環面壓土器 的英文怎麼說

中文拼音 [huánmiàn]
環面壓土器 英文
ring roll
  • : Ⅰ名詞1 (環子) ring; hoop 2 (環節) link 3 (姓氏) a surname Ⅱ動詞(圍繞) surround; encircle;...
  • : Ⅰ名詞1 (頭的前部; 臉) face 2 (物體的表面) surface; top 3 (外露的一層或正面) outside; the ri...
  • : 壓構詞成分。
  • : 名詞1. (器具) implement; utensil; ware 2. (器官) organ 3. (度量; 才能) capacity; talent 4. (姓氏) a surname
  1. Depend on the comprehensive analysis and study of the structure, principle, and exterior characteristic of the motor, through the methods of system modeling and digital simulation analysis, two kind of control device that work for the low voltage ( lvdc ) and the high voltage ( hvdc ) in avigation are researched respectively. point to the control technique of close - loop speed stabilization at a limited adjustment speed range, we bring out the close - loop speed control method that using the rotor position sensor indirectly measure the speed of the motor

    在全分析了稀永磁無刷直流電動機的結構特點、工作原理、運行方式以及外部特性的基礎上,通過系統建模和數字模擬分析,分別針對航空低直流( lvdc )和高直流( hvdc )兩種電動機構用永磁無刷電動機,在小范圍轉速連續調節下的閉穩速控制技術進行了詳細理論研究,提出了利用轉子位置傳感信號間接測量電機轉速進行電機轉速閉穩速控制的策略。
  2. Fabrication of the box beam is divided into such parts as reinforcement, formwork, concreting, prestressing, moving and storing of beam, pipe grouting under pressure, end sealing of the beam, water - proof layer on the bridge surface system, protective coating etc. the paper makes description of effective box beam construction technology and workmanship which can be adopted in other projects, such technologies as : manufacturing and fixing of reinforcement, steel reinforcement fixing baseplate, web plate and top plate respectively and lifting the steel skeleton into form, requirements of design and manufacturing and way of utilization for dismantling - erection type formwork and hydraulic formwork, optimization of concrete ratio, concrete pouring process of two ends of beam in priority over the middle, in sequence of first baseplate followed by web plate and top plate at last, concrete pouring in inclined section and in horizontal layer, concrete vibration mainly by external vibrator in assistance with internal vibrator, methods and regulation for steam curing of concrete, dual controls over stress and strain to ensure quality of prestressing workmanship, construction method of effective beam moving by heavy - weight special moving facility, some regulations and key notes about construction of grouting under pressure, beam ends sealing, water - proof layer on the bridge surface system, protective coating

    箱梁製造由鋼筋工程、模板工程、混凝工程、預應力工程、移存梁工程、孔道漿工程、梁體封端工程、橋防水層和保護層工程等施工節組成。文中介紹的採用胎具製作和綁扎鋼筋,分底腹板和頂板分別綁扎並吊裝鋼筋骨架入模;拆裝式和液式兩種模板的設計、製作要求和使用方法;綜合考慮、優化混凝配合比,混凝灌注從兩端至中間、先底板、后腹板、再頂板的施工順序和斜向分段、腹板水平分層、附著式振搗為主、插入式搗固為輔的施工工藝,蒸汽養護的方法和規定;應力應變雙控制確保預應力施工質量的施工技術;採用重物移運有效移梁的施工方法;漿、封端、橋防水層和保護層施工的一些規定和注意事項等都是對箱梁製造行之有效的施工技術和施工方法,並可為以後類似施工作借鑒。
  3. In this thesis, some work has been done : fisrtly, based on the thorough investigation of the mechanism project, combining concept diagram, the literal description and the formula analysis together for programing motion of the robot ; secondly, according to soil mechanics principle and pressuremeter theories, the model which reflect the interaction force between robot and soil are founded ; thirdly, proceed the analysis and solution ; using virtual prototyping software - adams to optimize the mechanism model and analyze the mechanics ; furthermore compared the analysis calculation result of the above both side, we verify the possibility that the robot dig hole and move in soil ; finally, construction model is consummated based on the optimized result, the mechanism motion and the simulation animation of whole harmonious motion is fulfilled by three dimension simulation software - 3dmax

    論文的主要工作有:首先,在對機構方案進行了深入研究的基礎上,以概念圖標表示、文字描述和公式分析相結合的研究方法對機人進行了運動規劃;其次,根據力學原理和旁理論建立了機人在境下的受力模型並進行了分析求解;然後,藉助于虛擬樣機軟體adams對機構模型進行優化和力學分析;除此之外,通過對上述兩方分析計算結果的比較,驗證了該機人在境下拱洞和蠕動爬行的可行性;最後,在優化結果基礎上進一步完善了結構模型,通過三維模擬軟體3dmax實現了機構運動和整體協調運動動畫的模擬。
分享友人