環堤 的英文怎麼說

中文拼音 [huán]
環堤 英文
circle levee
  • : Ⅰ名詞1 (環子) ring; hoop 2 (環節) link 3 (姓氏) a surname Ⅱ動詞(圍繞) surround; encircle;...
  • : 堤形容詞[書面語] (水清見底的樣子) (of water) clear
  1. The coastal area of belize is an outstanding natural system consisting of the largest barrier reef in the northern hemisphere, offshore atolls, several hundred sand cays, mangrove forests, coastal lagoons and estuaries

    貝里斯的海岸是北半球最大的礁自然生態系統,它由近海礁、幾百個沙洲、美洲紅樹林、沿海瀉湖、港灣等組成。
  2. Lama exper in evaluation, planning, edsign, environmental appraise, engineering cost, inspection and relative scientific research subject advisory of haror, wharf, breakwater, and slipway project in prot and waterway engineering

    擅長對水運工程中的港口、碼頭、防波、船臺、滑道等工程項目的評估、規劃、設計、境評價、工程造價、監理及有關科研課題的咨詢。
  3. The author presume the original physiognomy of jiuzhai valley, and acknowledged changhai valley was a surface - water with uniform waterpower, the rize valley was a branch of it but the inequality rise of lithosphere, the deposit of earthquake landslides debris flows and falling or glacier blocked the river - way, furthermore, the flow water with high content of ca ( hco3 ) 2, so tufa dyke formed and evolvement the present dyke of lakes the present physiognomy formed on the base of those 2

    由於地震、滑坡、泥石流引起的堆積物和冰川作用形成的冰磧物堵塞河道,再加上構造運動造成地殼的不均勻抬升,九寨溝的這種獨特的地質境以及高含ca ( hco _ 3 ) _ 2的巖溶水流作用下,為caco _ 3沉積創造條件,沉積的caco _ 3加高、連接最終形成灰華壩,使湖泊的形成成為可能。
  4. ( 5 ) the maximum water level risen by the enclose tideland cultivation around the reservoir is 0. 66m, the responding quality is 2000mvs, which heavily effect the environment around the reservoir. the reservoir " s water level is risen because cross section and flood canal become narrow, which caused by building dam, this makes groundwater unsmooth, drainage, even flow from a lower to a higher space and soil salinized

    66m ,且為2000m 』兒的常年洪水,對庫區周邊境的影響較大,因打壩築縮小過水斷面和行洪通道造成水庫水位進一步抬升,致使庫區周邊灌區地下水排水不暢,乃至倒灌,型成士地鹽堿化。
  5. As a new foundation improvement technology, the cast - in - situ concrete thin - wall pipe pile ( pcc pile ) is applied widely in the construction of the highway, civil architecture, haven and sea embankment etc. the pcc pile has a great prospect because it has superiority in the treatment of soils, such as construction period, cost and environment protection

    現澆混凝土薄壁管樁(簡稱pcc樁)及其復合地基是一種全新的地基處理新技術,已應用於高速公路、民用建築、港口、海等工程建設中, pcc樁在處理效果、工期、造價、保等方面具有較大的優越性,因此在地基處理中具有廣闊的應用前景。
  6. Application of environmental isotope and hydrochemistry to leakage study

    境同位素和水化學在壩滲漏研究中的應用
  7. Because of obstructing by impermeable wall, groundwater drainaged long time brings about immersion, whether or not this will result in a series of water surroundings problems, such as farmland salinization, marsh, lowering of ground temperature and so on, which are all focused on by government, resident, experts in engineering, hydrogeology, agriculture and surroundings

    而是否會因為防滲墻的阻隔,地下水長時間得不到排泄而產生浸沒,造成農田鹽堿化、沼澤化和地溫降低等一系列水境問題,均系防建設區各級政府、沿江居民和國內外部分工程及水文地質專家、農業與境保護專家共同關心的話題。
  8. The environmental impact assessment of the embankment projects for controlling flooding in dongtinghu lake district

