留礦開采法 的英文怎麼說

中文拼音 [liúkuàngkāicǎi]
留礦開采法 英文
shrinkage method
  • : Ⅰ動詞1 (停止在某處不動; 不離去) remain; stay 2 (使留; 不使離去) ask sb to stay; keep sb where...
  • : 名詞1. (礦床) ore [mineral] deposit 2. (礦石) ore 3. (開采礦物的場所) mine
  • : 采名詞(采地) feudal estate
  • : Ⅰ名詞1 (由國家制定或認可的行為規則的總稱) law 2 (方法; 方式) way; method; mode; means 3 (標...
  1. The ground base of the newly added chute in 4 tailings reservoir at dexing copper mine is characterised by thick weathered layer, loose structure, fractured zone and landslip mass accumulation. as a result, the ground has a great subsidence and inefficient carrying capacity. in view of this, the grouting technology was adopted to reinforce the chute ground base. the on - site testing shows that the subsidence of the chute has been efficiently controlled and the carrying capacity of the ground base improved so that the stability requirement has been met

    潘洛鐵主要使用的是淺眼落的全面全面. 23體160m以上段上部為氧化和風化巖層,形成擠壓爆破和鬆散巖石覆蓋下的放條件.介紹了無底柱分段崩落在該中的應用.實際使用獲得的各項技術經濟指標還比較理想
分享友人