特大洪水 的英文怎麼說

中文拼音 [hóngshuǐ]
特大洪水 英文
cataclysm
  • : Ⅰ形容詞(特殊; 超出一般) particular; special; exceptional; unusual Ⅱ副詞1 (特別) especially; v...
  • : i 形容詞(大) big; vast; grand Ⅱ名詞1. (洪水) flood 2. (姓氏) a surname
  • : 名詞1 (由兩個氫原子和一個氧原子結合而成的液體) water 2 (河流) river 3 (指江、河、湖、海、洋...
  • 特大 : especially [exceptionally] big; the most
  • 洪水 : waterflood; deluge; flood; flowage; torrent; spate; flood water; [義大利] acqua alta洪水泛濫 floo...
  1. Holocene extreme floods and environmental change of qishuihe river in western guanzhong basin

    關中西部漆河全新世特大洪水與環境演變
  2. As a practical application, the safety situation of jiujiang dike under the 1998 pluvial condition of once a hundred years in yangtze river has been evaluated by the reliability method from the point view of the seepage stability in terms of probability analysis and two dimensional saturated seepage finite element analysis combining with the mechanism of seepage burst in jiujiang dike summarized in the thesis

    通過滲流有限元和滲流可靠性分析論證了1998長江流域特大洪水災害中九江市防護堤發生的嚴重潰口破壞的滲流破壞機理。分析、比較得出結論:堤防下游坡腳的出逸比降接近和超過臨界比降,在1998年長江百年一遇的條件下九江堤潰口斷面的抗滲可靠性僅在55左右的非常低平。
  3. During recent decade and more, major and super floods have taken place frequently in the yangtse river and huai river. the natural phenomenon of flooding is inevitable. it is not a surefire plan only to take engineering measures for flood control while climatic variation is far from being known

    近十多年來在我國長江、淮河流域連續不斷發生的特大洪水再次向我們展示了這樣一個道理,是一種自然現象,當環球的氣候因素及其變化規律遠未被認識時,試圖僅依靠工程措施來控制並非萬全之策,逐步運用非工程措施,常常能起到「以柔克剛」 、 「以弱勝強」之功效。
  4. The eni of el nino events is expressed by using differences of sea surface temperature in the area of equatorial east pacific 010s, 90180w. based on eni s definition, 25 el nino events and 26 la nina events from 1870 to 2000 are defined. and the starting and ending time of 1997 s strong el nino event is predicted six months ahead of the event by using eni s three periodical overlapping prediction method. the prediction offers great support to the accurate prediction of the flush flood occurred along nenjiang river in 1998

    使用赤道東太平洋010s , 90180w海表面溫度sst距平值表徵厄爾尼諾拉尼娜事件指數eni 。根據eni定義出1870 - 2000年期間25次厄爾尼諾事件和26次拉尼娜事件,採用eni三周期疊加預報模式提前6個月預測出1997年強厄爾尼諾事件的開始和結束時間,為較準確預測出1998年嫩江特大洪水提供了預報依據。
  5. There remained the generic conditions imposed by natural, as distinct from human law, as integral parts of the human whole : the necessity of destruction to procure alimentary sustenance : the painful character of the ultimate functions of separate existence, the agonies of birth and death : the monotonous menstruation of simian and particularly human females extending from the age of puberty to the menopause : inevitable accidents at sea, in mines and factories : certain very painful maladies and their resultant surgical operations, innate lunacy and congenital criminality, decimating epidemics : catastrophic cataclysms which make terror the basis of human mentality : seismic upheavals the epicentres of which are located in densely populated regions : the fact of vital growth, through convulsions of metamorphosis from infancy through maturity to decay

