由井 的英文怎麼說

中文拼音 [yóujǐng]
由井 英文
yoshii
  • : causereason
  • : Ⅰ名詞1 (從地面往下鑿成的能取水的深洞) well 2 (形狀像井的東西) sth in the shape of a well 3 (...
  1. Sq - a setting - ball carrier assembly is system which can help hydraulic liner hanger to hang liner in horizontal or high - deviated wells. it comprises setting - ball carrier, latch collar and baffle

    一種幫助液壓尾管懸掛器在大斜度及水平中座掛的特殊裝置,與尾管懸掛器配套使用,可保證尾管固的順利完成。送球器、鎖緊座、擋板組成。
  2. Since the crater-hole breakage is of great importance, it can be advisable to use a larger drill hole than the others in the raise.

    於漏斗炮眼的爆破效果非常重要,故天爆破宜採用較大的炮眼直徑。
  3. The drill and petroleum extraction tools test - well is made up of the multifunction test - machine system ( hydraulic system ), the calefaction system the circulation system, the testing system and the assistant system

    鉆采工具試驗多功能試驗機系統(液壓系統) 、加熱系統、循環系統、測試系統和輔助系統組成。
  4. Abstract : duri ng concrete deep well constructi on , because of thediffi culti es i n engi neeri ng geographi cal conditi ons , the ordi nary bilateral hydrauli c sli di ng formwork technology can not be adopted. therefore , an unilateral sli di ng formwork technology lifted by chai n block method can beappli ed to advantage and better solved the proble m

    文摘:在混凝土深施工中,於受地理環境的限制,不能內外安裝模板時,難以應用一般的液壓滑模施工技術,而採用單面模板、鏈條葫蘆提升滑模工藝,可較好地解決這一問題。
  5. Based on the development feature analysis, this paper studies thoroughly the reservoir flood feature and remaining oil distribution through the microstructure, sendimentary phase, reservoir heterogeneity and well control, and proposes the comprehensive adjustment based on the injection and development well net structure and improvement the result of the research is obvious with the production degression rate from 9. 14 % of 1997 to present - 1. 46 %, and water rate from original 0. 33 % to present 0. 16 %. in summary, the research idea, method and new achievement of the thesis provide a scientific geological basis for the oilfield development improvement

    在對本區開發歷程和開采特徵分析的基礎上,從微構造、沉積微相、儲層非均質性、網控制等方面深入地分析了油藏水淹特徵及剩餘油分佈規律,提出了以完善注采網、調整注采結構為目的的綜合調整措施,已見到了明顯的效果:油田遞減1997年的9 . 14降至目前的- 1 . 46 ,綜合含水上升率原來的0 . 33降至目前的0 . 16 。
  6. The relational expression of the speed difference of drum and spiral propeller ( 0 ) and the difference of drum speed and input speed of the differential gear ( 1 ) is derived

    於鉆液的比重和粘度是隨下情況變化的不確定值,且現場對鉆液的處理量時有變化,需隨時調節0或1以調節離心機的處理能力和效果。
  7. Along the central axis there are the porch, entrance hall, middle hall, main hall, the first chamber room, the second hall and the second chamber room. each hall has an entry and between two halls there is an open lane tianjing, on which a little attic with a wing or dormer window is constructed for skylight and air circulation

    中軸線前而後,依次為門廊門廳轎廳正廳頭房二廳二房,每廳為一進,廳之間用小天隔開,天上加小屋蓋,靠高側窗水窗或天窗採光通風。
  8. Along the central axis there are the porch, entrance hall, middle hall, main hall, the first chamber room, the second hall and the second chamber room. each hall has an entry and between two halls there is an open lane ( tianjing ), on which a little attic with a wing or dormer window is constructed for skylight and air circulation

    中軸線前而後,依次為門廊、門廳、轎廳、正廳、頭房、二廳、二房,每廳為一進,廳之間用小天隔開,天上加小屋蓋,靠高側窗(水窗)或天窗採光通風。
  9. Based on analysis of geologic foundation record about pingzhuang basin, a lot of sino - foreign geothermal geology record and investigation of field geology, measuring of ground temperature in person and geo - chemical analysis of ascension spring, gushing water of fault, the fact that the anomaly of geothermal gradient of pingzhuang basin, which is in region of low geothermal gradient, is caused by redistribution of conduction - oriented geothermal heat flow which is result from upheaval and depression of basin foundation bed is pointed out. after the field of ground temperature is simulated under the background of conduction - oriented geothermal heat flow by means of ansys, the characteristic of ground temperature distribution of top surface of basin foundation bed ( yixian team ) is revealed. the sound condition of transmissibility fault and feeding water source, which are imperative in formation of the low - medium temperature geothermal system of convective type, is possessed in pingzhuang basin

    通過對平莊盆地基礎地質資料、國內外大量地熱地質資料的分析和野外地質調查、礦實測地溫以及上升泉、斷層涌水的地球化學分析等工作基礎上,指出地處低地溫梯度背景區的平莊盆地地溫梯度異常是於盆地基底隆起和坳陷引起傳導型大地熱流再分配所致;運用州sys數值模擬了大地熱流向地表傳導背景下的盆地地溫場,從而揭示了盆地基底(義縣組)頂界面地溫分佈特徵;闡明了盆地具有形成中低溫對流型地熱系統所必需的導水斷裂、補給水源等的良好條件,中低溫對流型地熱系統是地熱勘查的主要對象;圈定了平莊盆地北部朝陽溝?駱駝營子地熱勘查遠景區。
  10. Ground water is usually removed by man through wells.

