疏水水泥 的英文怎麼說

中文拼音 [shūshuǐshuǐ]
疏水水泥 英文
hydrophobic cement
  • : Ⅰ動詞1 (疏通) dredge (a river etc )2 (疏忽) neglect 3 (分散; 使從密變稀) disperse; scatte...
  • : 名詞1 (由兩個氫原子和一個氧原子結合而成的液體) water 2 (河流) river 3 (指江、河、湖、海、洋...
  • : 泥名詞1 (含水的半固體狀的土) mud; mire 2 (像泥的東西) any paste like matter; mashed vegetable...
  • 水泥 : cement; -lith
  1. In order to reduce the re - deposit volume of the dredged channel, the method must be based on decreasing the oncoming sediment, changing the mouth site, builting the sediment control dam and raising the reservoir level

    為了最大限度地減小浚挖槽的回淤量,必須依靠控制上游來沙量、調整入口門位置、加設防淤堤及提高庫位等手段,而不能通過調整挖槽寬度、位置及數量等措施來達到目的。
  2. The work of this paper lays the solid foundation for the experimental research on dredging pump performance and hydraulic transport properties

    本文所作的工作為泵與管道力輸送實驗系統的實驗研究打下了堅實的基礎。
  3. Dredging pump and hydraulic transport experimental system proposed in this paper is mainly used for the experimental study of dredging pump performance and the solid - liquid two - phase flow in pipelines

    本文研製的泵與管道力輸送實驗系統,主要用於泵性能及管道固液兩相流的測試研究。
  4. The oozing out of a large quantity of muddy water from the base or the weep holes of a slope indicates that the slope is saturated with water

    斜坡底部或孔有大量透出時,顯示斜坡內的份已飽和,斜坡之中段或頂部有裂
  5. Correspondingly, its theory is up to developed to a higher level. in this thesis, taking the risk management activities of the two parties of insurance as the perceptive and the process of engineering insurance as the clue, the establishment of risk management system is analyzed during the process of risk identification and evaluation, insurance contract arrangement, disaster prevention and loss reduction, and the compensation management. furthermore

    本文在查閱大量文獻的基礎上,對泵及排管道的動態特性現象進行了分析,並應用面向對象的c + +語言開發了比較通用的計算機程序,對緊急關閥、下挖掘機具(如絞刀、斗輪等)吸口堵塞以及事故拋泵等典型的動態工況特性進行了計算和分析。
  6. This paper summarize the estuary sediment management methods also, analyze and the following aspects and give evaluations : estuary dredging and lead the flow, lead water to scour the river channel, build the xihekou reservoir, estuary gate deposition management, dike reinforced etc

    本文還對河口沙的處理途徑和措施進行了概括總結,對河口浚與導流、引海沖刷河道、建設西河口利樞紐、攔門沙治理、人工有計劃改道和出漢、加高堤防和加固防護工程和挖河固堤工程等進行了分析評價。
  7. Due to issues of dongting lake districts flood composition, the evolution of sediment flow, the river and lake ( r & l ) distribution characteristic as well as the layout of r & l - dredging engineering, the article simulated the model of the dongting lake terrain change by using the gis technology and adopted the limited volumetric method to establish the two - dimensional hydraulics computation model of lake in order to forecast the water level, the flow capacity, the speed of flow and changes of flow field after implemented the project, which have provided the reliable theoretic basis for the decision - making and implementation of renovation for river course, canal and harbor and river course - dredging engineering

    摘要針對洞庭湖區的洪組成、沙演變、河道湖泊系分佈特點以及河道湖泊浚工程布局情況,利用gis技術模擬洞庭湖地形變化,採用有限體積法建立了湖泊二維力學計算模型預測浚工程實施后的位、流量、流速流場變化,為河道、航道港口整治、河道浚清淤等工程決策與實施提供了可靠理論依據。
  8. In the working of cutter suction dredger, the slurry is transported by solid - liquid two - phase flow that is consisted of sand and water. this method cannot carry slurry too long, so some projects cannot be taken on

    在絞吸式挖浚作業中,漿是由沙和組成的固-液兩相流得以輸送的,往往因排距離不長而使許多工程無法承擔。
  9. The dredger is one of major facilities in the fields of channel dredge, hydro project, prevent or control flood, ocean development, seaport construction etc. at present, the management maintenance methods of dredger are primary time based maintenance and run - to - breakdown maintenance

