現場驗收試驗 的英文怎麼說

中文拼音 [xiànchǎngyànshōushìyàn]
現場驗收試驗 英文
field acceptance test
  • : Ⅰ名詞1 (現在; 此刻) present; now; current; existing 2 (現款) cash; ready money Ⅱ副詞(臨時; ...
  • : 場Ⅰ名詞1 (平坦的空地 多用來翻曬糧食 碾軋穀物) a level open space; threshing ground 2 [方言] (...
  • : 動詞1. (察看; 查考) examine; check; test 2. (產生預期的效果) prove effective; produce the expected result
  • : Ⅰ動詞1 (把攤開的或分散的事物聚集、合攏) put away; take in 2 (收取) collect 3 (收割) harvest...
  • : 名詞(古代占卜用的器具) astrolabe
  • 現場 : 1. (出事地點) scene 2. (工作地點) site; spot; on-site; work field
  • 驗收 : check and accept; check before acceptance; check upon delivery; acceptance check; control reception
  • 試驗 : trial; experiment; test
  1. Small power hydraulic turbines. field acceptance test

    小功率液壓渦輪機.現場驗收試驗
  2. In the years of errors and corrections respectively, through the empirical analysis on stockjobbing amount and price, it researches there ' s no difference on studied sample and control sample in appointed areas, and the investors of our securities business have no specially attention on these information. on the other word, we validate the corrections of accounting errors have no market conductibility. later, it analysis the reasons

    分別在會計差錯的發生年度和差錯的更正年度中,通過測和控制樣本的股票交易量、平均超額益率和累計超額益率在報表公布日前後各30天的時窗內的檢,說明我國證券市的投資者對這類信息未予以特別關注,即我國上市公司的會計差錯及其更正行為不具有市傳導效應,並進一步從理論上分析了這種象產生的原因。
  3. A recommend value of appropriate roadbed height is put forward according to the sand dune type and the highway grade, make investigation to the sand harm and other problems of built highways in desert areas gathering the related materials of present day highways, and then make comprehensive and systematic statistics to related data and racious factors which affect the roadbed height ; analy the suitable roadbed height for the windblown sand drift passes through smoothly according to the open country windblown sand field test ; test and verify the outcome according to indoor wind tunnel test ; finally a appropriate recommend roadbed height value will be put forward for different grade highways in different areas, which is according to the analysis of roadbed stability the roadbed height economic analysis and different use requirement to different grade highways

    有沙漠公路的有關資料,對全國已建沙漠公路進行沙害及其他病害調查,對相關數據和影響沙漠公路路基高度的各種因素進行綜合系統地統計分析;通過野外風沙流測定,分析適宜風沙流順利通過的路基高度;通過室內風洞進行證;結合路基穩定性分析、路基高度的經濟性分析,考慮不同等級公路的使用要求,最終提出不同地區不同等級沙漠公路路基填土高度的合理高度建議值。
  4. A complete solution provided by schneider electric on this project, schneider electric provided the low voltage switchboard, alarm monitoring system, control consoles, emergency engine telegraphy system, general alarm system and fire alarm system and some auxiliaries as a complete package including the design, manufacturing, engineering, factory accept test ( fat ), site commissioning and sea trial

    在該項目中,施耐德電氣公司提供了低壓配電板、報警監測系統、監控臺和駕控臺、應急車鐘、通用報警系統和火警系統,以及其它一些輔助設備等的完整總包,它包括了設計、製造、工程、工廠調和海上航。
  5. A transparent model is used to make the deflection jet board grounded on the inhere enlarged dimensions. the finished experiments are conducted to catch the flow rate directions and the situation of cavitation using a high - speed video cameras. in this paper, the finite element analysis and visualiation research of servo valve prestage jet flow field are carried out, which establish the theoretical foundation for mathematical model of servo valve prestage and the whole mathematical model of hydraulic servo valve

    在對射流前置級驅動的伺服閥射流流數值模擬的基礎上,用有機玻璃在偏導射流板原始尺寸的基礎上進行了擴大,製作了透明的偏導射流板,運用高速攝像機、液壓泵站等組成了可視化實系統,對射流流的流速方向、渦流、氣穴等象進行了多方位的觀測,並通過對接管接壓力的測,對流分析結果進行了證。
  6. This paper mainly research how to take full advantage of various quality tools, including work - site management 5s, traditional seven quality tools, process capacity analysis, poor quality cost analysis and more complicated statistics factorial experiment and variance analysis, to lower products cost and improve revenue through process deviation reduction, process cycle time reduction or process output improvement

    該論文主要研究如何運用各種質量持續改進工具:管理5s法、傳統的七種質量工具、過程工序能力分析、質量成本分析法以及較復雜的統計學知識因素和方差分析持續降低過程偏差,減少過程周期時間或增加過程產出,從而降低產品成本,增加入。
  7. Making use of the time series exhibitions of the fluctuation - rate datum, we make our study for the following two purposes : one is to observe whether the preannouncing companies " temporal - condition variance of the series of the return rate conforms to the demand of sta bility ; the other is to decide whether the preannouncing companies " stocks have asymmetrical - information adjustment, this is to say, to decide how the companies response to good or bad news

