爐結焦 的英文怎麼說

中文拼音 [jiējiāo]
爐結焦 英文
furnace coking
  • : 結動詞(長出果實或種子) bear (fruit); form (seed)
  • : Ⅰ形容詞1 (物體受熱失去水分 呈現黃黑色並發硬、發脆) burnt; scorched; charred 2 (著急) worried;...
  1. In recent years at iron - making plant of pangang, the coke ratio of pig iron has reduced evidently by insisting on “ burden preparation ” course, improving quality of sinter, raising wind temperature, increasing rich oxygen quantity and injecting abundant pulverized coal into bf. the solid fuel consumption of sinter has been decreased greatly through insisting on using high - quality calces, practising high feed sintering, actualizing many techniques in solving key problems. at the same time, the energy source base management has been strengthened, and energy - saving work has made great progress, profits generated by energy - saving have exceeded a hundred million yuan

    近年煉鐵廠通過堅持「精料」方針,改善燒礦質量,提高風溫,增大富氧,實施大噴煤,使入比有明顯下降;燒堅持用好生石灰,推行厚料層燒,實施多項技術攻關,固體燃耗大幅度下降;同時加強能源基礎管理,節能工作取得長足進步,節能創效益1億元以上。
  2. Moreover, the system of powdered coal conveying with primary air is the most important tache, whether the distribution of primary air is even or not directly relates to whether the distribution of powdered coal is even or not in all firing implement and nozzles, sequentially directly relates to whether it is hard to take fire, whether the fire is stable, whether there is coking and how about the heat efficiency of the boiler, hi addition, if there is jamming and deflagrate in the system of powdered coal conveying with primary air, severe safety accident can be resulted

    良好的煤粉配風是建立合理的內空氣動力工況和穩定燃燒的必要條件。而其中一次熱風送粉系統又是最重要的一個環節,一次風配風是否均勻直接關繫到煤粉在各燃燒器和各噴嘴中的分佈是否均勻,從而直接關繫到著火是否困難、火焰是否穩定、局部是否以及鍋的熱效率高低。若一次風送粉系統發生堵塞和煤粉爆燃則可能引發嚴重的安全事故。
  3. The experience in building large - volume coke oven is summed up in terms of quality management of refractory, building of coke oven body, door, gas offtake pipe, fire bed as well as problems relevant to the building of coke oven body

    摘要從耐火材料的質量管理、本體的砌築、門、上升管、火床的砌築及與本體砌築相關問題等方面總砌築的經驗。
  4. A non - profit association of the leading mining, production and fabrication companies in the global pgms industry. information on platinum, palladium, rhodium, iridium, ruthenium, and osmium

    -擁有化燒煉鐵轉煉鋼電煉鋼連續軋鋼高速線材小型軋材熱力發電等主體生產廠。
  5. The experimentation of cool and hot diagnosis reflected the structure and disposal of combustor, slag bonding and smirch of hearth are the main factors of hearth ' s outlet overheat and output of boiler decline

    冷、熱態診斷試驗反映出、粘污及燃燒器的構和布置等因素是造成膛出口煙溫偏高,鍋出力下降的主要因素。
  6. This article aims at the boiler ' s problems in operation : 1 ) under nominal load, the smoke temperature at the outlet of hearth reaches 1200, far more exceeds 1050 the original designed temperature. this will always result in slag inside boiler and the temperature of overheater ' s pipe superheat, so that boiler cannot take nominal load and all these influence boiler ' s nomal operation heavily, 2 ) this article also studied the reason why the assistant oil becoming necessary when coal changes. during the nomal operation, many factors ( makeup of combustor and its disposal, smirch and encrust of water wall, excessive air coefficient, temperature of primary air, coal type and density of coal dust ) can deviate the designed working conditions, then affect the boiler ' s nomal operation

    本文針對該鍋在實際運行中存在的問題:在額定負荷下,膛出口超溫、低溫段過熱器前煙溫高達936 ,遠遠超過815的設計值;噴燃器四周水冷壁嚴重,過熱器管壁溫度超標,無法帶上額定負荷;甚至有時因燃煤質量的變化,必須投油助燃的嚴重情況進行了分析研究。在實際生產過程中,燃燒器的構、布置,水冷壁的粘污、垢,過剩空氣系數、一次風溫、煤種及其濃度變化等許多因素都會偏離鍋的設計工況,從而影響內的傳熱和燃燒,造成膛出口超溫、水冷壁渣等問題。
  7. Abstract : coke saving measures in the recent , years at pangang are summarized according to various ways of beneficiated materials , high blast temperature , oxygen - enriched blast , pulverized coal injection rate and improvement of blast furnace operation , the effect of related smelting factors on coke rate is investigated in combination with the production data and moreover further measures for reduction of coke rate are proposed

