田模型 的英文怎麼說

中文拼音 [tiánxíng]
田模型 英文
tamiya corporation
  • : Ⅰ名詞1. (田地) field; farmland; cropland; land 2. (姓氏) a surname Ⅱ動詞[書面語] (打獵) hunt
  • : 模名詞1. (模子) mould; pattern; matrix 2. (姓氏) a surname
  • 模型 : 1 (仿製實物) model; pattern 2 (制砂型的工具) mould; pattern3 (模子) model set; mould patter...
  1. For this purpos, from the point of the log geology, aimed at the actuality of the current fractured reservoir log geology interpretation and evaluation, based on synthetical analysis of the current domestic and foreign fruit of fractal dimension investigation of reservoir fracture, using the method and technique of fractal dimension, through the further discussion of the fractal dimension characteristics of m index and n index in the log interpretation archie model in a sample way and through the theoretic reasoning to the fractal dimension dfa and m index of fractured reservoir interval ' s log curve, according to the geophysical signification of the fractal dimension dfa of fractured reservoir interval ' s log curve shape : the more complicated the change of the curve shape is, the larger the its dfa value is, then the more complicated space structure of fracture and pore, then the higher value of m index of space structure of fracture and pore, and so on, the text propounds an improved method, based on box dimension, of covering log curve with scale grid, and by programming computes the dfa and its m index value of fractured reservoir interval ' s log curve, for instance, ac and rt curve, ect, then further puts this technique into application investigation, and makes analysis of application effects in the reservoirs located in l area of qx oil field from three aspects : 1. the dfa and its m index value of fractured reservoir interval ' s log curve, for instance, ac and rt curve, ect, which are derived from computing, is used to identify reservoir type by crossplotting m index with the product df _ acrt of fractal dimension of acoustical wave log curve and restivity log curve and by experiential discriminance plate of reservoir type in l area of qx oil field

    因此,對該區裂縫性儲集層的類識別、孔滲特徵的測井地質解釋以及儲層裂縫的發育和分佈規律進行深入的研究便成為本文研究的出發點。為此,本文從測井地質的角度,針對當前裂縫性儲層測井地質解釋與評價的現狀,在綜合分析當前國內外儲層裂縫的分形分維研究成果的基礎上,利用分形分維方法和技術,通過對archie測井解釋中的m指數、 n指數的分形分維特性的深入淺出的論述以及裂縫性儲層段測井曲線分維d _ ( fa )與m指數的理論推導,根據裂縫性儲層測井曲線形態分維值的地球物理意義? ?曲線變化越復雜,則其分維值d _ ( fa )越大、裂縫孔隙空間結構越復雜、裂縫孔隙空間結構指數m值越高等特徵,提出了改進的基於盒維數的測井曲線網格覆蓋法,編程計算了裂縫性儲層段常規測井曲線(如聲波和電阻率曲線)上分形分維值及其m指數值,進而從以下三個方面對qx油l區塊的裂縫油藏進行應用研究,效果十分理想: 1將計算得到的可變的m指數與聲波和電阻率分維之積df _ acrt進行交繪,採用儲層分維值分類技術統計分析這些參數變化的規律,並結合qx油l區塊儲層類經驗判別圖版,從而實現qx油l區塊下白堊統的裂縫性儲層的類識別。
  2. Bulk density in 0 ~ 20cm, 20 - 40cm and field capacity in 20 ~ 40cm can be simulated with pure nugget effect model, and they are not spatially correlated in sampling scope. 4

    O ~加cm 、 20一40cm土壤容重和2 } 40cm間持水量符合純塊金效應,說明在采樣范圍內它們的空間相關性不存在。
  3. Based on the data, infiltration parameters k, ai and bi were obtained according to the flow advance and recession course of the stream in the furrow, on the base of which, the model of surge furrow irrigation was set up

    基於間實測的間入滲及灌水試驗資料,利用灌水溝水流推進、消退過程,求得波涌灌入滲參數k , a , a _ i和b _ i ,並由此得出波涌灌的入滲
  4. In ranking the indicator system of affecting cultivated land being selected into prime farmland has been built firstly, which is composed of 18 indicators involved in quality, location, policy attribute and administrative intervention of cultivated land. then based on the character of ranking, the idea of combination decision has been brought forward, ranking cultivated land synthetically with three ranking models including a model by similarity to ideal point, fuzzy optimization model and attribute hierarchy model. in three models the weights are based on hierarchy analysis and entropy weights, considering not only subjective partiality but also the intrinsic information of decision objects, which make the ranking results more scientific, reasonable and credible

