疏浚區 的英文怎麼說

中文拼音 [shūjùn]
疏浚區 英文
dredged area
  • : Ⅰ動詞1 (疏通) dredge (a river etc )2 (疏忽) neglect 3 (分散; 使從密變稀) disperse; scatte...
  • : 浚構詞成分。
  • : 區名詞(姓氏) a surname
  • 疏浚 : dredge; sweep; scouring疏浚工程 dredging work
  1. By analyzing on nature, society and economy conditions as well as distribution characteristics of sand source in the lower lhasa river valley, put forward a series of comprehensive renovation scheme to harness sand sources, mainly including dredging channel, planting farmland shelter - forest network, constructing arbor - bush - herb shelter forest and shifting sand stabilization, this scheme will not only control blown - sand threat, and improve local ecological environment ; at the same time, also lay the strong foundation for enlarging lhasa city space and effectively utilizing local resource, embody a sustainable thought on how to make comprehensive renovation in high cold valley region

    摘要在深入分析本自然社會經濟條件和風沙源分佈特徵基礎上,提出把拉薩河下遊河道與風沙源治理相結合,以河道、農田防護林、喬灌草防風護沙林和流沙固定等物理工程、生物和機械措施為主體,進行風沙源綜合整治,一方面可有效控制風沙災害的威脅,改善河谷生態環境,同時為拉薩市城市空間發展和當地資源的有效利用奠定了基礎,體現了在高寒河谷進行風沙源綜合整治的可持續性思路。
  2. So far, china has designated 34 dumping areas for dredged materials of the third category and four areas for midair oil discharge

    到目前為止,中國已建立了34個三類物傾倒, 4個空中放油
  3. Due to issues of dongting lake districts flood composition, the evolution of sediment flow, the river and lake ( r & l ) distribution characteristic as well as the layout of r & l - dredging engineering, the article simulated the model of the dongting lake terrain change by using the gis technology and adopted the limited volumetric method to establish the two - dimensional hydraulics computation model of lake in order to forecast the water level, the flow capacity, the speed of flow and changes of flow field after implemented the project, which have provided the reliable theoretic basis for the decision - making and implementation of renovation for river course, canal and harbor and river course - dredging engineering

    摘要針對洞庭湖的洪水組成、水流泥沙演變、河道湖泊水系分佈特點以及河道湖泊工程布局情況,利用gis技術模擬洞庭湖地形變化,採用有限體積法建立了湖泊二維水力學計算模型預測工程實施后的水位、流量、流速流場變化,為河道、航道港口整治、河道清淤等工程決策與實施提供了可靠理論依據。
  4. The first - stage construction of dayaowan has formed a region about 1 km2 by dredging. in this area, because the dredging points were set scarcely, soil formed becomes a regional and radial distribution, in which the soft deposits occupies about 40 %

    大窯灣一期工程利用吹填形成了約1km的域,在此域中,由於設置的吹填點較少,形成的土質呈域性放射形分佈,軟基佔40左右。
分享友人