現場焊接 的英文怎麼說

中文拼音 [xiànchǎnghànjiē]
現場焊接 英文
field weld; site weld; site welding; field welding
  • : Ⅰ名詞1 (現在; 此刻) present; now; current; existing 2 (現款) cash; ready money Ⅱ副詞(臨時; ...
  • : 場Ⅰ名詞1 (平坦的空地 多用來翻曬糧食 碾軋穀物) a level open space; threshing ground 2 [方言] (...
  • : 動詞(用熔化的金屬修補金屬器物或使金屬工件連接起來) weld; solder
  • : Ⅰ動詞1 (靠近;接觸) come into contact with; come close to 2 (連接; 使連接) connect; join; put ...
  • 現場 : 1. (出事地點) scene 2. (工作地點) site; spot; on-site; work field
  • 焊接 : weld; welding; soldering; seal; sealing; sealing-in; shutting together
  1. As one kind of key equipment in piping work of large - scale turbo - generator set in power plant, the machine is especially applicable to various welding bevels, flat end and angle of outer & inner diameter of ascending pipe, elbow pipe, bend, flange and etc., which greatly meets demands in pipe processing of construction site and manufacturers

    本機床是電站大型汽輪發電機組的管道施工的關鍵設備,對直管、彎管、彎頭、法蘭等管體的各種型式坡口,端平面,內外徑過緩斜度及直口,能滿足施工和製造廠家對各種管件的加工要求。
  2. Long rails in jointless track are usually made on welded rail site or in railway welded rail factory

    摘要無縫線路長鋼軌道常由鐵路軌廠或軌基地
  3. The steel construction is made up of roof beam, post, purlin, roofing and wall, adopt the automatic production line to weld and take shape in the factory, construction site spend high - strength bolted joint reduce weld work load, make progress and quality receive the complete assurance

    鋼結構由梁、柱、檁條、屋面和墻體組成,工廠內採用自動化生產線成形,施工用高強螺栓連,減少了工作量,使進度和質量得到完全保證。
  4. Bpec handrail, a new type compositive handrailing which hollow ball, metal stucture, its stanchion is set up with several metal hollow balls and pipc through welding, the composition at worksite is very simple and easy without any welding, economic & fine outlook, stable, convenient for installing and separaing

    博佩克欄桿是一種新型的空心球金屬結構組合式欄桿,立柱由若干個金屬空心球和同一材料的金屬管通過成為柱子;扶手,橫桿與立桿採用組裝,可不用,具有經濟美觀,安裝及拆卸簡便,牢固耐用的優點。
  5. And it investigates the appearance condition ( including joint, crack, eroding, corrosion, braking pole device rupture, crane - girder ' s gnawing railway and so on ) of the whole crane - girder system on the spot, at the same time, it also actually examines the stress of the beam, chemical ingredient, distortion and railway excursion, etc. through sampling, and based on the actually examined results, it checks and calculates the carrying capacity of crane - girder system. then, based on the investigating on the spot and the calculated result, it discusses the mechanism of fatigue failure of the upper part of welded steel crane - girder, analyses the reason of steel crane - girder in the high - frequency emerging the fatigue crack, institutes the strengthened method of damaged steel crane - girder of accurate packing up workshop of the primary mill plant. finally, it presents some advice and suggestions for the repairing and strengthening method of fatigue crack of upper part of steel crane - girder in the high - frequency

    針對包鋼初軋廠精整車間鋼吊車樑上部區域出裂縫這一問題,本文首先綜述了國內外關于鋼吊車樑上部區域疲勞裂縫的研究狀;其次對整個吊車梁系統的外觀情況(包括連、裂縫、腐蝕、銹蝕、制動桿件斷裂、吊車啃軌等)進行了調查,抽樣實測了梁的應力、化學成分、變形及軌道偏移等,根據實測結果,對吊車梁系統的承載能力進行了驗算;然後,根據調查及計算結果,探討了鋼吊車樑上部區域疲勞破壞的機理,分析了重級工作制鋼吊車梁出疲勞裂縫的原因,制定了初軋廠精整車間破損鋼吊車梁的加固方案;最後就重級工作制鋼吊車樑上部區域出疲勞裂縫的修復與加固方案提出了一些意見和建議。
  6. Code for construction and acceptance of field equipment, industrial pipe welding engineering