    船是航道浚與整治、利工程、防洪搶險、海洋開發及海港建設的主要工具。目前對挖船管理維修的方法主要有定期維修和事後維修。
  10. Sparedescription : tendency of deposition in the guanting reservoir and dredging on mouth bar of the guishuihe estuary are analyzed by the data from the model experiments

    描述:在實體模型試驗的基礎上,對官廳庫的沙淤積發展和媯河口攔門沙的清淤浚措施進行了研究。
  11. Earthworms are used at nutrilite because they help to aerate the soil, speed up decomposition of plant material plowed back into the soil, add natural humus material called castings and break up water channeling through tunnels for dispersion

    39健爾力利用蚯蚓幫助通土壤的空氣,加快植物分解並重新溶入土中,為土加入天然的腐植質,同時,蚯蚓在土中四處鉆動,有助分滲透。
  12. Flume experimental study on the loss of dredging spoiling under the action of wave and current

    波浪流作用下浚拋損失的槽實驗
  13. It proposes that under the drying climate background, the lakes disappeared mainly because that : firstly clay and sand silted up by the yellow river flooding ; secondly human activities generated great effects

    認為在氣候變乾的大背景下,湖泊消失的原因主要有兩個:一是黃河泛濫所造成的小清河流域的沙淤積;二是浚河道、圍湖造田、過渡利用資源等人類活動的影響。
  14. This article introduced the method of geological investigation of nanling tunnel karst disease, elaborated the tunnel engineering geology conditions, especially the karst water, the karst water power channel and the harm of karst water, and analyzed the cause that produced the karst disease

    摘要南嶺隧道巖溶地下活動造成地表坍陷、洞內砂淤塞等病害,其原因在於隧道施工遺留的導洞長期排巖溶,採用地質測繪、物探、鉆探、文地質試驗等綜合勘察方法,查明地下通道位置、地下流速、流向,針對病害原因,提出攔截、封團、排、填充等綜合整治方案。
  15. Risk factors are old age, poor cardiopulmonary compliance, pathological fracture, osteoporosis, large amount of cement, excessive pressurization with cement gun, and a previously undis - trubed intramedullary canal

    危險因子包括老年人,術前較差的心肺狀態,病理性骨折,骨質鬆,使用大量的骨或骨槍以進行骨髓腔管內加壓作用,未曾被擴鉆過的骨髓腔。
  16. Dredging operations will be carried out in the ponds to ensure that contaminated sediments are not inadvertently allowed into the new drainage channel

    池塘會進行挖作業,確保受污染的沉積物不會因忽而流入新的排道。
  17. This paper designs the characteristic curves and system curves for the dredging materials of the water and all kind of mixtures, which base on the theory of hydraulic dredging and the experiment data of prototype dredger, then puts out the equations of computing the work point of dredge pump system and the model that can simulate the work condition of dredging pump such as the flow rate, vacuum and pressures

    該模型根據浚原理和1750挖船的技術數據,設計了泵和管路的清特性曲線與漿特性曲線,在此基礎上給出了泵工作點的計算方法。最後給出了計算泵工況的模型和模擬實例; 3 、絞刀電動機拖動系統。
  18. The biomechanical influence of vertebroplasty with filling with autosolidification calcium phosphate cement

    胸腰椎骨質鬆骨折行磷酸鈣骨灌注成形的生物力學實驗
  19. The main contents related to the scheme were introduced as follows : the characteristics and status of sediment pollution, the determination of the range, the depth, and the scale of sediment dredging projects, the treatment of dredged sediment, the disposal of the remaining water, etc

    詳細闡述了該方案涉及的主要內容:底污染特性及污染狀況分析,浚平面范圍、浚深度及浚工程規模的確定,浚底處置及余處理等。
  20. ( 4 ) as to different organic silt, make use of cement - gypsum compound material as solidification additives for silt solidification, comparatively studied the solidification effect, summarized the improving rule of gypsum to cement and proposed a method for treating high organic matter content silt

    ( 4 )對不同有機質淤,採用?石膏進復合型固化材料進行固化,對固化效果進行了對比研究,對石膏促進固化效果的規律進行了總結,從而提出了大量發生的有機質含量偏高的浚淤固化問題。
分享友人