爆破電路 的英文怎麼說

中文拼音 [bàodiàn]
爆破電路 英文
firing circuit
  • : 動詞1. (猛然破裂或迸出) explode; burst 2. (放在滾油里快炒) quick-fry
  • : Ⅰ動詞1 (完整的東西受到損傷) be broken; be damaged 2 (使損壞) break; break down; damage 3 (使...
  • : Ⅰ名詞1 (有電荷存在和電荷變化的現象) electricity 2 (電報) telegram; cable Ⅱ動詞1 (觸電) give...
  • : 1 (道路) road; way; path 2 (路程) journey; distance 3 (途徑; 門路) way; means 4 (條理) se...
  • 爆破 : blow up; blast; burst; demolish (by explosives); detonate; explode; dynamite
  • 電路 : [訊] circuit (ckt); electric circuit; electrocircuit電路板 circuit board; 電路保持 guard of a c...
  1. Zhejiang 8 amounting to tunnel engineering limited company is alley of well of bridge of road surface of channel of pilot a ship into a harbour of water and electricity of volume road tunnel, railroad channel, irrigation works, roadbed, mine, large cubic metro of earth and stone blow up the professional construction company that construction is an organic whole, have channel highway project to always contract two class aptitude

    浙江八達隧道工程有限公司是集公隧道、鐵隧道、水利水引水隧道、面橋梁、礦山井巷、大型土石方施工為一體的專業施工企業,擁有隧道公工程總承包貳級資質。
  2. Based on the engineering practice of the side slope excavation of dayanchi section within the road for the construction traffic of guandi hydropower station, the problems such as the selection of blasthole distance for presplit blasting, and the rock ridge, the levelness of the presplit face, lower hole - making rate of the auxiliary blastholes after the presplit blasting, the blasting network for prespliting and blasting zone and the angle change of the presplit hole etc. are analyzed ; for which the specific solutions are put forward herein as well

    摘要通過官地水站對外交通公大鹽池合同段邊坡開挖中預裂的工程實踐,對預裂的孔距選擇及下部嚴重出現巖坎、預裂面平整度、預裂后輔助孔成孔率低、預裂與以及預裂孔角度變化等問題進行分析,提出了具體的解決方法。
  3. The application of the new deep - hole blasting technique in electrized speed increasing modification works of zhegan railway

    深孔新技術在浙贛鐵化提速改造工程中的應用
  4. This paper introduce the test and application situation of some new techniques in the stone roadbed blasting of the seventh bidding section of the electrized speed increasing modification works of zhegan railway such as adding the flexible cushion on the hole - bed, making the smooth blasting, making the large - area multi - row short - delay loose blasting, and making the single - hole one - by - one blasting network, etc

    介紹了浙贛鐵化提速改造工程第七標段石方中,孔底加設柔性墊層、光面(預裂)、大區多排微差松動、單孔逐個起等新技術的試驗和運用情況。
分享友人