現場安裝工作 的英文怎麼說

中文拼音 [xiànchǎngānzhuānggōngzuò]
現場安裝工作 英文
on-site installation work
  • : Ⅰ名詞1 (現在; 此刻) present; now; current; existing 2 (現款) cash; ready money Ⅱ副詞(臨時; ...
  • : 場Ⅰ名詞1 (平坦的空地 多用來翻曬糧食 碾軋穀物) a level open space; threshing ground 2 [方言] (...
  • : Ⅰ名詞1 (服裝) dress; outfit; attire; clothing 2 (演員的化裝品) stage makeup and costume Ⅱ動詞...
  • : Ⅰ名詞1 (工人和工人階級) worker; workman; the working class 2 (工作; 生產勞動) work; labour 3 ...
  • 現場 : 1. (出事地點) scene 2. (工作地點) site; spot; on-site; work field
  1. In view of bearing capacity of the elastoplastic theory analysis, the author made a comparison between the achieved bearing capacity limit load pi / 4 of round base ( space problem ) and the limit load pi / 4 of bar groundwork foundation design ( plane problem ) from soil mechanics at home and abroad as well as foundation criterion, and explained why the value of formula in present design criterion from soil mechanics is inclined to be conservative. in the light of the author ' s many years experience of vibration test on the spot and the research work of relevant projects, the author worked over the dynamic pile testing of the bearing capacity of foundation and batholith, and gathered the parameter of dynamic analysis and testing. the author also talked over the difficult point of pile foundation design criteria in present batholith engineering world, i. e. the confirmation of batholith bearing capacity of pile end, from the following aspects : a ) confirmation of single axis counter - pressure strength of rock in house ; b ) f. e. m calculation of elastoplastic model ; c ) calculation of soil mechanics ; d ) deep well load test

    然後,對巖土程領域至今尚未解決,甚至不為人注意的考慮地基變形的地基承載力問題進行了實用化的探討,提出了考慮地基變形的地基承載力上程計算方法;對基於彈塑性理論分析的地基承載力國內尚未見報道的空間問題得到了圓形基礎(空間問題)的承載力界限荷載p _ ( 1 / 4 ) ,並與國內外土力學專著及地基基礎設計規范中的條形基礎(平面問題)的界限荷載p _ ( 1 / 4 ) ,進行了對比,從而定量上解釋了目前設計規范引用土力學承載力公式值偏於保守的這一情況;根據本文者多年從事地基程振動試驗及相關課題的研究,本文以截頭錐模型模擬地基,對地基(巖基)承載力的動測法進行了研究,為各類地基(包括巖基) ,匯總了動力分析和檢測川的參數:針對日前巖土程界應用樁基設計規范中的難點? ?樁端巖基承載力的確定問題,從巖石室內單軸抗壓強度確定、基於彈塑性模型的有限單元法計算、土力學計算及深斤載荷試驗四方面進行了深入討論;本文者根據多年載荷試驗的程實踐,對深井荷試驗置的核心部分? ?反力置,設計了側壁支撐反力加載系統,該加載系統具有實用、簡便、穩定及個等優點。
  2. 162 field erection work ( civil work ) will begin in october this year and complete on june first next year

    現場安裝工作(土建)將自今年十月開始至明年六月一日完
  3. Using the computer, network and communication technology, the manager can mast the remote equipment running station and control the equipments with sensors installed in working site. the supervision system has good flexibility and expanded ability, hence the stability of mobile system has been improved. the data picked up by sencors has been transferred to the remote monitoring center with communication networks

    目前遠程嵌入式監控系統已經成為監控系統的發展趨勢,代遠程監控技術,藉助于計算機,網路和通信技術,管理者可以依靠的各種傳感器,實時了解狀況,對設備進行監視診斷和維護,使整個系統具有高靈活性和可擴展性,同時也增加了被監控系統的穩定性。
  4. The equipment is made up of oil pump set ( driven by gasoline engine 、 electric motor or manpower ) 、 3 - stage telescopic jack 、 horizontal displacement set 、 rescue riggings etc. according to the railway accident, the equipment can rerailing the derailed wagon 、 overturn them out of demarcation or horizontal displace them out of demarcation. the equipment has the characteristics of rapid rate 、 easy operation and high reliability etc. the equipment is suit for railway rescue team to deal with complex derailing accidents and it ' s an efficient implement for improve rescue ability of railway rescue team