    設備.工業管道工程施工及驗收規范
  7. Code for construction and acceptance of welding works of on - site equipment and industrial pipeline

    設備工業管道工程施工及驗收規范
  8. After installation, the position of galvanization coating destroyed due to welding, cutting and scratch etc. shall be carried out anti - corrosive coating by install on site

    對安裝后的部位,裁切口,碰損擦傷等鋅層遭到損傷的部位,要求施工人員進行防腐塗裝。
  9. After installation, the position of galvanization coating destroyed due to welding, cutting and scratch etc. shall be carried out anti - corrosive coating by installer on site

    對安裝后的部位,裁切口,碰損擦傷等鋅層遭到損傷的部位,要求施工人員進行防腐塗裝。
  10. Based on lots of tig experiments, it can be concluded that welding arc can be well controlled, the characteristic of movement behavior of welding arc are gotten, which lay reliable guarantee on application of mig / mag welding technology

    通過大量tig試驗證明該套裝置能夠實電弧的控制,並且得出了外加旋轉磁作用下電弧運動行為的變化規律,為該裝置進一步應用於mig / mag工藝提供了可靠的保障。
  11. Magnetic head is designed by six magnetic poles in symmetrical distribution, the design of excitation loop and excitation angle makes magnetic field act on welding arc region which could control welding arc effectively. the insulation, cooling and hermetization of magnetic head avoid the influence on magnetic field of outside ; miniaturization design of magnetic head could achieve different welding process

    磁頭裝置採用六磁極對稱勵磁方式設計,勵磁線圈和勵磁角度的設計使產生的磁恰好作用於電弧區域以實對電弧的有效控制;磁頭的絕緣,冷卻,密封設計避免了過程中外界因素對磁的干擾;磁頭整體的小型化使該裝置可以實多種形式的工藝。
  12. Abstract : by taking the modification project of hydrogen generation unit in a petrochemical plant as an example, the successful welding of heat - resistance ferroalloy with high cr - ni content is presented, including weldability analysis, weld procedure qualification test, weld process measures and quality inspection

    文摘:以制氫裝置改造工程為例,報道在制氫轉化爐爐管現場焊接施工中,對鐵基高鉻鎳耐熱合金管材的成功,包括可性分析、工藝評定試驗、工藝措施和質量檢驗。
  13. Manufacturing the welding clamps, meters, engine underpan, vehicle door, rear axle and jigs totally 114 sets, and manufacturing welding clamps of autowelding automaton for shanghai g. m. co., ltd.

    四川旅行客車製造有限公司豐田麵包車夾具流水線製造,並在安裝調試。
  14. This paper discusses the applicable ranges of current welding long rail techniques under various construction circumstances of urban rail transit project, and holds that the engineering scheme of the welded - rail site, the viaduct welded site and the utilization of mobile touch - weld vehicle shall be adopted

    針對城市軌道交通工程中不同的施工環境,對比分析了有的各種長鋼軌方法和適用范圍,探討了軌基地、高架橋上的軌基地及利用移動式軌車無縫線路長鋼軌的施工方案。
  15. Example of field welding for pressure vessel

    壓力容器的現場焊接實例
  16. Field welding of steel water pipe

    鋼制水管的現場焊接
  17. Code for visual inspection and acceptance of site weld of engineering construction

    工程建設施工現場焊接目視檢驗規范
  18. Code of visuai inspection and acceptance for site weld of engineering construction

    工程建設施工現場焊接目視檢驗規范
  19. It is easy and fast to install by any kind of fittings. weld - free is to save grinding and polishing

    利用各個零件組合而成,裝置方便快速,免現場焊接,研磨拋光。
  20. The bracket and vertical column of cable tray will be installed by welding or expansion bolt of the basement. the welding place treatment will be done by painting

    橋架的立柱、托臂等支架可與基礎預埋件固定,也可採用膨脹螺栓固定,對于現場焊接處一定要做好防腐處理,通常由用戶塗刷防腐漆。
分享友人