燃煤 的英文怎麼說

中文拼音 [ránméi]
燃煤 英文
fire coal燃煤發電廠 coal-fired power plant; 燃煤鍋爐 coal fired boiler; 燃煤加熱爐 coal-fired furnace
  • : 動詞1. (燃燒) burn 2. (引火點著) ignite; light
  • : 名詞(黑色固體礦物) coal
  1. Power plants that burn coal add greatly to air pollution.

    燃煤的發電廠大大地加重了空氣的污染程度。
  2. Energy efficiency fund in jointly efforts of unido, alton fund and netherlands government 5. distributing cooling, heating and power combined supply system

    提高常規發電廠效率技術:研究超聲波乳化油節油技術以及燃煤發電廠汽輪機余熱蒸汽中熱能回收技術等。
  3. Expression of mt - 1 and mt - 2 genes in blood cells in coal - burning arsenism

    2基因在燃煤型砷中毒患者中的表達
  4. The protective effects of sod - enriched cili juice on oxidative damage in arsenism patients caused by burning coal

    刺梨汁對燃煤型砷中毒脂質過氧化損害的拮抗作用
  5. Thus, measuring carbon content of fly ash can help to know boiler burning state

    因此,檢測燃煤鍋爐的飛灰含碳量可以直接了解鍋爐的燒狀態。
  6. Low combustion efficiency and serious pollution problems come with the behindhand facilities and technology of coal combustion

    由於燃煤設備和燒技術相對落後,因而帶來了燒效率不高和環境污染嚴重兩大問題。
  7. October 9, 2007 - yokogawa electric corporation announces that yokogawa india limited has received a contract from national thermal power corporation ltd. ( ntpc ), india ' s largest power utility, to supply automation and control system for a new supercritical coal fired power plant project in bihar state

    10月8日消息? ?橫河電機公司宣布橫河印度公司獲得了印度最大電力公司(印度)國家火力發電有限公司( ntpc )的合同,為比哈爾邦一個新的超臨界燃煤電廠項目提供自動化和控制系統。
  8. Tests and analyses performed by experts and technical personnels show that, the brown coal used by hongwei power plant is extremly prone to produce reside in the process of power generation. this paper discusses the problem of burning residue in the coal fired boiler 410t / h of hongwei heat & power plant

    本文對宏偉熱電廠410t / h燃煤鍋爐的灰特性等進行了試驗分析,試驗結果表明,宏偉熱電廠用的褐是一種有嚴重結渣傾向的,運行中極容易結渣。
  9. As burning oil burning coal burning large scale car bottom heat treatment furnace

    燃煤大型臺車爐
  10. This effort would involve decarbonizing 36 gigawatts of new coal generating capacity by 2020 ( corresponding to 7 percent of the new coal capacity expected to be built worldwide during the decade beginning in 2011 under business - as - usual conditions )

    所需的努力包括在2020年之前,新增的燃煤電力中,有360億瓦是不排放碳的( 360億瓦相當于在一切如常的狀況下, 2011年起10年間全世界新增燃煤電力的7 % ) 。
  11. One must be careful not to double - count the possibilities ; the same coal plant can be left unbuilt only once

    我們必須謹慎小心,不要重復計算這些可能性;因為少建的燃煤發電廠,只能計算一次。
  12. When an electric utility builds a 1, 000 - megawatt coal plant designed to trap co2, it needs to have somewhere to stash securely the six million tons of the gas the facility will generate every year for its entire life

    電力機構興建一座100萬? 、具備二氧化碳收集能力的燃煤電廠時,就必須找地方安頓它每年將製造的600萬噸二氧化碳。
  13. Absent revenues from sales to oil field operators, applying ccs to new coal plants using current technology would be the least - cost path only if the cost of emitting co2 were at least $ 25 to $ 30 per metric ton

    如果沒有販售二氧化碳給油田的利潤,對採用現有技術的新設燃煤電廠而言,唯有當排放二氧化碳的成本為每公噸至少25 ~ 30美元時,採行ccs才會是最低成本的一步。
  14. She got out her curling irons and lighted the gas and went to work repairing the ravages made by generosity added to love

    她拿出她的卷發用的鐵卷子,點燃煤氣,開始補救由於愛情加上慷慨而造成的破壞。
  15. We worked hard to prevent and control water pollution in key river valleys and regions, such as the three gorges reservoir area, the songhua river, the sources and routes of the south - to - north water diversion project, and the bohai sea. we carried out key environmental protection projects to desulphurize emissions from coal - fired power plants, treat urban sewage and dispose of waste safely

    積極推進重點行業重點企業和重點工程的節能工作,開展循環經濟試點,加強三峽庫區松花江南水北調水源及沿線渤海等重點流域和區域水污染防治工作,實施燃煤電廠脫硫城市污水處理垃圾無害化處理等環保重點工程。
  16. Unvented kerosene - fired room heaters and portable heaters

    無通風裝置燃煤油房間加熱器和便攜式加熱器
  17. This thesis establishes the main factor of heating surface slagging of no. 1 boiler, that it is due to irrational layout of furnace heating surface, improper angle of burner which lead to flames attaching to furnace walls. such deduction is built on the basis of necessity of analyzing the heating surface slagging, the type of coal, the design of the furnace and burner, the operational condition and other factors effecting slagging of boiler. the research is mingled with practical operations of no. 1 boiler in inner mongolia fengtai electric power generation co, ltd

    本論文從分析燃煤鍋爐結渣問題必要性出發,從種、爐膛及燒器設計、運行工況等因素對鍋爐結渣的影響著手,結合內蒙古豐泰發電有限公司~ # 1鍋爐實際運行中存在的問題,確定了~ # 1爐受熱而結渣的主要原因是爐膛受熱面布置不合理,燒器角度不合適導致火焰貼壁所致。
  18. Tight scale is usually a problem encountered in forgings hardened from direct - fired gas furnaces having high - pressure burners

    用高壓爐頭直燃煤氣爐對鍛件進行淬火時,通常會出現鱗片問題。
  19. Put a match to the gas jet to light the gas

    把火柴放在氣爐嘴上來點燃煤氣。
  20. The four departments generation set of 360 mw power plant from french alstom by huaneng luohuang power plant, its steam machine control system, including steam machine regulation and steam machine protection system are designed by french gec - alstom dem company

    華能珞璜電廠四臺360mw燃煤發電機組系由法國alstom全套引進,其汽機控制系統,包括汽機調節、汽機保護系統均由法國gec - alstomdem公司開發設計。
分享友人