生產計劃法 的英文怎麼說

中文拼音 [shēngchǎnhuà]
生產計劃法 英文
production planning
  • : Ⅰ動詞1 (生育; 生殖) give birth to; bear 2 (出生) be born 3 (生長) grow 4 (生存; 活) live;...
  • : Ⅰ動詞1 (人或動物的幼體從母體中分離出來) give birth to; be delivered of; breed 2 (創造財富; 生...
  • : Ⅰ動詞1 (計算) count; compute; calculate; number 2 (設想; 打算) plan; plot Ⅱ名詞1 (測量或計算...
  • : 劃動詞1 (撥水前進) paddle; row 2 (合算) be to one s profit; pay 3 (用尖銳的東西在別的東西上...
  • : Ⅰ名詞1 (由國家制定或認可的行為規則的總稱) law 2 (方法; 方式) way; method; mode; means 3 (標...
  • 生產 : 1 (使用工具創造生產、生活資料) produce; manufacture 2 (生孩子) give birth to a child; childbi...
  1. Due - date bargainer with rolling horizon production planning method

    交貨期協商器及其滾動式
  2. The requirement analysis and system design are carried out according to the situation of nanjing sky electron co. ltd. at the same time, the key technology to solve the capability balance of the machine tool and scheduling system of the workshop production are studied, and a management model of the workshop production solved the corresponsive problem to finish the production task in time according to the current need in the enterprises

    然後結合一個典型的製造業企業? ?南京四開電子企業有限公司進行了系統的需求分析和設。接著研究了企業車間級管理模型,提出了一種以按時交付為目標的機床能力平衡與車間級的控制方,並對其中需要解決的關鍵技術進行了研究和討論。
  3. I have taken impotance to analyze the rallying point of famous product, concrete cost and capability of providing and guarantee in this artical, meanwhile, i have caculated the quantity of concrete needed for the year and got the regression equation with the historic data for drilling footage of eight years and the consuming quantity of oilwell cement by the method of linear regression, and it has very significance for the making of stock contract and the plan of concrete production, i have analyzed the physical distribution of oilwell cement by the transpotation flex and the advantage or disadvantage between direct distribution and distribution to store in this artical, and i have tried to find the balance point of the two distribution ways by the ecnomic analysis and pointd out the conception of economic semidiameter, and come to the conclusion of direct distribution, distribution to store, and subarea of distribution to store at last

    本文對油井水泥供應商在品牌號召力、水泥成本、供應保障能力等方面進行了詳盡分析,並對供應商進行了能力排序;用線性回歸方從八年鉆井進尺與油井水泥消耗量的歷史數據推算了當年度油井水泥需求量,得出了回歸方程,這對于油井水泥采購合同的制訂、水泥供應商的制訂具有相當重要的意義;從運輸彈性分析出發對油井水泥物流配送進行了研究,對直達配送、入庫配送的優缺點進行了詳細的分析,在經濟分析的基礎上力求找到兩種配送方式的均衡點,並提出了經濟半徑的概念,得出了直達配送、入庫配送、入庫分區距離等幾項結論。
  4. Using the logarithm graph, multi - varieties production batch problem is resolved. the production scheduling is realized with heuristic traverse algorithm. at last, the strategies, which include disassembling task, shorting interval of the working procedure, overlapping working procedure, deferring the back working procedure etc., are brought forward to deal with the order ' s inserting, postponement, freezing and doing again on carrying out the production plan

    3 )分析了企業職能信息系統的集成性和各部門間的協調性,研究車間的制訂過程,以模糊多屬性折衷式模型實現了工藝路線的決策,採用對數坐標圖表,解決了多品種批量問題,用基於啟發式的遍歷演算實現了工單的排,最後提出了任務分解、縮短工序間隔,相鄰工序時間疊加,延遲后續工序等控制策略處理執行過程中工單的插單、延期、掛停與返工等特殊問題。
  5. Combining the theory of production scheduling with the actual scheduling problems of the project - the development of mis for fuda company, the theory, methodology and implementation of the mixed production are studied in the paper. in chapter one, based on discussing the challenge of the global markets and the change of the competition factors, some problems of production scheduling in practice are analyzed

    本文在分析調度的不確定性和復雜性的基礎上,結合富達管理信息系統項目開發中的實際問題,對混合型調度的理論、方及實現進行了全面的分析和研究,主要研究內容如下:第一章是緒論,從現代市場需求出發,討論了現代企業面臨的挑戰和企業競爭要素的轉變,進而討論了實際調度存在的問題。
  6. We propose using fuzzy linear programming to workout a production plan

    本文提出用模糊線性規編制煉油企業
  7. Analysis and study are made on batch optimizing production, main production planning lay - out, important resource planning coordination method and calculation of safety in - advance period with mixed use of mrpii / jit