    洞庭湖區防洪治澇防工程及其境影響評價
  9. The plans will be carried out in different stages, which involves 11 key projects, including : taipu river, wangyu river, dyke around the taihu lake, south - drainage in hangjiahu plain, water drainage and diversion in huxi, hongqitong, flood control in east - west tiaoxi, water drainage and diversion in wuchengxi, enlarging lanlugang, dredging liuhe and xietang, north drainage in hangjiahu, and flood prevention in the upper stream of huangpu river

    該方案以流域防洪除澇為主,統籌兼顧供水,航運和境保護等方面的利益,計劃分期實施包括太浦河、望虞河、太湖大、杭嘉湖南排、湖西引排、紅旗塘、東西苕溪防洪、武澄錫引排、擴大攔路港疏浚泖河及斜塘、杭嘉湖北排通道及黃浦江上游防洪工程等十一項骨幹工程。
  10. The six sea walls constructed in xiamen seacoast from 1953 to 1979 not only changed original nature environment, but also produced many application quaternary problems : tide - absorbing capacity reducing, and the bay silt up increasing ; the coast erode going into worse, and part of coasts collapsing and falling back ; intertidal zone mangrove disappearing, and ecosystem environment being destroyed ; sand beach in seashore running off severely, quantity of sea water falling, and marine products being reduced sharply

    摘要1953 - 1979年廈門沿海修築的6條海不僅改變了原有的良好自然境,而且產生了諸多應用第四紀問題:納潮量減少,港灣淤積加重;海岸侵蝕作用加劇,部分海岸崩塌後退;潮間帶紅樹林消失,生態境遭到破壞;海濱沙灘流失嚴重,海水質量下降,水產養殖銳減。
  11. Abstract : taking “ the great embankment around the tai lake project ” as an example, in which we have repaired a small part of collapsed embankment successfully. some valuable methods and steps of mending collapsed embankment on mollisol foundation are studied in the paper

    文摘:結合湖大工程成功處理局部塌方防的經驗,探討軟土地基塌方防處理的一些有效方法和步驟
  12. Do not try to remove any foreign body which is inserted deep into the wound. place gauze with a hole in the middle over the wound and apply a ring pad around the foreign body or surround the wound with dressing built up like a dam before finishing up with bandage

    然後按照沒有異物的方法處理切勿拔出深入傷口的異物,可在敷料上剪個洞,套過異物,置於傷口上,加上形墊或在傷口周圍砌起敷料成狀,再用繃帶包紮。
  13. Associated works on seawall construction, slope stabilisation, landscaping, street lighting and drainage

    進行相關的工程,包括築建海斜坡鞏固美化境裝設街道照明設施和敷設排水渠。
  14. Based on the concrete engineering of the culvert under the embankment of the high - stacked soil in north second ring highway of guang zhou city, the paper researches the soil pressure distribution and change characteristic through on - the - spot arrangement of the test component

    本文依託廣州市北二高速公路高填土路下涵洞的實體工程,通過現場布設測試元件測試,研究了其涵頂土壓力的分佈與變化特徵。
  15. Ancillary works including earthworks, construction of embankments, footpaths, drainage and river training works, slope works, landscaping works, construction of retaining walls, and the erection of noise barriers

    進行附屬工程包括土方工程行人路建築路渠務及改善河道工程斜坡工程境美化工程建築護土墻,以及設置隔音屏障。
  16. The experiment shows that compared with the surface protections of the conventional dyke projects, this new type of the surface protection has the merits of higher resistance to high shear tress ; better stability and permeability and has the advantages in improve the eco - environment and facilitate the construction concerned

    試驗表明:新型生態防洪工程護面連鎖塊與傳統防工程的護面形式相比,具有抗高切應力、穩定、透水性好、改善河道生態境等優點,而且施工方便快捷。
  17. Calvin ' s movie - " blue moon " is now showing in singapore. . . starting from today at four cinema - golden, princess, woodlands and east shore

    今天四家劇院隆重獻映「月滿抱西」 -黃金,公主,長坊,東濱。
  18. Cleaning of ching kuo road and riverbank in support of environmental project by miaoli county government volunteer work

