盾構掘進 的英文怎麼說

中文拼音 [dùngòujuéjìn]
盾構掘進 英文
shield drivage
  • : 名詞1. (盾牌) shield2. (荷蘭、越南、印度尼西亞等國的本位貨幣) guilder (荷蘭); dong (越南); rupiah (印度尼西亞)
  • : Ⅰ動詞1 (構造; 組合) construct; form; compose 2 (結成) fabricate; make up 3 (建造; 架屋) bui...
  • : 動詞(刨; 挖) dig
  • : 進構詞成分。
  1. Accordingly, this paper " emphases are placed in these unfathomed problem, and the work and research hereinafter was done : 1 ) the initial and perfect state of soil in pressure chamber was brought forword, and some reason about breakdown or problem due to soil condition was analyzed concisely. 2 ) aimed at the blocking, the mechanism of this problem is studied. the doming model of soil in pressure chamber is built

    目前關于閉塞的研究普遍存在幾個盲區: 1 )對閉塞的定義,即究竟在中哪些發生的現象是閉塞: 2 )閉塞的發生機理,即閉塞到底是如何發生的: 3 )影響閉塞發生的主要影響因素; 4 )閉塞發生后應該如何有針對性的採取處理措施。
  2. Manaage the historical data by dafabase and then analyse the major factor which affect the position of shield machine, then educe the relation between geology and the pressure of jack so as to control the position of shield machine more effectively

    摘要基於盾構掘進的已有歷史數據,建立數據庫對盾構掘進數據行管理,分析挖影響姿態的主要因素,並得出地質條件與盾構掘進千斤頂推力之間的關系,更有效地實現的姿態控制。
  3. Example of development of cutterhead of shield machine

    盾構掘進機刀盤研製實例
  4. Tunnelling machines - shield machines, thrust boring machines, auger boring machines, lining erection equipment - safety requirements

    隧道機.機止推鉆孔機螺旋鉆探機襯里安裝設備.安全要求
  5. Tunneling machines - shield machines, thrust boring machines, auger boring machines, lining erection equipment - safety requirements ; german version en 12336 : 2005

    隧道機.機止推鉆孔機螺旋鉆探機襯里安
  6. After comparing three repair scenarios, the following methods were chosen : injecting modified mud to heading face through mud supply tubes of the shield construction machine to block water seepage on the heading face ; then maintenance worker entering the cabin under pressure to replace damaged seal and press cutterhead

    經分析對比,最終選擇了從機供漿管道向刀盤面壓注改性泥漿,對行封堵止水,維修人員帶壓艙,更換密封與壓盤的方法。
  7. Design analysis of cutterhead for combined shield machine

    復合型盾構掘進機刀盤的設計分析
  8. Waterproof technique in tunneling of earth press balancing shield machine

    土壓平衡盾構掘進中的止水技術
  9. The primary contents are as follows : 1. according to the feature and the theory of shield tunnel construction, based on the factors that cause effects on environment, the workable monitoring project is established, which include principles of design, the selection of monitoring cross section, the layout of monitoring points, monitoring content and materials feedback. such as operation program, selection of earth pressure, wall - back grouting, rectification of shield machine, which are used to reduce the effect of construction on environment, are analyzed in detail

    完成的主要研究內容如下: 1 、根據法的施工特點及原理,在明確了施工安全影響因素的基礎上,從監測方案設計原則、監測斷面的選擇、監測點的布置、監測內容以及信息反饋等出發,提出行之有效的監測方案;詳細分析了模式、土壓力選擇、壁后注漿、糾偏等施工控制手段,用來減小施工對周邊環境的影響。
  10. According to this practical project, beijing metro no. 10 line crosses under the beijing metro no. 13 line existed station structure, this paper has made an overall and systemic analytical study on crosswise surface settlement and the longitudinal surface settlement process which influence by metro tunnel construction with shield driven method through analyzing a mass of site monitoring data. the settlements in different period are concluded, the crosswise surface settlement influence scope, some construction factors to surface settlement has been analyzed too

    本文針對北京地鐵十號線芍藥居至北土城東站區間隧道下穿既有城鐵十三號線芍藥居車站結這一實際工程,通過大量的現場監測資料分析,研究了盾構掘進過程中對橫向地表沉降和縱向地表沉降的影響過程;探討了盾構掘進各個階段的沉降占總沉降量的百分比;分析了盾構掘進對橫向地表沉降的影響范圍,以及各種施工因素對地表沉降的影響。
  11. Aiming at the design requirements of shield tunnelling machine for simulator test rig, hydraulic systems of shield were designed and manufactured by applying electro - hydraulic proportional control technology, which included thrust hydraulic system, screw conveyor hydraulic system and cutting wheel drive hydraulic system

    摘要針對盾構掘進機模擬試驗臺的設計要求,採用電液比例控制技術設計製造了盾構掘進機液壓系統,包括推液壓系統,螺旋輸送機液壓系統以及刀盤驅動液壓系統。
  12. Now he is a registered surveyor of singapore, mainly engaged in various services relating to surveying & mapping as well as relevant software r & d, including shield tunnelling survey and automated real time 3d monitoring

    現為新加坡注冊測量師,主要從事各種測繪專業技術服務以及相關的軟體研發工作,包括隧道盾構掘進測量與自動化實時三維監測。
  13. A mathematical model and the related parameters for epb shield tunneling

    土壓平衡盾構掘進的數學物理模型及各參數間關系研究
  14. This method and its procedure are described in detail in this paper

    文章重點介紹了盾構掘進中主軸承密封的修復方法及步驟。
  15. ( 5 ) the nn ( neural network ) prediction model of ground settlement in the shield tunneling is proposed

    ( 5 )探討和研究了神經網路模型在盾構掘進時引起的地表沉降預測方法及安全性評價。
  16. The experimental results showed that the designed hydraulic systems could meet the tunnelling requirements of shield at all kinds of geological conditions

    試驗結果表明所設計的液壓系統可以滿足盾構掘進機在各地層中模擬的要求。
  17. Based on the tunnel construction between gubei road station and zhongshan park station, this paper introduces the design and manufacturing techniques, features and application of the first homemade earth pressure balance shield machine in the tunnel construction of metro

    摘要以上海軌道交通古北路站中山公園站區間隧道為工程背景,介紹我國首臺用於地鐵隧道施工的加泥式土壓平衡盾構掘進機的設計製造工藝、技術特點和工程應用情況。
  18. The direction guidance system plays an important part in the shield excavation, such as the prevention of snake motion, the reduction of ground settlement of tunnel construction and the insurance of tunnel quality etc. based on the principle of guidance system, a precise direction guidance system with high accuracy, high efficiency and more reliability is developed, it has the advantages of less times of surveying, real time positioning and shield behaviors monitoring

    導向系統是盾構掘進時的指揮系統,對指導盾構掘進、隧洞貫通、減少地表沉降以及保證隧洞的質量等具有重要的作用。本文在研究導向工作原理的基礎上開發研製了一套導向系統,精度高、工作可靠,可極大地縮短導向測量的時間和減輕勞動強度,實現了盾構掘進的實時定位和姿態監測。
  19. In the course of digging, a main bearing seal at the cutterhead of avn3080 water leak type shield construction machine made in germany was damaged

    摘要德制avn3080漏水平衡式機在過程中,刀盤主軸承密封損壞,對此提出3種修復方案。
分享友人