    文摘:從精料、風溫、富氧和噴煤量以及改善高操作等方面總了攀鋼近幾年來採取的節措施,並合生產數據分析了有關冶煉因素對比的影響,同時提出了進一步降低比的措施。
  8. It shows that with a metallization degree of burden more than 40 per cent, blast furnace can t be operated with oxygen enriched blast. combining lower burden metallization degree with oxygen enriched blast and coal injection, higher coal injection rate and higher productivity can be obtained. by use of higher burden metallization degree lower coke rate can be obtained than oxygen enriched blast and coal injection

    果表明:料金屬化率達到40后,高不能富氧操作;較低的料金屬化率與富氧噴煤相合,能夠獲得更大的噴煤比和更高的產量;使用金屬化率較高的料,能夠比富氧噴煤達到更低的比。
  9. Abstract : according to material and local heat balance in the blast furnace, refering to the result of oxygen enriched blast and coal injection into blast furnace and use of metallized burden, the influence of burden metallization degree on oxygen enriched - coal injection rate 、 coke rate and productivity is calculated

    文摘:根據高物料平衡和區域熱平衡理論,參照高富氧噴煤和使用金屬化料的冶煉果,計算了料金屬化率對富氧噴煤率、比和產量的影響。
  10. How to prevent boiler from coking

    廣州珠江電廠鍋爐結焦原因分析及防止措施
  11. Producer of high purity metals and chemicals used in electronics, fiber optics, and semiconductors. products include germanium, germanium tetrachloride, germanium oxide, arsenic, antimony, copper, cadmium and tellurium

    -擁有轉和電鋼兩個生產系統,包括礦山采選燒化煉鐵煉鋼連鑄軋材以及相應的動力運輸機械建築安裝等。
  12. Treatment and analysis on return valve clinkering of cfb

    循環流化床鍋回料閥分析與處理
  13. The edc cracking reaction rate is higher in the wall zone and reaches a maximum at 0. 3 of dimensionless length of reactor coil

    表明確定最優的管管徑時必須考慮提高裂解速率與降低速率之間的平衡。
  14. Hot sinter, cold sinter, coke, limestone, blast furnace slag

    熱燒礦冷燒炭石灰石高
  15. This paper introduces the measurement methods and results of cdq - boiler system for mass and energy balance diagnosis, analyses the technologic economic index at the different product rate, puts forward the measures of decreasing the ratio of coke burning, improving the heat transfer conditions and realizing the optimized control aftertime

    摘要介紹了寶鋼三期干熄系統質能診斷方案及其測試果,分析了不同生產率下的主要技術經濟指標,提出了今後進一步降低炭燒損率,改善內傳熱和實現優化控制的技術措施。
  16. Results : the working environment of plant a is much better than that of plant b

    果:甲化廠作業環境明顯好於乙化廠。
  17. The present situation of producing methanol with coke oven gas is analyzed, the production process is described, and the techno - economic indexes are given with engineering examples

    摘要分析了利用煤氣生產甲醇的現狀。闡述了利用煤氣生產甲醇的工藝,合工程實例給出了技術經濟指標。
  18. Inside, coking, sintering and smelting plants churned out crude iron and steel

    門裏面是炭,燒和熔煉廠攪拌天然礦石和鋼水的熔
  19. In addition, time delay of impact of irregular coke charge to silicon content in hot metal has been analyzed statistically. it is shown that silicon content in hot metal of 60. 24 % tapping increases after six hours of irregular coke charging

    對凈加入量(或次數)對鐵水含硅量的作用時間進行的統計分析果表明:加入凈6小時以後, 60 . 24 %次會出現溫升高現象。
  20. The combustion conditions in a circulating fluidized bed ( cfb ) boiler are much different from a pulverized coal firing ( pf ) boiler. however, this dissertation has confirmed that coal char in cfb boiler will also experience reactivity loss and ordering of turbostratic carbon structure, which have been reported by many researchers whose work were mainly restricted to pf conditions

    本文通過獲得在cfb燃燒條件下熱解和燃燒過程中的碳,對其反應性、亂層碳構、礦物質催化作用和比表面積等進行了系統研究,指出cfb鍋和煤粉同樣存在碳亂層碳構有序化和碳反應性下降(失活)現象,並全面分析了碳失活的機理。
分享友人