    響應苗栗市公所舉辦之保工作清掃苗栗市經國路及河邊防義工支援
  19. For example, frp reinforced concrete is used to support or surround magnetic resonance imaging ( mri ) medical equipment, and frp is also used for the constructions of some seawalls, industrial roof decks, base pads for electrical and reactor equipment, anchor in rock and ground engineering and concrete floor slabs in aggressive chemical environments in order to promote the wide usage of frp and frp reinforced concrete structures, financed cooperatively by nationa l natural science foundation ( item : the research on mechanical performance of frp reinforced concrete beam reinforced ; number : 59978046 ) and henan illustrious youth science foundation, connected with the analysis methods of modern steel reinforced concrete structure, the thesis further studies the flexural performance of frp reinforced concrete beam through the systematic study on experimental data got from this kind of beams, systematically establishes the theoretical calculating system of the flexural performance of frp reinforced concrete beam in cooperation with the up - to - date analytical methods for reinforced concrete, which suits the properties of frp

    例如,纖維增強塑料筋應用於支撐和圍繞磁共振成像醫療設備的混凝土中及海、工業頂棚、電設備、反應設備的基座、巖土工程中的錨桿、侵蝕性境的混凝土結構等海洋工程、橋梁工程、路面工程、巖土工程、醫療及化工工程的建設。為了推動纖維增強塑料筋及其混凝土結構在工程中的廣泛應用,本文在國家自然科學基金(項目名稱:纖維增強塑料筋混凝土梁力學性能的研究;編號: 59978046 )和河南省傑出青年基金的資助下,通過對纖維增強塑料筋混凝土梁正截面受彎性能試驗數據的系統分析,結合現代鋼筋混凝土結構學的分析方法,對纖維增強塑料筋混凝土梁正截面受彎性能進行了深入的研究,較系統的建立了適合於纖維增強塑料筋特點的纖維增強塑料筋混凝土梁正截面受彎性能的理論計算體系。
  20. The study solves engineering problem as follows : ( 1 ) the systematic study on the historical course of xigeda strata deposit and geologic environment includes strata, lithologic characters and constitution et in the liangshan and panzhihua region. the results show that the xichang - panzhihua express way is controlled by the anninghe fault and the xigeda fault, the earthquake frequently happen in the region of pass, the different sedimentation number is more great, they effect the road building, safety in operation and structure belong road ( 2 ) because in some place the xigeda strata is foundation and roadbed, the study on the basic properties of the xigeda strata include density, moisture content plastic and liquid limit graduation. the results show that the xigeda strata is deposition in lake, the main component is mudstone and sandstone, the fine particle is main, it has some viscosity, the moisture content of mudstone is different the it of sandstone, the other property are likeness. the xigeda strata has no dilatation on total, some claystone have low and medium dilatation ; ( 3 ) the study on the basic properties of xigeda filler include the composition of matter the biggest standard dry density, the optimum moisture content the results show that xigeda filler can use as road material, it is well grade filler and admixture filler on essence, its compaction index should change in different place because the property is controlled by mudstone and sandstone that change is great in different place ; ( 4 ) the study on the xigeda filler craft used as express way roadbed, includes suitable thickness, compaction numbers and methods and equipment choice et

    公路沿線廣泛分佈有昔格達地層,昔格達地層能否用作高速公路路基填料,國內沒有先例,本論文就是結合導師的科研項目,在非典期間,現場長達5個月的工作,完成了從試驗、現場施工工藝到路分層沉降監測等工作,是面對生產實際,認識昔格達地層的性質和其作為地基、路基和填料應用中面臨的問題進行的研究。主要的研究內容有:對攀西地區地層巖性、構造等地質境和昔格達地層的沉積歷史過程作了系統的分析,研究表明西攀高速公路主要受安寧河斷裂和昔格達斷裂影響,通過地區地震活動頻繁,差異沉降較大,對公路建設、安全運行和沿線構築物設計有較大影響;由於昔格達地層在有些路段作為地基、有些作為路基,對其基本性質進行了研究:包括天然密度、含水量、塑液限、顆粒級配等指標的試驗研究。研究成果表明:昔格達地層為湖相沉積,主要為砂巖和泥巖,它以細粒組為主,同時粘粒的存在,使其具有一定粘性。
分享友人