about repowering 2 50mw coal - fired plant as combined cycle. it is found out that after full firing repowering, the absolute efficiency gain is 4. 62 % and after feed water heating repowering, the absolute efficiency gain is 2. 78 %

    本文結合2 50mw改造為聯合循環的方案實例,計算出排型聯合循環系統更新改造使原絕對效率提高了4 . 62 % ,給水加熱型聯合循環系統更新改造使原絕對效率提高了2 . 78 % 。
  20. Whether they have set up a mechanism whereby, when the supply of natural gas is stable in the future, the clp will be restricted in the use of coal - fired units which have higher emission levels of air pollutants in generating power ; if not, of the reasons for that

    有沒有設立制,日後當天然供應充足時,限制中電使用空污染物排放量較高的發電若沒有,原因為何?
分享友人