    地上水一般是人們從裡汲上來。
  11. The jdf - 2 type case hanging basket guards against automatically falls mainly uses in the direct motor drive hoisting mechanical well type case hanging basket, as the type case hanging basket using of safekeeping of security, it installs in the hanging basket crossbeam both sides, along including guide rail is rising and falling, when the motor drive type case hanging basket in the fluctuation process, meets overweight, overspeed, steel wire attrition and other reasons creates the hoisting cable or the junction device snaps suddenly, when under hanging basket weightlessness falls, guards against falls can automatic brake, thus achieved avoids falling the basket to offend somebody

    Jdf - 2型字架吊籃自動防墜器主要用於電動機驅動的卷揚機字架吊籃,作為字架吊籃的安全保護之用,它安裝在吊籃橫梁的兩側,沿含著導軌升降,當電動機驅動的字架吊籃在升降過程中,遇超重超速鋼絲繩磨損等原因而造成提升鋼絲繩或連接裝置突然破斷,吊籃失重下墜時,防墜器能自動剎車,從而達到避免墜籃傷人重大事故發生的目的。
  12. Being lacking of understanding of behaviors of circular working shaft, the paper proposed theory about ring - beam ' s load - distribution calculations and analyzed the structural behavior of circular working shaft ( cws ) by the numbers from the standpoint of properties of structural style and stress incorporated with thoughts of shared load introduced to research of cws. first, regarding cws as structure of series of hypothetic horizontal circular rings and vertical beams, and considering cws ' s formation and development, the paper proposed load - distribution thoughts to solve cws ' s calculations. ring - beam calculation theory was put up and software cbtlmp1. 0 was worked out based on the conditions of external applied load shared by rings and beams, and of deformation conformity

    首先,本文提出用分載思想解決圓形工作結構的計算分析問題,將圓形工作結構看成是一系列的假想的水平圓環和豎直梁組成的結構,考慮工作形成過程及形成階段與項進階段的連續性,根據某一時刻相對于上一時刻外載增量環與梁分擔、環與梁在交叉處變位增量一致的條件將環計算理論與梁計算理論結合起來,據此建立了環?梁分載計算理論並研製了環?梁分載計算分析軟體cbtlmpv1 . 0 。
  13. Kongxi buried hill shows following features in the seismic profiles : the structures are asymmetric. there is flexural syncline on the east side and a monocline on the west side. asymmetric repetition of stratigraphic units is present in the drill wells and the dips of beds and faults are gentle. the permo - carboniferous system of both sides almost lie in the same slope and the events of cambrian or upper proterozoic are continuous from east to west. the phenomenas suggest that kongxi buried hill could be a thrust belt been traced which consists of reverse faults. the imbricate faults mainly effect pre - jurassic strata. there are obvious angular unconformity between jurassic - cretaceous system and paleozoic involved deformation of thrust. the thrust front in some place has cut off the beds of jurassic - cretaceous system. the structural style of the thrust structure changes along the strike of the kongxi buried hill

    地震和鉆資料揭露的孔西構造帶前第三系潛山的地質特徵可以歸納為:構造帶總體上不對稱構造帶內部有地層重復現象石炭二疊系地層的位置明顯高於兩側的同一地層的高度。用34條向東傾斜的逆沖斷層組成的疊瓦扇構造模式能夠比較合理地解釋上述地質特徵。該帶向東傾斜的逆沖疊瓦狀斷層組主要影響前侏羅系地層,侏羅白堊系與捲入逆沖構造變形的古生界地層之間有明顯的角度不整合。
  14. Igawa is the third japanese player posted this winter, joining matsuzaka and infielder akinori iwamura, whose rights were acquired by the devil rays for about $ 4. 5 million

    川慶是今年冬天第三位開放競標的日本選手,前兩位分別是松坂大輔和內野手巖村名憲,這名內野手稍早魔鬼魚隊以450萬美金得標。
  15. Shin takuma, yusuke tomoi, yumiko shaku, ko takasugi

    宅麻伸,友雄亮,美子,高杉
  16. An increase in background gas, as the mud weight overbalance gradually decreases

    於鉆液密度逐漸下降失去平衡,鉆液的含氣量上升。
  17. The instrument system is made up of main instrument system, gross logging detector system, logging winch control system, data acquisition and processing system

    該系統主要由井上主機系統、總量測探管系統、測絞車控制系統、數據採集及處理系統等組成。
  18. The existing tung chung road between lung tseng tau and cheung sha is inadequate to cope with existing and future traffic demands in terms of capacity and safety

    現時由井頭至長沙的一段東涌道,無論在容車量或交通安全方面,都不足以應付現時和日後的交通需求。
  19. Drainage domain of partial penetration gas well in bottom water reservoirs consists of the following two parts : ( 1 ) non - darcy binomial radial flow near the well ; ( 2 ) three dimensional darcy flow in areas far away from the partial penetration gas well due to bottom water drive

    摘要底水打開不完善氣的滲流是由井附近區域遵循二項式徑向流規律的非達西流動及此區域外遵循底水驅動向不完善三維達西流動兩部分組成。
  20. This paper describes a computer telecontrol and telemetering system which main purpose is to realize automatic monitor of pressure of powered supports in fully mechanized coal face. this monitoring system is composed of underground part and ground part. the ground part includes a computer, a printer and a ground receiving mainframe. the underground part includes electric source, a communication extension, some pressure extensions and sensors

    本文論述一種旨在實現綜采工作面液壓支架壓力自動監測的計算機遙控遙測系統。該監測系統由井上和下兩部分組成。上部分包括計算機、印表機、繪圖儀、地面接收主機等;下部分包括電源、通訊分機、壓力分機和傳感器等。
分享友人