    為了進一步檢盈餘預告新規則實施效果,我們考慮從波動性入手對股票市的穩定性進行系統分析。我們嘗利用波動率數值的時間序列表進行研究,力圖了解:預告公司股票日益率序列的時變條件方差是否滿足穩定性要求。預告公司股票是否存在信息非對稱性調整象,即對利好利空消息分別做出何種反應。
  8. By analyzing the characteristic of the flow field in overloading srm and comparing several existing experiment techniques, a convergence - fold tube facility was developed. the flow field in chamber of srm with high acceleration was simulated. some inhibitor ablation experiments were carried out in this test facility

    通過分析過載條件下流的特點,提出並比較了有過載地面模擬技術的優缺點,最終確定了斂?折管的模擬方法,模擬了高過載條件下發動機燃燒室內的高濃度粒子流,利用該方法開展了高過載模擬沖刷條件下的絕熱層燒蝕特性研究及絕熱層抗沖刷能力的篩選
  9. This dissertation is on the basis of iran steam and developing project for 12 units in five power plants. this project is epc project ( i. e. engineering, procurement, construction ) and includes the finance and local manufacture. the value of this project is huge and the works related to this project are very complicate

    本案例基於伊朗蒸汽發電機組項目,該項目是對5個電廠的12臺機組的系統設計、土建、設備采購、設備組裝、設備車、和買方人員培訓等工作,即epc (工程、采購、土建) ;該項目還涉及到項目融資和地方製造。
  10. Field acceptance tests of storage pumps

    蓄水泵的現場驗收試驗
  11. Field acceptance tests to determine the hydraulic performance of hydraulic turbines, storage pumps and pump - turbines

    測定水輪機蓄能泵和水泵-水輪機水力性能的現場驗收試驗
  12. Relative performance parameters of some transport equipment, satellite signal and solar signal in a station for verifying the feasibility of selective scheme are tested

    在選定方案的基礎上對相關設備的性能進行了測,並針對設備測與對衛星信號的實際相關接結果進行分析,證了擬定方案的可行性。
  13. System installation includes start - up and performance test and will be carried out by the service engineer of c & s company

    中瑞公司負責測量機的安裝、調以及測量機安裝的最終
  14. Responsibilities : the mechanical engineer is in charge of the project from the design to the commissioning and final acceptance of the equipments

    崗位職責:機械技術工程師負責從設備設計、調到最終的一系列工作。
  15. With a purpose to provide basic data or figures for the feasible research of a project construction and its planning, taking the practical project of preselecting a factory location for an instance, using the principle and method of shallow seismic reflection, based on the area conditions, differences in physical features and disturbance, with experiments on typical sections of the construction area, one can draw reasonable measuring lines, choose right modes of producing and receiving waves, conduct primary and precise computer data processing, acquire a distinct reflected wave section from a shallow depth and explore the stratum structure in the preselected location and the distribution of longitudinal waves

    摘要結合某重大工程預選廠址項目的工程實例,利用淺層地震反射波法的原理和方法,根據地條件、物性差異和干擾情況等,結合典型地段的,合理布置測線,選擇恰當的激發和接方式,進行初步和精細的計算機資料處理,可以得到清晰的淺層反射剖面,準確地查明了預選廠址的地層結構和縱波速度分佈,為工程建設的可行性研究和規劃提供了基礎資料。
  16. Here are the following conclusions : the project of using the ac servo system in the cigarette making & plug assembling combination put forward in this article is reasonable and feasible

    在此基礎上完成了相關實研究和整機的調等工作,機組運行穩定,已通過了該公司和煙廠的
  17. A complete solution provided by schneider electric on this project, schneider electric provided the low voltage main switchboard, emergency switchboard, starter panels etc. as a complete package including the design, manufacturing, engineering, factory accept test ( fat ), site commissioning and sea trial

    在該項目中,施耐德電氣公司提供了低壓配電櫃、應急配電櫃,啟動屏等一個成套的配電櫃合約,它包括了設計、製造、施工、工廠( fat ) 、調和海上航、通用設備等。
  18. Supervise the testing, calibration on field and acceptance of installed instrumentation

    監督儀表的測,校正以及負責安裝儀表的
  19. Secondly, the paper tests the relation between the volatilities of the stock returns and macroeconomic cyclical variables by using granger - causality test and the hendry general - to - specific modelling strategy. we find that such factors we choose here as the volatilities of the value added of industry, the money supply, consumer price index, interest rates and exports, imports have influence on the volatility of the stock returns to some extent

    然後應用格蘭傑因果關系檢和韓德瑞的從一般到特殊的建模理論,同時測股票市益率的條件波動率與宏觀經濟變量的條件波動率的相互關系,發工業生產增加值、貨幣供給量、消費者價格指數以及進出口額的條件波動率等經濟指標對我國股票市益率波動率都在不同程度上有影響。
  20. First of all, engineering database of the system should be adjusted according the fact. and do some pre - splitting blasting experiment in site, accumulating blasting engineer instances on the base of the in site experiment

    首先要用工程具體的數據更新系統的工程數據庫,在進行一定數量的預裂爆破,在的基礎上整理與集預裂爆破工程實例數據。
分享友人