    該機具由泵站(手動或機動) 、三級千斤頂頂升置、橫移置、臺車索具等組成,根據事故情況,可選擇將事故車起復復軌、整體翻出限界、整體移出限界,具有省時速度快、操簡便、全可靠等特點,適合救援隊處理較復雜的車輛脫線事故,是提高救援隊能力的一種有效具。
  5. The installation and debugging on the user ' s spot shall be conducted by the experts from the seller, the buyer shall be responsible for the labor force and necessary means of transportation and equipment

    設備在用戶、調試應由賣方應派專家進行指導,買方負責提供勞動力和必要的交通具、設備。
  6. Consisting of blowers, air ducts, rescue stations and other auxiliary equipment, the mobile pneumatic emergency rescue device is a new - style firefighting emergency rescue equipment targeting at metro fires, with the working principle of adopting mechanical ventilation to create positive pressure so as to prevent the outside smoke entering, thus setting up a temporary smokeless secure place in the smoking accident site

    摘要可移動充氣式應急救護置是一種重點針對地鐵火災的新型消防搶險救援備,主要由風機、風管、救護站及其他輔助設備組成,其原理是採用機械通風的方式在救護站內建立正壓,阻止外界煙氣進入,從而在充滿煙氣的事故建立一個沒有煙氣的臨時所。
  7. Abstract : anchor packer is one of the important downhole tools which areused in oil production and waterflood technical operation, such as layer waterflood, layer fracture or acidation, mechanical water block. after anchor is fixed in the simulated test unit, the invasion depth of the casing can be known with the help of the sensor around the casing wall, and then the failure degree is concluded. this is very important for the anchor packer design and site operation

    文摘:在油田開發中封隔器是實施機械採油、分層注水、分層壓裂或酸化、機械卡堵水等注采業的主要井下具之一,封隔器上的卡瓦是保證可靠性的重要元件,把卡瓦在模擬試驗置中,通過在套管壁周圍分佈位移傳感器,測得卡瓦錨定后切入套管壁深度,判斷卡瓦對套管的損傷程度,這對封隔器的設計和使用具有十分重要的意義。
  8. Steel - structured residential housing is environment - friendly and meets the requirement for a sustained development. furthermore, it ' s easier for the process of industrialization, production standardization, and installation. there are less wet operation and pollution on the construction site, which is conducive to environment protection

    鋼結構住宅是環保型住宅,符合可持續發展要求,具有便於組織業化、標準化生產,方便,施業少,污染小,符合環保建築施的要求,建造速度快(期可縮短1 / 2到1 / 3 ) ,平面布局靈活,凈使用面積大(提高5 8 % ) ,自重輕(約為混凝土結構的1 / 2 3 / 5 ) ,綜合造價低等優點,是我國推進住宅產業代化的較理想的住宅建築體系。
  9. In this system, mean velocity pipe is applied to transform the air velocity signal into pressure difference signal, and then the pressure difference signal is input into pressure difference transmitter to realize the transform of the pressure difference signal from non - electricity signal to electric current, and through the resistance in the corresponding sampling circuit the electric current is transformed into voltage signal ; the thermocouple is used as the primary element to realize the transform from temperature signal to the voltage signal ; under the control of communication agreement module, diversified voltage signal is transported into computer by way of a / d conversion module, and then the monitoring software compiled beforehand is transferred to deal with all the voltage signals relatively, the result of which is conveyed to relative interface to display

    置具有三個特點:一是採用表面式測溫方法,有效地減少了元件的維護與損耗;二是採用業控制計算機及信息就地採集、數據總線傳輸的方式,充分利用計算機和數據自動採集方面的技術,實各種參數的在線測量,監測指標全面,能與dcs系統聯用,具有技術先進性和一定的前瞻性;三是採用顯示器配業觸摸屏的顯示方式,為運行人員提供了簡單、易學、方便的操模式。本置自2001年8月投入運行以來,有效地幫助、指導運行人員進行燃燒調整,對于鍋爐和機組的全、經濟運行發揮了重要用。
  10. This can be of significant benefit to cut down the cost and time limit for a project the program package gone with this paper may realizes the dynamic simulation for all of courses in hoisting, and may synchronously displays the axis force of derrick, the pull - force of the steel wire, obliquity of equipment and overloading instance