    生與死的痛苦。類人猿和尤其是人類女性那單調的月經,自初潮期一直延續到閉經期。海洋上礦山和工廠里那些不可避免的事故某些非常痛苦的疾病以及伴隨而來的外科手術生來的瘋顛,先天性犯罪癖導致人口批死亡的傳染病在人類心靈深處種下恐怖種子的災難性特大洪水震中位於人口密集地區的地震歷經劇烈變形,自幼年經過成熟期進入衰退期的生命成長的事實。
  6. In this paper, regarding the analysis of stability factors of majiatian tailings fill dam, namely regional geologic structure, rock - soil body of dam foundation, poor geology phenomenon, leach consolidation and chemical consolidation of tailings, seepage water of dam body and king - size flood water of majiatian tailings reservoir, a preliminary demonstration on probability of earthquake liquefaction and seepage failure of dam bodys tailings sand soil, of the dam body failure resulted from abutment landslide and of the flood water overflowing crest, as well as on the contribution of leach consolidation and chemical consolidation of tailings to the stability of dam body has been performed

    通過對馬家田尾礦庫區域地質構造、庫區不良地質觀察、尾礦淋濾固結和化學固結、壩體滲透和庫區特大洪水等因素對馬家田尾礦堆積壩體穩定性影響的分析,初步論證了壩體尾礦砂土的地震液化、滲透破壞、壩肩滑坡使壩體失穩和漫頂的可能性,以及尾礦淋濾固結和化學固結作用有助於壩體的穩定性。
  7. In this paper, regarding the analysis of stability factors of majiatian tailings fill dam, namely regional geologic structure, rock - soil body of dam foundation, poor geology phenomenon, leach consolidation and chemical consolidation of tailings, seepage water of dam body and king - size flood water of majiatian tailings reservoir, a preliminary demonstration on probability of earthquake liquefaction and seepage failure of dam body ' s tailings sand soil, of the dam body failure resulted from abutment landslide and of the flood water overflowing crest, as well as on the contribution of leach consolidation and chemical consolidation of tailings to the stability of dam body has been performed

    通過對馬家田尾礦庫區域地質構造、庫區不良地質觀察、尾礦淋濾固結和化學固結、壩體滲透和庫區特大洪水等因素對馬家田尾礦堆積壩體穩定性影響的分析,初步論證了壩體尾礦砂土的地震液化、滲透破壞、壩肩滑坡使壩體失穩和漫頂的可能性,以及尾礦淋濾固結和化學固結作用有助於壩體的穩定性。
  8. Environmental impact analysis of nen river s severe flood in

    嫩江1998年特大洪水環境影響分析
  9. Analysis of return period of 1995 year ' s flood in hunhe river

    渾河1995年特大洪水的重現期分析
  10. 1 in february, mozambique had the worst flooding in 6 years

    二月,莫三比克發生六年不遇的特大洪水
  11. Was hit by a catastrophic flood,

    特大洪水襲擊
  12. It is widely acknowledged that extensive deforestation contributed to heavy summer flooding

    人們普遍認為過度砍伐造成了夏季特大洪水
  13. Two major factors contributed to devastating summer flooding along the yangtze river and its tributaries

    兩個主要因素導致了夏季長江及其支流的特大洪水
  14. There is no evidence of irrigation, but such evidence could have been obliterated by repeated, catastrophic floods

    沒有灌溉的跡象,但一些明顯的跡象可能已經被再三地沖刷去,例如是特大洪水
  15. This summer, while our country was forging ahead with plans and undertakings in fulfilment of the wishes of the people, it faced the test of the severest floods in a century

    今年夏天,正當國家事業按照人民的意願,步向前邁進的時候,國內發生了百年不遇的特大洪水災害。
  16. It is widely acknowledged that extensive deforestation contributed to heavy summer flooding. experts argue that china must introduce a massive afforestation program. but i doubt whether afforestation alone will solve the problem