    在耕地綜合排序中首先建立了耕地入選基本農的決策指標體系,由耕地質量狀況、區位條件、政策屬性以及行政干預4大決策因素共18個決策指標構成;然後根據排序問題的特點,提出了「組合決策法」的思路,並採用逼近於理想點的排序( topsis ) 、糊優選( fom )和屬性層次( ahm )三種排序方法對耕地進行綜合排序,每種排序中均採用基於層次分析法和熵權系數法確定的綜合權重,既考慮決策者的主觀偏好,又充分利用決策對象的固有信息,使排序結果更為科學、合理、可靠。
  5. The empirical analysis, using probit model, showed that the extension efficiency of the technique was obviously affected by following factors : income and cost, yield increase, farmers " age and education, non - agricultural income, farmer ' s social status, distance from town, frequency of farmers " contact with media and agricultural technicians

    運用probit對超高茬麥套稻技術推廣的影響因素進行分析,結果顯示畝增收節本、畝增產量、戶主年齡、戶主受教育時間、非農收入、是否幹部、離鎮距離、媒介頻率、與農技人員接觸次數對該技術的推廣有顯著影響。
  6. The foundation of reservoir model and residual oil prediction have been the core of reservoir detailed description for improved oil production and enhanced oil recovery

    儲層地質的建立和剩餘油分佈的預測已成為油開發中後期油藏描述的核心。
  7. Optimization of and modeling of concentration distribution of the solution obtained by leaching of natural sodium nitrate ores in the sunning process

    多級鹽灘曬硝酸鈉礦浸取液時濃度分佈及優化
  8. Afterwards, a new strategy of robust optimization design process of three stages based on tolerance model and taguchi methods is advanced. this process makes full of the intense complementary action of characteristics between tolerance model and taguchi methods. it realizes the result of high accuracy and efficiency by the application of this strategy

    之後,充分利用容差法和口方法這兩種方法的優缺點之間所具有的強烈互補性,提出了基於容差法和口方法的三階段穩健設計進程策略,針對工程問題優化不同的求解難度,又分成數值計算穩健設計進程策略和解析計算穩健設計進程策略,從而實現高效的求解效率和高精度的優化解。
  9. This paper researches the basic statistical rule of oil - gas dynamic system from the systematic theory, combining with the common characteristic and structure characteristic of oil - gas dynamic system, taking the design requirement of oil field development programming into consideration, by using of functional simulation principle ( including nn method, differential simulation method ) and historical data of oil field, establishes the in - out conjunctional relationship of dynamic index of oil field development, and researches the two level index prediction of development dynamic with both oil field and oil production plant on the basis of the in - out conjunctional relationship. furthermore, this paper analyzes the " decision - making variable ", " object " and " restriction terms " by the optimization theory and set up several optimal models which compose the oil field development programming, it is following : optimization model of the production composing ( solving the optimal composing of each subentry production and cor responding cost, workload, including the onshore thin oil production, the heavy oil thermal process production, tertiary oil recovery production, and the offshore production ) ; optimization model of measure production structure ( determining the optimal composing of each measure production and measure workload, which is composed of fracture, acidulation, capital repair and so on ) ; optimization model of the production distraction ( optimal distribution of the whole oil field production to each oil production plant ) and the integrated development programming model of oil field

    本文從系統理論出發研究油氣動態系統基本統計規律,結合油氣動態系統的一般特點,結構特點,兼顧油開發規劃設計的要求,利用功能擬原理(含神經網路方法、微分擬方法) ,依據油歷史數據,建立了油開發動態指標間的輸入輸出關聯關系,並在此輸入輸出關聯關系的基礎上研究了油及採油廠兩級的開發動態指標預測,同時利用最優化原理,在分析「決策變量」 、 「目標」及「約束條件」的基礎上建立了多個構成油開發規劃的「優化」 ,這些優化包括:產量構成優化(解決陸上稀油產量、稠油熱采產量、三次採油產量、海上產量及對應的成本、工作量的最優構成問題) ;措施產量結構優化(解決壓裂、酸化、大修等各項措施產量及措施工作量的最優構成問題) ;產量分配優化(將油的產量最優地分配到各採油廠)以及油綜合開發規劃
  10. A stochastic chance - constrained programming model is put forward for incremental measures program of oilfield, which uses the most increasing output as objective and takes both cost and work quantity into account. at the same time, the process of its hy - brid intelligent algorithm is also provided

    以油措施增產最大化為目標,兼顧成本、措施量等目標,建立了油措施配置的隨機機會約束規劃,並給出了的混合智能演算法。
  11. In this paper, first introduce the geologic model of continental sedimentation, the rock physics expression about oil and gas reservoir of shengli oil filed

    本文首先介紹了陸源沉積儲層的地質,勝利油部分油、氣儲集層的巖石物理學特徵。
  12. In the brief introduction to geographical information system ( gis ), this dissertation proves that by combining reliable management with gis technology, presents a method which built the power structure model and math calculation model by using spatial data in a good interface between computer and user. this dissertation makes a number of target for calculating the distribution system, mainly aimed at circumstances which have an effect on power station repair, switch breaker, type of t connection, and double lines supply via the usage of system reliability calculation. at the same time, it provides the projected estimatio n when power station or transmission line will be added into the power system, and furnishes the theoretical information that the professional needs for power structure programming, design and equipment management