    這有利於程實踐中方案變更、施條件復雜多變等的方案驗算,節約成本和縮短期。本論文程序為桅桿吊整個過程實了動態模擬,顯示桅桿軸向壓力、鋼絲繩拉力、設備傾角和起重超載提示,為全吊設備提供重要的數據,有利於業過程的全程監控。
  11. 409 we shall complete the manhour requirements for the site fabrication ( site erection ) of this drawing

    我們將制訂這張圖紙)所需的時條件。
  12. 二 、 construction project organization latticed frame ( shell ) installation enterprise should set up project site organization institution adapted to project construction activities firstly before constructing and installing in the site, through discussing the designed principle and basis of construction project organization, the step of construction item organization of space grid structures are related as follows : project analysis, object working, agency and function determination, personnel and duty definition

    二、施項目組織管理網架(殼)企業在前,首先應建立與程項目施活動相適應的項目組織機構,通過對施項目組織形式設計的原則和依據論述,給出了網格結構施項目組建的步驟:項目分析;目標劃分;劃分;確定機構及職責;確定人員及職責。
  13. The working plan of the system : after each module is installed in the field, they are configured with an upper pc or the record module

    系統應用構建:各個模塊后,通過上位機pc或記錄模塊對各個節點進行組態。
  14. To cope with existing kiosks, a physical constraint for installation, where container number verification takes place, 5 different mounting racks are constructed, under critical schedule, that installation is possible inside canopy

    為應付亭設施對構成的環境障礙,特別排五支配架檢測識別及記錄集箱號碼之用,而毋須于遮篷之外。
  15. An established engineering services company specialising in engineering design and installation of industrial facilities for the electronic, pharmaceutical, special industrial gas business sectors and, mnc office buildings and space seeks a dynamic and results - oriented marketing manager to grow its businesses in singapore and china

    備注:本公司是一家完善的外資程服務公司,專門從事程設計與為電子業、制藥業、特殊氣體製造業等領域及跨國公司辦公大樓進行業設備徵求一位有魄力,極具銷售能力的市部經理以提升企業在新加坡與中國的業務。
  16. On - site installation work

    現場安裝工作
  17. 380 all site erection works will be performed by the buyer under the technical instruction of the seller

    所有的現場安裝工作都應在賣方的技術指導下由買方完成。
  18. By methodology of comparison and deduction, the article made in - depth analysis of nine facets which are customer group for wholly - decorated housing, intelligent designing and consulting service, operation cost management and establishment of budgetary estimation, inventory, back - end refinement, generalized system for installation in situ, monitor, check - and - accept, maintenance, property management and contract management

    論文通過對比、演繹的寫方法,將傳統家庭修的種種弊端與產業化修模式的特點進行比較,從對購買全修房購買人群的調查、智能設計服務咨詢體系、成本管理和預決算系統的建立、物料庫的建立、后業化集約化體系、監理、驗收體系、修保修及物業管理及合同管理這九個方面進行詳盡闡述。
  19. The word " work " means the engineering, design ( including, but not limited to, primary design, extended preliminary design and preparation of detailed design and construction drawings ), construction ( including, but not limited to, early work, site setting out, earth back filling works, sub - structure works, civil works, above - ground works, installation and testing ) and construction management services to be performed by the development manager and subcontractors pursuant to the provisions of this contract and a written authorization, and as modified from time to time in accordance with the provisions of this contract, and includes all designs, drawings, plans, means, methods, techniques, sequences and procedures and, unless expressed to the contrary in this contract, all materials, tools, utilities, labor, equipment services, licenses, permits, tests, warranties, guarantees, transportation and other items and facilities of every kind necessary for the complete performance of this contract

    程」一詞應指由開發管理人和分包商根據本合同的規定和書面授權書執行的程、設計(包括但不限於初步設計、擴初設計以及深化設計圖和施圖的準備) 、施(包括但不限於前期布局、回填土程、次結構程、市政程、地上程、和測試)及施管理服務,該等服務可根據本合同的規定被不時修訂,並包括所有的設計、圖紙、計劃、手段、方法、技術、序和程序以及,除非合同中有相反規定,所有的材料具、設施、人、設備服務、執照、許可證、測試、保證、擔保、交通以及其他為圓滿執行本合同所需要的各種物品和設施。
  20. 1 all gear operator items in this table may be field or factory assembled to butterfly valves

    1本表中所有齒輪操機構項目都可以在蝶閥上。
分享友人