    採用mrp / jit混用思想,對批量的優化方、主編排原則、關鍵資源協調方、安全提前期的算等進行了分析研究。
  8. From the production plan to mps, and from production plan to mrp with realized the method

    到主,再從主到物料需求的實現方
  9. It analyses and studies the shortcoming of the actual planning compiling ways and puts forward the ways that suit to compiling the production planning and production activity scheduling in the production of mass customization. then the paper proves the feasibility and advantages of the compiling ways of the production planning and production activity scheduling by the emulation and case analysis

    分析和研究了現行的編制方中的不足,提出了適合大規模定製中編制作業的方,並分別通過模擬和案例分析證明了的編制方作業的編制方的可行性和優越性。
  10. Approaches to simultaneous production planning and scheduling in automobile assembly workshops

    汽車裝配車間與調度的同時優化方
  11. In production planning system, the features and contents of annual production planning, monthly planning, weekly planning and day assembling planning are discussed, and heuristic algorithm is applied in resolving the model of weekly planning and day assembling planning

    系統中,重點探討了年度經營、月、周和日裝配作業的特點與內容,並將啟發式方應用於周和日裝配作業模型的求解。
  12. Simulation is a process to simulate real world with the help of model. simulating the logistics in steel - making process is beneficial to preparation of reasonable plan and scheduling scheme for the process

    模擬是通過模型對真實系統進行模擬的一種方,運用模擬技術研究煉鋼物流對輔助制定合理的和調度策略有重要意義。
  13. The paper proposes mode and algorithm of ve production planning based on the customization manufacturing that cater for the production modes of the production based on forecasting, the assemble to order ( ato ) and the make to order ( mto )

    基於定製原理,提出了滿足基於預測、按訂單裝配( ato )以及按訂單製造( mto )類型的虛擬企業模型和演算
  14. As to the production planning and control of eerp, the traditional production planning and control method is explored and limitations are pointed out. the three layers production planning control model of eerp is presented in. this thesis and its advantages are discussed also

    在eerp的控制方面,首先對傳統和控制方進行探討並指出局限性,進而提出eerp的三層控制模型並討論了其優點。
  15. Aiming at the model mentioned above, this thesis explored the mathematical models and examples of the supply chain planning between the enterprises and the production planning within the core enterprise. the results show its effectiveness and validity. it provides a new method for traditional production planning and control method to get out of dilemma

    針對該控制模型,給出其節點企業間供應鏈和節點企業內部的具體數學模型及實例,模擬結果表明了該模型的有效性和可行性,為解決傳統和控制方所面臨的困境提供了一種新的方
  16. The discrete manufacture enterprise production planning system is designed according to the thought of the software engineering and the above algorithms

    基於以上模型和演算,按照軟體工程的思想設出離散製造企業系統。
  17. A new method for short - term scheduling for crude oil operations in refinery

    一種新的煉油廠原油處理短期
  18. By use of the techniques of operational research, probability and statistics, and via the combination of qualitative analysis with qualitative analysis, an optinun design of production plan was worked out the model of linear programming has been formulated in this connection, the optimal combination scheme of the product structure and output was obtained via the use of computers, the sensitivity analysis was performed and the results were optimized as well the comprehensive production plan was then worked out simultaneously, the optimal economical lot size of production was extracted from the mode of complete - set products

    並應用運籌學、概率統學等方,通過定性分析與定量分析相結合,對企業進行優化設,為此,建立了線性規模型,通過算機求得品結構及量的優化組合方案,並進行靈敏度分析,優化結果,從而制定出綜合。同時提出主優化方案,利用品配套模型,求得最優經濟批量。
  19. Because of the defect of long running time and big complexity in the classical job - shop scheduling algorithm, the paper brought forward an intelligent optimization algorithm based on rule ; scheduling process is divided to primary process and optimization process. through the method of ahp ( analytical hierarchy process ), the effect is researched between several rules and estimate. moreover, the results of ahp are used as a measurable standard to scheduling results

    本文針對傳統車間作業調度演算運行時間長,復雜度大的缺點,提出了基於規則的智能優化調度演算,將排序的過程分為初始排序與優化排序;基於多目標決策的層次分析方,得出了各種規則與系統評價指標之間的影響度,其結論為方案的選擇提供了定量的參考依據。
  20. The purpose of this dissertation is to develop a practical algorithm on nonstandard job - shop scheduling problem with constructional relationship among its parts under the make - to - order mode, and develop a production scheduling system oriented to big device equilibrium to fulfill the practical demands of harbin electric machinery limited company

    本文研究的目的是要尋找一種面向訂單模式且帶有裝配關系的非標準車間作業調度問題的實用調度演算,並根據哈爾濱電機廠有限責任公司調度的實際需求,開發一個實用的面向大設備平衡的系統。
分享友人