用炸藥爆炸 的英文怎麼說

中文拼音 [yòngzháyàobàozhá]
用炸藥爆炸 英文
dynamite
  • : Ⅰ動詞1 (使用) use; employ; apply 2 (多用於否定: 需要) need 3 (敬辭: 吃; 喝) eat; drink Ⅱ名...
  • : 炸動詞1. (在油里弄熟食物) fry in deep fat or oil 2. [方言] (焯) scald (as a way of cooking)
  • : Ⅰ名詞1 (藥物) medicine; drug; remedy 2 (某些有化學作用的物質) certain chemicals Ⅱ動詞1 [書面...
  • : 動詞1. (猛然破裂或迸出) explode; burst 2. (放在滾油里快炒) quick-fry
  • 炸藥 : explosive; explosive charges; dynamite; chloratit (克羅替炸藥)
  • 爆炸 : explode; blast; blow up; bomb; burst; detonate; explosion; fulmination; out-burst
  1. A device, such as a fuse or percussion cap, used to set off an explosive charge

    來引的裝置,例如引線或火帽等
  2. In search process, it not only has no blind areas but also reach enough speed. in disposal process, it exploits satchel charges to detonate the dud, and it has enough accuracy that is equal or close to the manual work

    該系統具有搜索和排除兩大功能,搜索中沒有盲區,並有足夠的搜索速度;排除瞎彈時採就地引,放置精度接近或等於人工放置精度。
  3. Then the article analyses the effecting elements about the economic result of blasting and puts forward some improving measures, and summarizes optimizing model on economic result of blasting both internal and overseas bearing upon. the theory is based on the blasting cost model, which proposed by dr. zhong hanrong. combining with the specialties of water and electricity engineering, starting off through blasting result, it emphasizing considers drilling cost, deep hole bench blasting cost, reblasting cost, and the cost of bottom fleet hole blasting that in mixed loading emulsion explosive blasting

    本文在加拿大鐘漢榮博士提出的破成本模型基礎上,結合水電工程的特點,從破效果出發,著重考慮了應混裝乳化破的鉆孔成本、深孔梯段破成本、二次破成本和破后根底淺孔破成本,以塊度、振動、安全為約束條件,以這四項成本最小為目標函數,廣泛收集各種破經濟技術條件,建立了破優化經濟數學模型。
  4. Taking bench shooting of the shuibuya yihongbao project as example, it makes use of the digital television system of drilling overall - hole wall to actually measure, the testing result of lateral fractural range is 4 - 5m, and that of bottom fractural range is about 3m

    本文試驗工作是以水布埡溢洪道工程梯段破為實例,採鉆孔全孔壁數字電視系統對混裝乳化破破裂范圍進行了實際測試,測試結果為:側向破裂范圍為4 5m ,底部破裂范圍值為3m 。
  5. In order to make the best use of explosive energy in loosing soil or throwing it onto some area and ensuring the bottom meet some leveling requirements after blasting, a plane charge layout is often adopted according to blasting design and engineering quality requirements in open chamber blasting such as mine exploitation, field leveling and foundation pit excavation of construction

    摘要在礦山剝離、場地平整以及建(構)築物基坑開挖等露天破中,為了充分利能量將巖石松動或拋擲到一定區域,並確保底板滿足一定平整度要求,按照破技術設計和工程質量要求,需要設計平面布結構。
  6. Explosives for civil uses - detonators and relays - part 27 : definitions, methods and requirements for electronic initiation systems ; german version cen ts 13763 - 27 : 2003

    .雷管和傳管.第27部分:電子起系統的定義
  7. Blasting of earth is here taken to mean the use of explosives to loosen up earth.

    土壤破在這里是指使來疏鬆土壤。
  8. Explosives for civil uses - high explosives - part 6 : determination of resistance to hydrostatic pressure

    .高.第6部分:耐液體靜壓力的測定
  9. This paper deals with the synthesis of ultrafine diamond ( ufd ) under high pressure and high temperatures generated by negative oxygen balance explosive detonation. the mechanism of synthesis ultrafine diamond by detonation standpoint is presented

    本文從理論和實驗兩個方面對利負氧平衡轟產生的游離碳,在高溫、高壓下相變為納米金剛石( ultrafinediamond簡稱ufd )作了初步探索。
  10. If explosives are used, vibrations will cause the roof of the mine to collapse

    如果破,震動會引起礦頂塌落。
  11. Explosives for civil uses - detonating cords and safety fuses - part 12 : determination of burning duration of safety fuses

    .引索和保險引信.第12部分:測定保險引信的燃燒時間
  12. Explosives for civil uses - high explosives - part 13 : determination of density

    .高.第13部分:密度的測定
  13. Explosives for civil uses - high explosives - part 5 : determination of resistance to water

    .高.第5部分:測定的耐水性
  14. Explosives for civil uses - high explosives - part 14 : determination of velocity of detonation

    .高.第14部分:起速度的測定
  15. Explosives for civil uses - high explosives - part 2 : determination of thermal stability of explosives

    .高.第2部分:測定的熱穩定性
  16. Explosives for civil uses - high explosives - part 4 : determination of sensitiveness to impact of explosives

    .高.第4部分:測定對沖擊的敏感性
  17. Explosives for civil uses - detonators and relays - part 1 : requirements

    .雷管和傳管.第1部分:要求
  18. ( 3 ) the common detonator was firstly applied in the removing temporary concrete beering for the convert of the continous beem system, the character of the method is quickly converted speed and no damnification for engineering structure

    ( 3 )在鐵路預應力混凝土連續梁體系轉換中,首次採普通除混凝土臨時支座,轉換速度快,對工程結構無損傷。
  19. This paper using ls - dyna finite element analysis program to model the damage process of oilcan steel plate under no. 3 rock explosive load, analysing the effect of the mass and shape of explosive to steel plates extent of damage and shape of crevasse

    ls - dyna有限元程序,模擬了油罐鋼板在3 (上標# )巖石載荷下的破壞過程,分析了質量、柱形狀對鋼板破壞程度和破口形狀的影響。
  20. Owing to inborn high temperature and high pressure gas after blasting and complexity of dynamic principal relationship and interact ional complexity between dynamite and rock and non - equal character and anisotropies of rock, the rock blasting mechanism research is quite complex

    該過程由於後生成的高溫、高壓氣體產物和巖石動態本構關系的復雜性,與巖石之間相互作的復雜性,以及巖石本身的非均質性和各向異性等使得巖石破機理的研究顯得十分復雜和困難。
分享友人