燒結車間 的英文怎麼說

中文拼音 [shāojiējiān]
燒結車間 英文
sinter plant
  • : Ⅰ動詞1 (使東西著火) burn 2 (加熱或接觸某些化學藥品、放射性物質等使物體起變化) cook; bake; hea...
  • : 結動詞(長出果實或種子) bear (fruit); form (seed)
  • : 車名詞1. (中國象棋棋子的一種) chariot, one of the pieces in chinese chess2. (國際象棋棋子的一種) castle; rook
  • : 間Ⅰ名詞1 (中間) between; among 2 (一定的空間或時間里) with a definite time or space 3 (一間...
  • 車間 : farm; shop; workshop; department
  1. The laboratory group leader shall assign a person to clear recycling samples that are judged as cancelled or out of the storage life ; recycling piece samples shall be returned to the sintering procedure, demagnetized, and then after completion, reported for inspection according to the regular program ; any waste samples shall be sent to the keeper of the waste warehouse of the production workshop, and relevant delivery procedures need be handled by filling in the " form for disposal of samples "

    判定為報廢的和超出保留期限的回用品由實驗室組長安排人員對樣品進行清理,回用的塊狀樣品退回給工序,進行退磁處理,完成後按正常程序重新報檢,廢品交送生產廢品庫管理人員,辦理交接手續需填寫「樣品處置單」 。
  2. Analysis of experimental data indicates that there exist several following problems during the whole operation : first, the emission is serious and the density of hc and co smoke is very high at on and off period. second, there is oil dripping from the dripping vitta as a result of the fault of ignition system and combustion structure. the last, there might be accidents of disabled ignition resulted from the improper operation at the beginning

    通過對樣機的試驗分析和研究表明,汽空氣燃油加熱器在整個工作過程中,其排放存在以下三個問題:一、開機和關機兩個階段的排放問題嚴重,廢氣中hc和co的濃度值及煙度測量值都很高;二、因點火系統和燃構的缺陷而導致開機后一段時內有油滴從滴油管滴落;三、在點火過程中,會出現因操作不當而點火失效的現象。
  3. The capacity of the agglomerating plant can be increased

    燒結車間的能力會有所增加。
  4. Present status of technology used in no. 2 dressing shop of donganshan sinter plant and suggestions for technological improvoment

    東鞍山廠二選工藝現狀分析及改進建議
  5. Study on secondary classification with cyclone in concentration workshop of donganshan sintering plant

    用旋流器進行東鞍山廠浮選二段分級的研究
  6. Study on technological process to raise concentrate ' s iron content and reduce its silicon content in donganshan sineter plant

    東鞍山廠一選提鐵降硅工藝流程研究及建議
  7. Cleaning the sample judge as scrap and recycle which exceed save limit time by lab leader, recycle block sample return to sintering process for demagnetization, re - inspection according to normal process after complete, the scrap deliver to production warehouse supervisor handing and fill in “ sample disposal form ”

    判定為報廢的和超出保留期限的回用品由實驗室組長安排人員對樣品進行清理,回用的塊狀樣品退回給工序,進行退磁處理,完成後按正常程序重新報檢,廢品交送生產廢品庫管理人員,辦理交接手續需填寫「樣品處置單」 。
  8. Abstract : based on analyzing the fault mechanism for fire - loss bush of the main bearing in nd2 diesel engine, the paper firstly presents the relations between exciting source of vibration and fire - loss bush fault ; then introduces experiments on vibration detection and diagnosis of the engine ; finally, the results show that the condition of fault for the main bearing can bediagnosed through detceting the vibration of engine base surface

    文摘:在對nd2機柴油機滑動主軸承瓦故障機理分析的基礎上,闡述了柴油機的振動激勵源及特徵量與瓦故障之的關系,並介紹了柴油機的振動監測與診斷的試驗研究,試驗果表明:利用機座外表面的振動特性的變化可以診斷出機柴油機主軸承的故障狀態。
  9. Abstract : in one sintering plant, its no. 1 wagon tipper ' s track sur face occurred corrosive pitting and stacking only after short application, and th is effect the normal production seriously. in order to diagnose the plastic defor mation of the track surface, we made test and fem analysis to it, found the re ason of failure, and put out improving measure

    文摘:某廠1號翻機在使用較短時后,導軌表面出現點蝕和堆邊現象,嚴重影響正常生產.針對這一問題,對導軌表面塑性變形進行了實測和有限元分析,從而找出了故障原因並提出了改進措施
  10. The author tells the strategy in no. 3 workshop sinter plant wisco on the base of his practice

    本文作者依據本人在武鋼工作的實際經驗,介紹了武鋼廠三實施戰略管理的內容與實施計劃等。
  11. This thesis comes from a practical industry task named " the system of on - line monitoring on the chief axis of single - roller crusher in the no. 2 workshop of sinter factory , wuhan iron and steel group corporation.

    =本論文來源於工業實際課題,課題名稱為「武鋼廠二單輥破碎機主軸扭矩在線監測系統」 。