    人們普遍認為過度砍伐造成了夏季特大洪水。專家認為中國必須推行規模的植樹造林計劃。但我對僅僅植樹造林就能解決問題表示懷疑。
  17. The paper analyzes and summarizes the following laws of distinctive sediment yield produced in storm floods of the region based on predecessors ' study : storm is the main dynamic force of erosive sediment yield and storm, flood and sediment exist an inevitable relation ; the flood occurring time is concentrated with high peaks and huge volume, suddenly rising and suddenly falling and has decisive influence to the formation of a major flood peak in the middle yellow river ; the main reasons of concentrated coarse sediment of the river is severe erosive sediment yield, strong sediment transporting capacity and high sediment concentration ; the important influence of frequent or continued storm floods happened in he - long reach especially in coarse sediment concentrated region to the sediment transport of the yellow river and ; along with the increase of harnessing, regional flood trend is becoming smaller but the variation of sediment quantity is not obvious and the reaction of peak discharge and flood runoff of majority tributaries are not sensitive, showing that a general and normal engineering works can not effectively control regional major floods especially the sediment of an extraordinary flood

    摘要在前人研究的基礎上分析總結了該區有的暴雨產沙規律:暴雨是侵蝕產沙的主要動力,暴雨、、泥沙之間存在著必然的關系;發生時間集中,峰高量,暴漲暴落,對黃河中游峰的形成具有決定性影響;侵蝕產沙強烈而粗泥沙集中,輸沙能力強,含沙量高,是黃河粗泥沙的集中來源地;河龍區間別是粗泥沙集中來源區頻繁或連續的暴雨對黃河輸沙有重要影響;隨著治理平的提高,區域有減小趨勢,但泥沙量變化不明顯,部分支流的峰流量、量反應不敏感,說明一般規模和平的治理工程還不能有效控制區域別是特大洪水的泥沙。
  18. Abstract : the scour process at the rear apron of shimen dam is studied through review of operation practice and inverse operation experiments. the cause of scour is explained, the scour pot was not stable after the occurence of extreme flood with the return period of 300 years, and the flood may deepen the scour pot even more severe

    文摘:通過長期實踐和反演試驗,研究了石門拱壩投運26年來壩后沖刷坑動態發展的全過程,解釋了其形成的主要原因,並指出重現期300年的特大洪水發生后,石門沖坑並未穩定,小於它的仍舊造成了更深更危險的沖刷。
  19. The scour process at the rear apron of shimen dam is studied through review of operation practice and inverse operation experiments. the cause of scour is explained, the scour pot was not stable after the occurence of extreme flood with the return period of 300 years, and the flood may deepen the scour pot even more severe

    通過長期實踐和反演試驗,研究了石門拱壩投運26年來壩后沖刷坑動態發展的全過程,解釋了其形成的主要原因,並指出重現期300年的特大洪水發生后,石門沖坑並未穩定,小於它的仍舊造成了更深更危險的沖刷。
  20. With the meteorological and hydrographic data in songhuajiang and nenjiang valley from 1951 to 1995, using correlation analysis and empirical orthogonal analysis, the rule of the flood and relation between flood and precipitation distribution in this region are discussed. the results show that periodic change of water level is obvious in this region. now water level is in the serious stage from 1980 ' s. there are great relation between the water level of flood period and the precipitation. the unusual precipitation of nenjiang valley has greater impact than that of second songhuajiang valley. at the summer in 1998, songhuajiang and nenjiang valley encountered the ghastly flood and the reason for that is the anomalous precipitation great exceeding the historic maximum

    利用松花江,嫩江流域1951 1995年期間的氣象和文資料,採用相關分析,經驗正交分析等方法,討論了該流域澇發生的規律及其與流域內降分佈的關系.文章指出,江流域的位變化有明顯的階段性,且具有全流域一致的性,目前正處在80年代以來澇較嚴重的階段;嫩江流域降異常偏多對松花江澇的影響比第二松花江的作用要; 1998年夏季,松花江,嫩江流域出現超歷史紀錄特大洪水的關鍵原因是嫩江流域6 8月的降距平百分率遠遠超過了歷史上的的最
分享友人