    通過建立輸變電設施管理信息系統( mis ) ,真實地反映出油電網輸變電設施的運行管理現狀,為網路可靠性計算提供可靠的計算依據;在簡述地理信息系統( gis )技術的基礎上,論證了可靠性管理與電力gis技術結合的可能性,創立了在簡潔的人機圖形界面下利用空間數據建立網路結構及可靠性計算的方法;通過建立網路可靠性計算系統,進行了計及變電所檢修影響、切換開關、 t接點及雙回線供電情況下的可靠性指標計算分析,對油電網及變電所(線路)的改(擴)建方案、增強性措施及接入系統的可靠性給予了工程評估,為電網規劃、設計及日常的設備管理提供分析決策依據。
  13. The wms is composed of specialist recommending module, instance module, the amount of soil film estimating module, frequent ask question & machine module. the weight - based rule, the product rule and the model - based rule is established to present the knowledge. the wheat mulching experiment bank of part loess plateau, the spatial resolving rate is town ( xiang in china ), is set up

    子系統由專家推薦塊、實例查詢塊、地膜用量塊、常見問題和常用機械塊組成;系統採用了基於權重規則、基於產生式規則和基於的知識表示方法;建立空間解析度為鄉(鎮)的黃土高原部分地區的小麥地膜試驗數據庫;給出了地膜用量的計算,適用於不規則塊地膜用量的估算。
  14. Applying spatial interpolation and data topographty model, realizes that isoline data create grid data, forms surface and makes three - dimensional geological body, according to the actual demands in oil and gas field development

    運用空間插值、數字地形等方法,根據油氣開發中的實際需要,實現由等值線數據生成網格數據,形成構建表面,最終得到三維地質體。
  15. The model could be used to match and predict the entire process of oil - gas field development, including the periods forproduction rate going up, peaking, and gelling down, for all development index, with its precision higher than all the other models, and can be widely recommended

    可以對油氣開發全過程,其中包括產量上升、達到高峰與產量下降階段在內的整個開發指標進行擬合與預測,其精度要高於其它各種,具有推廣價值。
  16. This paper, based on normalizing well logging data while drilling and correcting depth into true vertical depth and calculating reservoir parameters and etc, combining the practical ease of mobei oilfield, extracted logging and geological pattern characteristic of target oil - gas formation and geosteering mark formation, and used bp neural network and regressive analysis to create predicting mode of geosteering parameter to build relevant contrast curve ; adopted geometry geosteering method to fix on die drilling direction of bit upper and declination, the position in reservoir, to judge the real drilling case. all finely solved the problem to follow the geological target while drilling for three horizontal well these methods improve the drilling horizontal well ability by using the techniques to follow the geological target while drilling, and then it is convenient and practicable

    本文在開展隨鉆測井資料的標準化和斜井校正及儲層參數解釋與含流體性質判釋等工作的基礎上,結合研究工區莫北油的實際情況,提取了目標油(氣)層和導向標志層的測井地質式特徵,並採用bp神經網路法和回歸分析法建立了地質導向參數的預測、構造了相應的對比曲線;採用幾何導向法確定鉆頭上下傾鉆進方向及其在目標層的位置,以判斷實際鉆進地層情況,很好地解決了研究工區三口水平井的隨鉆跟蹤地質目標的問題。
  17. It can reflect mechanical characteristics of geological model for the field of geostress in the oil field correctly and truly. it has very high efficiency also

    它能較準確地反映油應力場地質的力學特性,精度高,也有很高的效率。
  18. A real example testifies the efficiency, practicability and intellectual ability of this method, which provides a new decision basis for the incremental measures program of oilfield

    實例表明,該理論基礎嚴格,求解方法科學有效,並具有一定的智能性,為油措施配置提供了新的決策依據。
  19. According to the competence construction theory and based on the scrupulous and rigorous " transplantation " of geological mechanics model in developing oil field, this paper reveals the internal organism of talent internationalization strategy, puts forward the ideas of " ecological " environment, transition organism of accumulation and reasonable utilization strategy for internationalized talents

    摘要依據能力建設理論,在有內在根據、審慎嚴謹地「移植」基於地質力學開發油田模型的基礎上,揭示出人才國際化戰略的內在機理,提出了國際化人才產生的「生態」環境、集聚的遷移機制、合理的使用策略。
  20. Numerical simulation of foundation deformation under asymmetrical loading with the finite element method was performed by use of the cam - clay model and the ohta - sekiguchi model

    摘要用劍橋和關口太田模型對偏載作用下的地基變形進行了有限元數值擬,並結合真三軸試驗成果比較分析了這2種柔度矩陣的特點。
分享友人